Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 2 of 8  Not logged in ELOG logo
Entry  Tuesday, November 15, 2022, 08:41, Darwin Ortiz Rosales, UCx#41, LP-SIS, , , 45220-13, , Ready,  UCx#41_Description.png
 
Entry  Wednesday, July 26, 2023, 09:42, Darwin Ortiz Rosales, UCx#42, LP-SIS, , , 45220-1, , Ready, UCx#42_Description UCx#42_Description.png
 
Entry  Wednesday, May 25, 2022, 10:15, Darwin Ortiz Rosales, SiC#42, HP-FEBIAD, , , 44692-9, , Ready, Target SiC#42 Description Description-SiC#42.png
Wednesday, May 25, 2022, 10:15 
Entry  Monday, May 01, 2023, 14:59, Darwin Ortiz Rosales, TiC #5, LP-FEBIAD, , , 44692-5, , Ready, Target TiC #5 Description TiC#5.png
 
Entry  Friday, May 26, 2023, 11:53, Darwin Ortiz Rosales, SiC#45, HP-SIS, , , 44692-3, , Ready,  SiC#45.png
 
Entry  Friday, June 14, 2024, 14:12, Darwin Ortiz Rosales, SiC#46, HP-SIS, , , 44692-2, 45235-6, Ready, SiC#46_description SiC#46.png
 
Entry  Friday, May 26, 2023, 11:35, Darwin Ortiz Rosales, TiC#6, HP-SIS, , , 44692-10, , Ready, Target TiC #6 Description TiC_#6.png
 
Entry  Tuesday, September 21, 2021, 21:08, Darwin Ortiz Rosales, C#3, LP-SIS, , , 44691-7, , Ready, Target C #3 Description C#3_Target_description.png
 Tuesday, September 21, 2021, 21:09
See attached file for target description.
Entry  Monday, August 16, 2021, 11:02, John Wong, UCx#34, LP-SIS, ITW, TM2, 44691-5, 44378-1, Ready, Target description  UCx#34_target_description.PNGUCx_34_SEM_Density_Measurements.pdf
Monday, August 16, 2021, 11:01
See attachments for the target description and SEM images

 
Entry  Wednesday, June 23, 2021, 18:13, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44691-4, , In progress, Ta#62 Target Description (2) 
 Ta#62 LP-SIS target description: (REPLACEMENT FOR 44139-10)
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Thursday, September 22, 2022, 13:18, Darwin Ortiz Rosales, C#4, LP-SIS, , , 44691-3, , Ready, Target C#4 Description C#4_Target_Description.png
Thursday, September 22, 2022, 13:17
Entry  Wednesday, December 14, 2022, 10:28, Darwin Ortiz Rosales, C#5, , , , 44691-13, , Ready, Target C#5 Description C#5_Description.png
Graphite target
Entry  Thursday, June 02, 2022, 16:55, Aaron Schmidt, Ta#64, LP-SIS, ITE, TM4, 44691-12, , In progress, Ta#64 Target Description Ta#64_Target_Loading_Data.pdf
Thursday, June 02, 2022, 16:54: 
Ta#64 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Wednesday, November 10, 2021, 18:09, Aaron Schmidt, Ta#63, LP-SIS, ITE, TM4, 44691-11, , In progress, Ta#63 Ta#63_Target_Loading_Data.pdf
  Ta#63 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Monday, November 08, 2021, 11:30, Darwin Ortiz Rosales, UCx#36, LP-SIS, , , 44691-1, , Ready, UCx#36_Target_Description  UCx#36_properties.png
 
Entry  Friday, July 15, 2022, 10:47, Darwin Ortiz Rosales, UCx#38, LP-SIS, , , 44508-3, , Ready, UCx#38_Target_Description  UCx#38.pngUCx#38.png
The bulk density was corrected.  Use attachment number 2.
 
Darwin
Entry  Tuesday, October 27, 2020, 12:53, Aaron Schmidt, Nb#9, LP-SIS, ITE, TM4, 44508-2, , Ready, Nb#9 LP-SIS target description Nb#9_Target_Loading_data.pdf
 Nb#9 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Tuesday, October 06, 2020, 14:25, Aaron Schmidt, Ta#61, LP-SIS, ITE, TM4, 44508-1, , In progress, Ta#61 Target Description 
 Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Thursday, November 12, 2020, 11:32, Darwin Ortiz Rosales, UCx#31, HP-SIS, ITE, TM4, 44160, 43822, Ready, UCx#31-Target_description UCx31-target_description.png
 Target full name ITE-TM4-UC#
Entry  Tuesday, September 29, 2020, 11:50, Marla Cervantes, C#2, LP-SIS, ITW, TM2, 44139-9, , In progress, Target C#2 Description  C2-Description.JPG
 Tuesday, September 29, 2020, 11:49
See attached picture for description 
ELOG V2.9.2-2455