Tuesday, October 25, 2022, 13:10, Darwin Ortiz Rosales, UCx#40, LP-SIS, , , 45550-2, , Ready, UCx#40 Target Description
|
Tuesday, October 25, 2022, 13:10
Target in Glovebox |
Friday, July 20, 2012, 11:39, John Wong, UCx#4, LP-SIS, ITW, TM1, 38634-9, 36833-4, Spent, UCx#4 target description
|
Friday, July 20, 2012, 11:35
UCx#4 target description, see attachment#1
The target is assembled and stored in the Ar-glove box. It will be transported to the South Hotcell on July 31, 2012.
|
Tuesday, August 09, 2022, 11:02, Darwin Ortiz Rosales, UCx#39, LP-IG-LIS, , , 42218-4, , Ready, UCx#39_Target_Description
|
|
Friday, July 15, 2022, 10:47, Darwin Ortiz Rosales, UCx#38, LP-SIS, , , 44508-3, , Ready, UCx#38_Target_Description
|
The bulk density was corrected. Use attachment number 2.
Darwin |
Monday, November 08, 2021, 11:30, Darwin Ortiz Rosales, UCx#36, LP-SIS, , , 44691-1, , Ready, UCx#36_Target_Description
|
|
Wednesday, September 29, 2021, 10:37, Darwin Ortiz Rosales, UCx#35, LP-IG-LIS, , , 42218-5, , Ready, UCx#35-Target_description
|
Target ID |
UCx#35 |
General |
Total No. Discs |
179 |
|
Disc area |
0.95 |
cm2 |
Ave graphite foil thickness/disc |
0.013 |
cm |
Ave. graphite foil mass/disc |
0.015 |
g |
|
Total mass of discs |
14.97 |
g |
Green Target |
Total Green mass of discs |
13.89 |
g |
Ave. mass/disc |
0.084 |
g |
Ave. mass/disc (no C-foil & org) |
0.078 |
g |
Ave. thickness/disc (no C-foil) |
0.037 |
cm |
Theoretical length (with C-foil) |
9.0 |
cm |
Total packed length (with C-foil) |
10.0 |
cm |
Final Target |
UC2 in Target |
11.05 |
g |
Free C in Target |
0.83 |
g |
Total massUC2+free C |
11.88 |
g |
U mass |
10.04 |
g |
U thickness |
10.56 |
g/cm2 |
UC2 bulk density (measured) |
2.88 |
g/cm3 |
Theoretical Density |
8.24 |
g/cm3 |
% Yield Density |
34.91 |
% |
Theoretical Porosity |
0.651 |
|
|
Wednesday, June 09, 2021, 11:45, Darwin Ortiz Rosales, UCx#33, LP-SIS, , , 44139-12, , Ready, UCx#33-Target_description
|
Cartridge with discs was further heated in EVAP1 (eLog 271 Evaporator 1). |
Thursday, November 12, 2020, 11:32, Darwin Ortiz Rosales, UCx#31, HP-SIS, ITE, TM4, 44160, 43822, Ready, UCx#31-Target_description
|
Target full name ITE-TM4-UC#31-P2N-SIS
|
Wednesday, November 16, 2011, 14:08, John Wong, UCx#3, LP-SIS, ITW, TM1, 38634-10, 36833-3, Spent, UCx#3 ready to go online
|
Wednesday, November 16, 2011, 13:51
UCx#3 descriptions:
Target oven wrapped with 3-Ta heat shields, including the back block (see attachment#1)
Total UCx/C discs = 365
Total disc length = 12.9cm
UC2/C (365 foils) = 44.76 g
UC2/C (365 foils) - organics = 39.24g
U (365 foils) = 34.05g
U (365 foils) thickness = 16.03 g
Salts added: Na, Li, K, Rb, & Ce. |
Monday, July 22, 2019, 16:33, Marla Cervantes, UCx#27, LP-SIS, , , 49044-9, , Ready, UCx#27 Target Description
|
Monday, July 22, 2019, 16:31
Attached please find the UCx#27 target description.
|
Thursday, November 29, 2018, 14:23, Marla Cervantes, UCx#26, LP-IG-LIS, , , 42281-3, , Ready, UCx#26 Target description
|
Thursday, November 29, 2018, 14:20
Attached please find the UCx#26 target description.
|
Friday, October 12, 2018, 17:14, John Wong, UCx#25, LP-SIS, , , , , In progress, UCx#25 Target Description
|
Friday, October 12, 2018, 17:11
See attachment for UCx#25 target description.
|
Monday, August 27, 2018, 17:11, John Wong, UCx#24, LP-SIS, , , , , Ready, UCx#24 Target Description
|
Monday, August 27, 2018, 17:09
See attachment for UCx#24 target description
|
Friday, July 13, 2018, 14:41, John Wong, UCx#23, LP-FEBIAD-CTL, , , , , Ready, UCx#23 target description
|
Friday, July 13, 2018, 14:40
Target is ready for installation.
See attachment for description
|
Monday, April 16, 2018, 09:55, Laura Lambert, UCx#22, LP-SIS, , , 42218-13, , Ready, UCx#22 Target Description
|
Monday, April 16, 2018, 09:53
Attached please find the UCx#22 target description.
|
Monday, August 21, 2017, 11:13, Laura Lambert, UCx#21, LP-SIS, , , 42218-15, , Ready, UCx#21 Target Description
|
Monday, August 21, 2017, 11:09
Attached please find the UCx#21 target description.
|
Tuesday, May 16, 2017, 13:18, Laura Lambert, UCx#20, LP-IG-LIS, ITE, TM4, 42218-1, , Ready, UCx#20 Target Description
|
Tuesday, May 16, 2017, 13:13
Attached please find the UCx#20 target description.
|
Tuesday, August 09, 2011, 14:31, John Wong, UCx#2, LP-SIS, ITW, TM1, 38634-8, 38633-5, Spent, UCx#2 run is finished.
|
UCx#2 Spec:
Target wrapped with 3 Ta-heat shields
Target length = 11.2cm
Total UC2/C foils = 245 discs
Total U/cm2 = 15.27g
Standard salts = 10uL Na, 10uL Li
Tuesday, August 09, 2011, 14:27:
Target came out from the glovebox and transported to the cold lab for assembly. During the assembly, one of the screw-heads for the heat-shield broke (see attachment#1: broken_screwhead).
The target was leak checked and fine.
Target is going back to the glovebox to be kept under Ar until RH is ready (see attachment #2: UCx#2).
Tuesday, October 04, 2011, 10:21
UCx#2 run was finished last week.
Target was moved from ITW to south hot cell, and stored in a bucket under argon feed.
|
Tuesday, March 07, 2017, 10:00, Laura Lambert, UCx#19, LP-SIS, , TM4, 42218-12, , Ready, UCx#19 Target Description
|
Tuesday, March 07, 2017, 09:54
Attached please find the UCx#19 target description.
|
Friday, October 21, 2016, 13:47, Laura Lambert, UCx#18, LP-SIS, , , 41790-6, , Ready, UCx#18 Target Description
|
Friday, October 21, 2016, 13:46
Attached please find the UCx#18 target description.
|
|