  169   Thursday, August 13, 2015, 09:47 Isaac EarleDevelopmentOtherOther"Clamp A" disassembled and used to build clamp "TRH1257-#01"The 4" Marman flange clamp (IRH0001)
labeled "Clamp A",  as used
in the testing detailed in Document-114623
  
  284   Monday, March 14, 2022, 14:09 Adam NewsomeMaintenanceTarget 2Cooling T2 cooling system: filled, tuned, leak-checked The T2 cooling system was refilled with
water via the expansion tank until the tank
level read approximately 38 cm. 
  
  353   Monday, September 09, 2024, 09:39 Albert KongOtherTarget 2Cooling B1A:T2CS:FGSEC:RDFLOW noisy, CYCLOTRON Fault 17321Secondary flow sensor B1A:T2CS:FGSEC:RDFLOW
on the T2 cooling station suddenly became
very noisy at around 11 pm, 01 September
 EPICS_Data_Strip.png 