Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 3 of 8  Not logged in ELOG logo
Entry  Monday, June 26, 2017, 13:36, Laura Lambert, Ta #53, HP-SIS, , TM2, 42218-6, , Ready, Ta#53 target description 
Entry  Tuesday, September 26, 2017, 12:07, Laura Lambert, Ta#54, HP-SIS, ITW, TM2, 42218-10, , Ready, Ta#54 target description 
Entry  Friday, May 31, 2019, 16:11, Aaron Schmidt, Ta#58, LP-SIS, ITE, TM2, 43044-4, 42972-7, Ready, Ta#58 Target desription Ta#58_Loading_data.pdf
Entry  Tuesday, July 30, 2019, 15:52, Darwin Ortiz Rosales, ZrC#8, LP-SIS, ITE, TM2, 43044-5, , Ready, Target description ZrC8.pngZrC_8_SEM.pdf
Entry  Tuesday, September 17, 2019, 08:47, Aaron Schmidt, Ta#59, LP-SIS, , TM2, 44062-5, , In progress, Ta#59 Target description Ta#59_Loading_Data.pdf
Entry  Friday, October 11, 2019, 09:26, Darwin Ortiz Rosales, SiC#38, HP-FEBIAD, , TM2, 42464-4, , Ready, Target SiC#38 Description SiC#38.PNG
Entry  Friday, November 29, 2019, 10:53, Darwin Ortiz Rosales, SiC#39, HP-FEBIAD, , TM2, 42464-3, , Ready, Target SiC#39 Description SiC#39_description.PNGSiC39_SEM.pdf
Entry  Tuesday, September 29, 2020, 11:50, Marla Cervantes, C#2, LP-SIS, ITW, TM2, 44139-9, , In progress, Target C#2 Description  C2-Description.JPG
Entry  Monday, August 16, 2021, 11:02, John Wong, UCx#34, LP-SIS, ITW, TM2, 44691-5, 44378-1, Ready, Target description  UCx#34_target_description.PNGUCx_34_SEM_Density_Measurements.pdf
Entry  Tuesday, June 21, 2022, 15:34, Matthew Gareau, SiC#42, SiC#43, , , TM2, , , Problems/Solutions, Multipin guide pin issues 
Entry  Friday, June 23, 2023, 09:02, Aaron Schmidt, Nb#10, LP-IG-LIS, ITW, TM2, 45447-7, , , Nb#10 target description. 
Entry  Thursday, August 24, 2023, 14:16, Aaron Schmidt, Nb#11, LP-IG-LIS, ITW, TM2, 45447-9, , In progress, Nb#11 Target description Nb#11_Target_Loading_Data.pdf
Entry  Wednesday, September 20, 2023, 14:25, Aaron Schmidt, Ta#66, LP-SIS, ITW, TM2, 45220-5, , In progress, Ta#66 Target description. Ta#66_Target_Loading_Data.pdf
Entry  Tuesday, August 13, 2024, 10:08, Aaron Schmidt, Ta#67 Thin Foil Target, LP-SIS, ITE, TM2, 45447-14, 45235-10, Ready, Ta#67 Thin Foil Target description & Notes Certificate_of_Analysis_-_Ta_0.01mm.pdf
Entry  Friday, September 20, 2024, 14:26, Aaron Schmidt, Ta#, LP-SIS, ITE, TM2, 45447-18, 45235-13, Ready, Ta# Target Description 
Entry  Monday, October 07, 2024, 13:16, Aaron Schmidt, Ta#68, HP-SIS, ITE, TM2, 45447-26, 45235-16, Ready, Ta#68 Target Description ITE-TM2-Ta#68-HP-SIS_Target_Loading_Data.pdf
Entry  Friday, June 03, 2011, 09:16, John Wong, Ta#37, LP-SIS, ITW, TM1, 38634-5, 36833-7, Spent, Target is done EE.JPGEE-CuO.jpg
Entry  Tuesday, August 09, 2011, 14:31, John Wong, UCx#2, LP-SIS, ITW, TM1, 38634-8, 38633-5, Spent, UCx#2 run is finished. broke_screwhead.jpgUCx#2.jpg
Entry  Tuesday, September 06, 2011, 13:19, John Wong, TaC#1, LP-SIS, ITE, TM1, 38634-6, , Spent, Target is done TaC_density_measurements.xls
   +  Reply  Tuesday, September 27, 2011, 10:36, Anders Mjos, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, Problems/Solutions, Material deposited on Extraction Electrode after Test Stand Deposited_material.pdf
ELOG V2.9.2-2455