ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
2570
|
Friday, April 26, 2024, 13:22 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | TM4 has been moved from SMP to SHC. | TM4 has been moved from SMP to SHC. Adam
and I did the move. the move is smooth. |
|
2572
|
Monday, April 29, 2024, 14:21 |
David Wang | ITE/ITW | Standard Operation | TM4 | | TM4 has been moved from SHC to ITW. | TM4 has been moved from SHC to ITW. Peter
did the move. Travis helped on him.
The move is successful. |
|
2573
|
Tuesday, April 30, 2024, 08:00 |
Frank Song | South Hot-Cell | Standard Operation | TM4 | Lp-Febiad empty | electrical check/leak check | David Wang made E/L checking before
module moving to ITW. read attachment pls. |
|
2574
|
Tuesday, April 30, 2024, 09:20 |
David Wang | ITW | Development | TM4 | | A new SST gas line is using for ITW febiad gas staion in pit. | A new SST gas line with swagelock tube
fittings and VCR fit is using for ITW febiad
gas staion in pit. Gas line is leak checked |
|
2575
|
Wednesday, May 01, 2024, 09:50 |
David Wang | ITW | Standard Operation | TM4 | | TM4 has been connected to ITW. | TM4 has been connected to ITW. see attachment. |
|
2577
|
Thursday, May 02, 2024, 09:00 |
David Wang | ITW | Standard Operation | TM4 | | Annual ITW water signal interlock check has been done. | Annual ITW water signal interlock check
has been done. Renee helped me on it. Everything
works fine. |
|
2590
|
Monday, May 13, 2024, 09:28 |
David Wang | ITE | Standard Operation | TM4 | UCx#44 | ITE water signal annual interlock check. | ITE water signal annual interlock check
is done. Ed helped me on this check. Everything
works normal. |
|