Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production  Not logged in ELOG logo
Entry  Friday, September 23, 2011, 17:03, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Spent, Run finished 
    Reply  Monday, October 17, 2011, 14:45, John Wong, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Spent, Run finished EE_after_teststand.jpgSiC#26_specification.png
Message ID: 17     Entry time: Monday, October 17, 2011, 14:45     In reply to: 15
Author: John Wong 
Target/No.#: SiC#26 
Source: HP-FEBIAD 
Station: ITE 
Module: TM4 
Target Oven W.O#: 38295-9 
Heat Shield W.O#: 38307-8 
Status: Spent 
Subject: Run finished 

Anders Mjos wrote:

Friday, September 23, 2011, 16:54:

  • Cu-gaskets used for leak checking target had a leak rate of about  10-8  10-9 atm cc/sec. Replaced with silver plated SS gaskets and no leak detected above 10-11 atm cc/sec.
  • The target can not hold high voltage when it is sitting on the jig. The insulator on the jig have reduced resistance over time (less than 1 G Ohm). All high voltage tests passed when target is tested not sitting on the jig.

 

  • Target is now in the test stand and pumping down.

 Monday, October 17, 2011, 14:41

After the test-stand, the extraction electrode showed some electric arcing mark, but no solid deposits were found.  (see attachment#1: EE_after_teststand.jpg)

See attachment for the target specification.  

Attachment 1: EE_after_teststand.jpg  315 kB  | Show | Show all
Attachment 2: SiC#26_specification.png  44 kB  Uploaded Wednesday, September 30, 2015, 17:42  | Show | Show all
ELOG V2.9.2-2455