Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Meson Hall  Not logged in ELOG logo
Message ID: 302     Entry time: Thursday, September 15, 2022, 14:34
Author: Adam Newsome 
Category: Standard Operation 
Type: Target 2 
Specific: Target 
Subject: T2-MK2 target elevations measurement 

The target elevations measurement and beam spot checks were completed on Sept. 15, 2022. This was done after a July 2022 target exchange for target positions 3 and 5.

 

Updated target elevation drawing can be found in DocuShare (Collection-33652)

Attachment 1: T2-MK2_-_Sept_2022.pdf  31 kB  | Show | Show all
ELOG V2.9.2-2455