Tuesday, December 20, 2011, 09:54, Isaac Earle, Maintenance, Target 1, Target, Replaced T1-MK1 Target Ladder
|
Replaced T1-MK1 target ladder with the new ladder design which has an integrated upper slide plate (2 less sealing locations) and no c-seal grooves.
C-seals replaced with aliuminum delta seals.Transfered all target cassettes to new ladder in the same positions. Performed helium leak check
at interface with bellows flanges and all cassette locations. No leaks detected. |
Friday, November 04, 2011, 13:36, Isaac Earle, Maintenance, Target 2, Target, Kaon Target (Training)
|
Moved Kaon Target from storage pit to remote handling hot cell using flask as training exercise. Safety surveyor scanned storage pit
area (wide flanges: clean, pit floor: 50cpm). Returned flask to hot cell lab floor and covered storage pit. |
Thursday, June 30, 2011, 16:47, John Wong, Development, Target 1, Target, Testing Elog
|
blah blah blah.... fjda;jfeowifjoajglfa;nafg |
Wednesday, June 29, 2011, 15:27, John Wong, , , , test
|
blah blah blah.... |
|