  141   Wednesday, February 18, 2015, 14:49 Isaac EarleRepairTarget 1TargetT1-MK1 Repair CompleteThis is a continuation of work detailed
in E-Log #129 and #140.
- Static water test performed on
 IMG_4638.JPGIMG_4646.JPGIMG_4647.JPG 
  75   Tuesday, March 26, 2013, 10:55 Isaac EarleMaintenanceTarget 1TargetT1-MK1 Re-wiring and MRO Complete The following work was performed
on the T1-MK1 target:
- Unused proximity sensor removed
 T1-MK1_Tgt_leak_check.PDF 
  25   Monday, April 02, 2012, 15:18 Isaac EarleRepairTarget 1TargetT1-MK1 Installed in Beam Line The T1-MK1 target was transferred
from the storage pit to the beam line.  Services
were hooked up and the cooling package was
  
  342   Thursday, February 01, 2024, 11:14 Albert KongStandard OperationTarget 1Hot CellT1-MK1 Flush and Purge on Hot CellThe recently removed T1-MK1 target ladder
was flushed with city water for ~30s at all
target positions. It was then purged with
 IMG_3950.JPEGIMG_3975.JPEGIMG_3973.JPEGIMG_3971.JPEGT1&T2_Pump-Down_and_Leak_Check_Record_05_FEB_2024.pdf 
  356   Wednesday, October 30, 2024, 15:10 Albert KongStandard OperationTarget 1TargetT1-MK1 Electrical Check on Hot CellT1-MK1 electrical checks were completed
on the hot cell. Specifically the profile
and protect monitors were checked (assistance
 7x 
  329   Thursday, May 11, 2023, 11:28 Adam NewsomeRepairTarget 1TargetT1-MK1 - broken target ladder motor coupler repairedSee Cyclotron Fault 15787. The target ladder
motor failed to move to the commanded position
during a test. The T1 area was uncovered
  
  81   Friday, April 19, 2013, 09:55 Isaac EarleDevelopmentTarget 1CoolingT1&T2 cooling package safety/standards compliance upgrade complete (SASP0120)Yesterday (April 18th) the T1 and T2 cooling
package PRV outlet lines were routed to the
active drain in the 1A tunnel.  All
  
  337   Wednesday, January 10, 2024, 12:47 Albert KongStandard OperationTarget 1TargetT1 target ladder exchange (T1-MK1 to hot cell roof, T1-MK2 from pit to station)T1-MK1 was moved from the target station
to the hot cell roof. 
Radiation surveys report 140 mSv/hr
 T1_and_T2_Beryllium_Target_Beamtime_Spreadsheet_-_(10Jan2024).xlsxMeson_Hall_Storage_Pit_Target_Device_Location_Record_-_(10Jan2024).pptmVacuumAt2.56PM.PNG 
  305   Tuesday, October 11, 2022, 11:27 Adam NewsomeMaintenanceTarget 1CoolingT1 inlet pressure transducer replacementA fault was reported June 21, 2022 (Fault
15033) regarding T1 inlet pressure warnings...
 T1_inlet_pressure.png 
  283   Monday, March 14, 2022, 14:08 Adam NewsomeMaintenanceTarget 1CoolingT1 cooling system: filled, tuned, leak-checkedThe T1 cooling system was refilled with
water via the expansion tank until the tank
level read approximately 38 cm.
  
  244   Thursday, September 06, 2018, 13:49 Isaac EarleRepairTarget 1CoolingT1 cooling package secondary side solenoid failed On Friday Aug 31 at approximately
3am T1CS:FGSEC dropped to 0gpm flow. 
This was confirmed to be a real reading when
  
  242   Thursday, August 23, 2018, 11:52 Isaac EarleRepairTarget 1CoolingT1 cooling package pump failure and replacementOn Wednesday August 15th the T1 cooling
package tripped off, and could not be restarted. 
On the EPICS screen the pump device went
 TUS1801057_Triumf.pdf 
  240   Tuesday, July 03, 2018, 11:09 Isaac EarleRepairTarget 1CoolingT1 cooling package outlet water pressure sensor replaced The T1 cooling package outlet water
pressure sensor (B1A:T1CS:PGOUT) was replaced
this morning with a new unit.  Over
  
  245   Thursday, October 25, 2018, 08:58 Keith C NgRepairOtherOtherT1 collimator valve solenoid coil replaced againOn
23rd October we restarted the T1 and T2 water
packages after the mini shutdown and after
  
  230   Thursday, October 26, 2017, 16:12 Isaac EarleRepairTarget 1CoolingT1 collimator solenoid valve replaced Around 10pm on Sunday Oct 22 beam
was tripped multiple times due to low flow
for the T1 collimator cooling circuit (B1A:T1:FGCOL). 
  
  241   Monday, July 23, 2018, 09:39 Isaac EarleRepairTarget 1CoolingT1 collimator solenoid valve failed - Solenoid replacedOn Saturday July 21st the T1 Collimator
solenoid valve would not re-open after tripping
closed due to a (planned) loss of vacuum. 
  
  239   Friday, June 01, 2018, 17:50 Isaac EarleRepairTarget 1CoolingT1 collimator solenoid valve coil replacedFlow stopped through the T1 collimator
cooling loop around the same time as a power
bump this afternoon.  The problem was
  
  252   Monday, June 24, 2019, 14:29 Isaac EarleDevelopmentTarget 1TargetT1 and T2 target alignment frames overhauledThe following work was completed on both
the T1 and T2 target alignment frames

    One of the short taper
 8x 
  247   Thursday, January 10, 2019, 13:51 Isaac EarleMaintenanceTarget 1CoolingT1 and T2 cooling packages inspectedThe T1 and T2 cooling packages were inspected
today while running.  No water leaks
were observed at either package including
  
  236   Tuesday, April 10, 2018, 11:20 Isaac EarleMaintenanceOtherCoolingT1 and T2 cooling package shutdown MRO work The following work was performed
on the T1 and T2 cooling packages during
the 2018 shutdown:
  