Entry  Wednesday, May 15, 2024, 10:06, Travis Cave, Spent Target Vault, Standard Operation, , UC#38,40 Ta#62,63 SiC#44, Targets moved to the mini vault. Mini_Vault_Index_2024-05-15.pdfTarget_Index_2024-05-15.pdf

 Targets UC#38,40 Ta#62,63 SiC#44 have been moved from the spent target vault to the mini vault in preparation for F-308 loading. See attached PDFs for details.

Entry  Tuesday, May 14, 2024, 15:27, Carla Babcock, ITE, Development, TM3, UCx#44, TM3 conditioning and testing in ITE Screenshot_from_2024-05-14_10-47-22.png

Tuesday, May 14, 2024, 10:26 :

Ramping up bias/EE/EL on ITE - will see if the HV cage in the pit can hold 60kV or not.

At around 50kV the bias read current starts to get jumpy. Doesn't look like its an issue for the voltage, but definitely instability increases.

Screenshot_from_2024-05-14_10-47-22.png

Occasional sparks seem to increase the EL current significantly...

David heard some sparks in the target hall. Looks like from heat shield feed through to the top of the cage. Several sparks heard in the TH also changed the einzel lens draw current significantly. These feethroughs are not far from each other so could be related.

Apparently the sparking also tripped off all the optics and heaters in ITW, by changing the state of the water flow interlock. Interesting and not seen ever before. Will test again with the cage off, rather than risk tripping ITW again.

Tried ramping up the voltage on just the EE. Seems the limit is 7kV - at that level it gets sparky and unstable. Should be investigated (should hold 10kV) but not critical for module function.

 

Wednesday, May 15, 2024, 10:05 :

HV cover was removed this morning and the MAA was locked out.

Started ramping things up, was very easy until around 58kV. At 59.5kV a spark tripped off the EL. Canbus controller had to be power cycled to fix it. Bias current is much more stable in this configuration.

Ramped up again while listening from the TH to see if it was sparking outside. Went slowly to 60kV (left EL at 29kV) and didn't see any outside sparks in the first 10 mins, couple sparks in vacuum. But after 15 mins a spark seems to have fried the EL canbus card. We were not in the TH so not sure if it was on the outside or not.

After 2 hours a spark tripped off both ITE and ITW. Looks like it makes a water interlock go bad momentarily, but after the trip the interlocks seem fine.

 

Entry  Monday, May 13, 2024, 09:28, David Wang, ITE, Standard Operation, TM4, UCx#44, ITE water signal annual interlock check. 

ITE water signal annual interlock check is done. Ed helped me on this check. Everything works normal.

Entry  Friday, May 10, 2024, 09:04, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been connected in ITE.  Scanned_from_a_Xerox_Multifunction_Printer.pdf

Tm3 has been connected in ITE.  see attachment.

Entry  Thursday, May 09, 2024, 13:52, Riley Sykes, Waste Package/Ship, Standard Operation, , , F308 Service/Inspection 

 F308 Inspection and service complete on #06, #08, #13, #15, #16, #19, #20, #21, #22.

All in good condition with new gasket material installed on #20.

Prepped for move to ISAC B3 for storage.

Entry  Wednesday, May 08, 2024, 14:01, Frank Song, ITW, Maintenance, , , Annual clean up for ITW Faraday cage  

The ITW Faraday Cage has been cleaned, this is part of Winter Shut Down job happens in ISAC-1 Electric maintenance room annually.

Entry  Wednesday, May 08, 2024, 12:37, David Wang, ITE, Standard Operation, TM3, UCx#44, Tm3 has been moved form TCS to ITE 

The move is smooth and successful.

Entry  Wednesday, May 08, 2024, 12:36, David Wang, Conditioning Station, Standard Operation, TM3, UCx#44, TCS was argon vented this morning between 7:00 to 8:30 am. 

TCS was argon vented this morning between 7:00 to 8:30 am before module was moved to ITE.

Entry  Tuesday, May 07, 2024, 12:39, Eric Lahe, Spent Target Vault, Repair, , , ISAC Storage Vault Re-alignment Testing_and_updates_to_storage_vault_2024-05-01.pdf

 

ISAC Storage Vault Door Re-alignment (April-May 2024) 

Issue

  • Rollers gouging and marking on roller supports, testing shows door shifts at least 185 thou on structural beam when fully open vs. fully closed
  • door misaligned: 1/4" laterally, slight rotation (~1/16" difference across closed door gap).

 

Repair

  • Moved left structural beam (facing front of door) inward 1/4" at post.
  • Loosened drive system to shift door over via crane to average laterally (1/8" shift) towards center,
  • Attempted to fix door rotation with crane, door would not settle down perfectly flush, but got slight improvement 
  • Adjusted limit switches for fully open and closed (due to the adjustments made previously, needed to realign limit switches) - adjusted flag for final close back by ~1/4"; adjusted limit switch at back of vault forward ~1/4" 

 

Verification 

  • Unloaded vault door actuation tested multiple times with no issues, door returned to same position every cycle, no interferences during travel
  • Vault Door actuation tested with trays 4 and 6 engaged, no issues
  • All pails accessible when open
  • Tested open and closed limit switches: the open limit switches are working properly; the closing soft and hard limit switches are slightly close together, causing the door to just "bump" the vault when closing, The scale of this is OK for current operation, will be adjusted when the ISAC Target Hall Controls Overhaul is done
  • Tested and reset Emergency override mechanism - works properly

 

Outstanding Tasks

  • Will paint marks on structural supports to track if problem reoccurs - update ELog when complete 

 

System State: Operational

See attached file for details

 

 

Entry  Tuesday, May 07, 2024, 09:47, David Wang, ITE/ITW, Maintenance, TM2, , Broken TM2:TP2 has been replaced.  

Broken TM2:TP2 has been replaced otday by a new TV-1001 nav pump supplied by vacuum group. replaced pump seris number:201281. new pump series number:IT23431008. TPs replacement history sheet will be updated by Frank. I will put comment on this e fault and let operator to close it.

Entry  Friday, May 03, 2024, 12:20, Travis Cave, Spent Target Vault, Standard Operation, , Ta#66, Target repacked Target_Index_2024-05-03.pdf

 The Ta#66 target was repacked after the parasitic target was removed it was place in a new pail (#290) and place back in spot 5B of the vault. See attached PDF for further details.

Entry  Thursday, May 02, 2024, 18:48, Carla Babcock, ITW, Standard Operation, , , ITW cage setup 

ITW gas lines pumped down to 2e-3Torr on leak detector with leak rate in the low e-7 atm-cc/s. Gas bottles opened at 3psi and labels in epics changed to reflect correct setup. switch box set to cathode mode, checked that anode wire was at HV common.

note ballast is removed from ITW now to be used in ITE so that line is blanked off.

Entry  Thursday, May 02, 2024, 15:23, David Wang, South Hot-Cell, Development, TM3, , Leak check on TM3 new containment box window line VCR fittings.  

After new containment box installation on TM3, Chad and I did a helium spray leak check on two VCR fittings on front side water lines. they are leak free.

Helium pressurize window water line to 70 psi for 3minutes. No response on leak detector which is 0.0xe-9 atm.cc/sec.

Entry  Thursday, May 02, 2024, 14:58, David Wang, South Hot-Cell, Standard Operation, TM3, UCx#44, TM3 with UCx#44 electrical check and leak check. Scanned_from_a_Xerox_Multifunction_Printer_(11).pdf

TM3 with UCx#44 electrical check and leak check are good. see attachment.

HS line 70 psi helium pressure test at TCS: no leak at 0.0xe-9 torr.

Entry  Thursday, May 02, 2024, 14:54, David Wang, Conditioning Station, Standard Operation, TM3, UCx#44, TM3 has been moved from SHC to TCS. 

TM3 has been moved  from SHC to TCS by David and Frank. The move is smooth.

Entry  Thursday, May 02, 2024, 09:00, David Wang, ITW, Standard Operation, TM4, , Annual ITW water signal interlock check has been done.  

Annual ITW water signal interlock check has been done. Renee helped me on it. Everything works fine.

Entry  Wednesday, May 01, 2024, 14:51, David Wang, South Hot-Cell, Standard Operation, TM3, , Tm3 has been moved form TCS to SHC. 

Travis and I moved TM3 from TCS to SHC this afternoon. The move is smooth.

Entry  Wednesday, May 01, 2024, 09:50, David Wang, ITW, Standard Operation, TM4, , TM4 has been connected to ITW. Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf

TM4 has been connected to ITW. see attachment.

Entry  Tuesday, April 30, 2024, 09:20, David Wang, ITW, Development, TM4, , A new SST gas line is using for ITW febiad gas staion in pit. 

A new SST gas line with swagelock tube fittings and VCR fit is using for ITW febiad gas staion in pit. Gas line is leak checked on bench. No leak . it is installed on TM4 in ITW now,

Entry  Tuesday, April 30, 2024, 08:00, Frank Song, South Hot-Cell, Standard Operation, TM4, Lp-Febiad empty, electrical check/leak check TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf

 David Wang made E/L checking before module moving to ITW. read attachment pls.