  109   Tuesday, May 22, 2012, 10:00 David WangConditioning StationStandard OperationTM4sic 27helium pressure test on heat shield circuitI did a helium pressure test on heat shield
circuit. The leak detector is concected to
the TM4 primary vacuum system.The IG1 is
  
  111   Tuesday, May 22, 2012, 12:36 David WangITEStandard OperationTM4sic 27TM4 connection in ITEAll TM4 connections in ITE is done. The
station and TM4 is under roughing now.
  
  112   Tuesday, May 22, 2012, 15:19 David WangITEStandard OperationTM4sic 27TM4 in ITE under pumping

Normal
0





  
  2023   Tuesday, November 05, 2019, 12:46 chad fisherSouth Hot-CellStandard OperationTM2ta#59Ta#59 removedTa#59 has been removed from TM2 and it
is now ready for electrical check.
  
  1457   Wednesday, March 22, 2017, 14:05 Travis CaveSouth Hot-CellStandard OperationTM2test targetmodule movedTM#2 has been moved from the east target
station to the south hot cell.
  
  1458   Thursday, March 23, 2017, 09:30 Travis CaveSouth Hot-CellStandard OperationTM2test targetElectrical CheckElectrical check of the Ta test target
on TM#2
 TM2_Ta_Dummytgt_Preandpost.PDF 
  139   Wednesday, July 04, 2012, 13:18 David WangConditioning StationStandard OperationTM4uo#3leak check on heat shield circuit

    
        

           
  
  