  350   Wednesday, July 17, 2024, 15:05 Adam NewsomeStandard OperationOtherOtherSafety Walkaround Complete - Meson Hall HC/WC Area

A safety walkaround for July 2024 was completed by A. Kong.

Results can be found in the master spreadsheet

 

Major deficiencies:

  • Identified a 1/2 ton chain hoist missing an inspection tag. Mechanical Services will need to be informed about this.

 

  352   Thursday, August 22, 2024, 15:16 Adam NewsomeStandard OperationOtherActive SumpActive sump filled ~600L with grey water from RCR1 sump replacement

During a replacement of the RCR1 active sump (mechanical services group), approximately 600L of non-active grey water was released into the RH active sump. At this time, this should be all of the water in the RH sump (approximately 600L total).

  355   Thursday, October 10, 2024, 12:24 Adam NewsomeOtherOtherHot CellSafety Walkaround Complete - Meson Hall HC/WC Area

A safety walkaround was completed for the Meson Hall Hot/Warm Cells.

The resulting spreadsheet can be found on DocuShare as Document-242733.

Main deficiencies identified:

  • Hot Cells:
    • Pressure gauge reading is suspect
    • Operator station phone not working (resolved now)
  • General:
    • Lifting equipment has overdue inspection

Action has been taken on all deficiencies.

 

  357   Friday, November 29, 2024, 11:57 Adam NewsomeMaintenanceOtherHot CellHot cell and warm cell maintenance tasks

The following maintenance tasks were completed on 2024-11-29 by A. Newsome, A. Kong, A. Tam, M. Dalla Valle:

  • Warm cell right window water level topup... the water level was a couple inches lower from the top. Using a tube connected to the nearby sink, the level was topped up fully. See attached before/after picture.
  • Hot cell oil level checks:
    • Right side OK. See attached picture.
    • Left side very low compared to July 2022 measurement (suspect internal leak?). The oil was topped up. See attached before/after picture.
  • Hot cell scissor table pump oil level check - M. Dalla Valle notes this was topped up approximately July 2022. The table was operated and functioned normally, did not sound concerning. The oil level was visible and acceptable.

 

Still to do, next maintenance check-up:

  • Check HC atmospheric pressure differential gauge
  • Lubricate HC turntable (planned for 2025 winter shutdown when target assembly not present)
  • Lubricate all telemanipulators

 

 

Attachment 1: Operator_left_oil_level_before_refill.jpg
Operator_left_oil_level_before_refill.jpg
Attachment 2: Operator_Left_oil_level_after_refill.JPG
Operator_Left_oil_level_after_refill.JPG
Attachment 3: Operator_right_oil_level.jpg
Operator_right_oil_level.jpg
Attachment 4: Right_window_water_level_before_refill.jpg
Right_window_water_level_before_refill.jpg
Attachment 5: Warm_cell_water_window_after_refill.jpg
Warm_cell_water_window_after_refill.jpg
ELOG V2.9.2-2455