ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
123
|
Tuesday, October 25, 2022, 13:10 |
Darwin Ortiz Rosales | UCx#40 | LP-SIS | | | 45550-2 | | Ready | UCx#40 Target Description |
Tuesday, October 25, 2022, 13:10
Target in Glovebox |
Attachment 1: UCx#40_Description.png
|
|
25
|
Friday, July 20, 2012, 11:39 |
John Wong | UCx#4 | LP-SIS | ITW | TM1 | 38634-9 | 36833-4 | Spent | UCx#4 target description |
Friday, July 20, 2012, 11:35
UCx#4 target description, see attachment#1
The target is assembled and stored in the Ar-glove box. It will be transported to the South Hotcell on July 31, 2012.
|
Attachment 1: UCx#4_specfications.PNG
|
|
120
|
Tuesday, August 09, 2022, 11:02 |
Darwin Ortiz Rosales | UCx#39 | LP-IG-LIS | | | 42218-4 | | Ready | UCx#39_Target_Description |
|
Attachment 1: UCx#39_Description.png
|
|
119
|
Friday, July 15, 2022, 10:47 |
Darwin Ortiz Rosales | UCx#38 | LP-SIS | | | 44508-3 | | Ready | UCx#38_Target_Description |
The bulk density was corrected. Use attachment number 2.
Darwin |
Attachment 1: UCx#38.png
|
|
Attachment 2: UCx#38.png
|
|
113
|
Monday, November 08, 2021, 11:30 |
Darwin Ortiz Rosales | UCx#36 | LP-SIS | | | 44691-1 | | Ready | UCx#36_Target_Description |
|
Attachment 1: UCx#36_properties.png
|
|
112
|
Wednesday, September 29, 2021, 10:37 |
Darwin Ortiz Rosales | UCx#35 | LP-IG-LIS | | | 42218-5 | | Ready | UCx#35-Target_description |
Target ID |
UCx#35 |
General |
Total No. Discs |
179 |
|
Disc area |
0.95 |
cm2 |
Ave graphite foil thickness/disc |
0.013 |
cm |
Ave. graphite foil mass/disc |
0.015 |
g |
|
Total mass of discs |
14.97 |
g |
Green Target |
Total Green mass of discs |
13.89 |
g |
Ave. mass/disc |
0.084 |
g |
Ave. mass/disc (no C-foil & org) |
0.078 |
g |
Ave. thickness/disc (no C-foil) |
0.037 |
cm |
Theoretical length (with C-foil) |
9.0 |
cm |
Total packed length (with C-foil) |
10.0 |
cm |
Final Target |
UC2 in Target |
11.05 |
g |
Free C in Target |
0.83 |
g |
Total massUC2+free C |
11.88 |
g |
U mass |
10.04 |
g |
U thickness |
10.56 |
g/cm2 |
UC2 bulk density (measured) |
2.88 |
g/cm3 |
Theoretical Density |
8.24 |
g/cm3 |
% Yield Density |
34.91 |
% |
Theoretical Porosity |
0.651 |
|
|
Attachment 1: UCx#35_Target_Description_.png
|
|
107
|
Wednesday, June 09, 2021, 11:45 |
Darwin Ortiz Rosales | UCx#33 | LP-SIS | | | 44139-12 | | Ready | UCx#33-Target_description |
Cartridge with discs was further heated in EVAP1 (eLog 271 Evaporator 1). |
Attachment 1: UCx33-target_description.png
|
|
104
|
Thursday, November 12, 2020, 11:32 |
Darwin Ortiz Rosales | UCx#31 | HP-SIS | ITE | TM4 | 44160 | 43822 | Ready | UCx#31-Target_description |
Target full name ITE-TM4-UC#31-P2N-SIS
|
Attachment 1: UCx31-target_description.png
|
|
18
|
Wednesday, November 16, 2011, 14:08 |
John Wong | UCx#3 | LP-SIS | ITW | TM1 | 38634-10 | 36833-3 | Spent | UCx#3 ready to go online |
Wednesday, November 16, 2011, 13:51
UCx#3 descriptions:
Target oven wrapped with 3-Ta heat shields, including the back block (see attachment#1)
Total UCx/C discs = 365
Total disc length = 12.9cm
UC2/C (365 foils) = 44.76 g
UC2/C (365 foils) - organics = 39.24g
U (365 foils) = 34.05g
U (365 foils) thickness = 16.03 g
Salts added: Na, Li, K, Rb, & Ce. |
Attachment 1: UCx#3_assembly.jpg
|
|
90
|
Monday, July 22, 2019, 16:33 |
Marla Cervantes | UCx#27 | LP-SIS | | | 49044-9 | | Ready | UCx#27 Target Description |
Monday, July 22, 2019, 16:31
Attached please find the UCx#27 target description.
|
Attachment 1: UCx#27.JPG
|
|
88
|
Thursday, November 29, 2018, 14:23 |
Marla Cervantes | UCx#26 | LP-IG-LIS | | | 42281-3 | | Ready | UCx#26 Target description |
Thursday, November 29, 2018, 14:20
Attached please find the UCx#26 target description.
|
Attachment 1: UCx_26-description.JPG
|
|
86
|
Friday, October 12, 2018, 17:14 |
John Wong | UCx#25 | LP-SIS | | | | | In progress | UCx#25 Target Description |
Friday, October 12, 2018, 17:11
See attachment for UCx#25 target description.
|
Attachment 1: UCx#25_target_description.JPG
|
|
84
|
Monday, August 27, 2018, 17:11 |
John Wong | UCx#24 | LP-SIS | | | | | Ready | UCx#24 Target Description |
Monday, August 27, 2018, 17:09
See attachment for UCx#24 target description
|
Attachment 1: Capture.JPG
|
|
83
|
Friday, July 13, 2018, 14:41 |
John Wong | UCx#23 | LP-FEBIAD-CTL | | | | | Ready | UCx#23 target description |
Friday, July 13, 2018, 14:40
Target is ready for installation.
See attachment for description
|
Attachment 1: UCx_23-target_description.JPG
|
|
81
|
Monday, April 16, 2018, 09:55 |
Laura Lambert | UCx#22 | LP-SIS | | | 42218-13 | | Ready | UCx#22 Target Description |
Monday, April 16, 2018, 09:53
Attached please find the UCx#22 target description.
|
Attachment 1: target_description.JPG
|
|
78
|
Monday, August 21, 2017, 11:13 |
Laura Lambert | UCx#21 | LP-SIS | | | 42218-15 | | Ready | UCx#21 Target Description |
Monday, August 21, 2017, 11:09
Attached please find the UCx#21 target description.
|
Attachment 1: target_description.JPG
|
|
73
|
Tuesday, May 16, 2017, 13:18 |
Laura Lambert | UCx#20 | LP-IG-LIS | ITE | TM4 | 42218-1 | | Ready | UCx#20 Target Description |
Tuesday, May 16, 2017, 13:13
Attached please find the UCx#20 target description.
|
Attachment 1: target_description.JPG
|
|
13
|
Tuesday, August 09, 2011, 14:31 |
John Wong | UCx#2 | LP-SIS | ITW | TM1 | 38634-8 | 38633-5 | Spent | UCx#2 run is finished. |
UCx#2 Spec:
Target wrapped with 3 Ta-heat shields
Target length = 11.2cm
Total UC2/C foils = 245 discs
Total U/cm2 = 15.27g
Standard salts = 10uL Na, 10uL Li
Tuesday, August 09, 2011, 14:27:
Target came out from the glovebox and transported to the cold lab for assembly. During the assembly, one of the screw-heads for the heat-shield broke (see attachment#1: broken_screwhead).
The target was leak checked and fine.
Target is going back to the glovebox to be kept under Ar until RH is ready (see attachment #2: UCx#2).
Tuesday, October 04, 2011, 10:21
UCx#2 run was finished last week.
Target was moved from ITW to south hot cell, and stored in a bucket under argon feed.
|
Attachment 1: broke_screwhead.jpg
|
|
Attachment 2: UCx#2.jpg
|
|
71
|
Tuesday, March 07, 2017, 10:00 |
Laura Lambert | UCx#19 | LP-SIS | | TM4 | 42218-12 | | Ready | UCx#19 Target Description |
Tuesday, March 07, 2017, 09:54
Attached please find the UCx#19 target description.
|
Attachment 1: UCx#19_description.jpg
|
|
70
|
Friday, October 21, 2016, 13:47 |
Laura Lambert | UCx#18 | LP-SIS | | | 41790-6 | | Ready | UCx#18 Target Description |
Friday, October 21, 2016, 13:46
Attached please find the UCx#18 target description.
|
Attachment 1: UCx#18_description.jpg
|
|