  346   Wednesday, April 03, 2024, 10:48 Adam NewsomeOtherOtherBL1A Holding TankBL1A Holding Tank - water level checkAs of 2024-04-03, the BL1A Holding Tank
water level is approximately 580L. It is
recommended to drain the tank prior to the
  
  350   Wednesday, July 17, 2024, 15:05 Adam NewsomeStandard OperationOtherOtherSafety Walkaround Complete - Meson Hall HC/WC AreaA safety walkaround for July 2024 was completed
by A. Kong.
Results can be found in the master
  
  352   Thursday, August 22, 2024, 15:16 Adam NewsomeStandard OperationOtherActive SumpActive sump filled ~600L with grey water from RCR1 sump replacementDuring a replacement  of the RCR1 active
sump (mechanical services group), approximately
600L of non-active grey water was released
  
  355   Thursday, October 10, 2024, 12:24 Adam NewsomeOtherOtherHot CellSafety Walkaround Complete - Meson Hall HC/WC AreaA safety walkaround was completed for the
Meson Hall Hot/Warm Cells. 
The resulting spreadsheet can be
  
  357   Friday, November 29, 2024, 11:57 Adam NewsomeMaintenanceOtherHot CellHot cell and warm cell maintenance tasksThe following maintenance tasks were completed
on 2024-11-29 by A. Newsome, A. Kong, A.
Tam, M. Dalla Valle:
 Operator_left_oil_level_before_refill.jpgOperator_Left_oil_level_after_refill.JPGOperator_right_oil_level.jpgRight_window_water_level_before_refill.jpgWarm_cell_water_window_after_refill.jpg 
  365   Wednesday, April 23, 2025, 15:58 Adam NewsomeOtherOtherHot Cell Safety Walkaround Complete - Meson Hall HC/WC Area A safety walkaround was completed for the
Meson Hall Hot/Warm Cells.
The resulting spreadsheet can be
  
  367   Tuesday, June 03, 2025, 11:39 Aaron TamStandard OperationOtherBL1A Holding TankBL1A Active Water Holding Tank June 3, 2025 - Albert Kong,
Aaron Tam 
RPG finished analysis of
 Sight_Glass_1.jpgSight_Glass_2.jpgTank_conditions_to_start.jpgTritium_Sample_and_Analysis_Form_-_T2_Cooling_Package_-_2025-01-10_-_Completed_2025-05-27.pdf 