  5   Tuesday, July 19, 2011, 11:17 Travis CaveSouth Hot-CellStandard OperationTM4Ta#35Move of TM#4 from East target station to south hot cell.Move went well no problems readings at
East Target Station were very high at 500mSv/hr.
  
  6   Tuesday, July 19, 2011, 11:52 chad fisherSouth Hot-CellStandard OperationTM4Ta#36New target Ta#36 Installed on TM4Ta#36 has been installed on TM4 and is
awaiting leak and electrical check.
A small piece of the standard top
 DSC_0897.JPGDSC_0899.JPGDSC_0901.JPGDSC_0905.JPG 
  7   Tuesday, July 19, 2011, 12:02 Travis CaveSouth Hot-CellStandard OperationTM4Ta#36Electrical checkSee attached PDF for the details.  TM#4_SIS_Elec_Check2.pdf 
  8   Tuesday, July 19, 2011, 12:25 maicodallavalleSouth Hot-CellStandard OperationTM4Ta36TM4 Ta36 Target was put into the south hot cell.Ta36 was check by Maico and Chad.It was
then carried into the anteroom.From the anteroom
it was transferred into the south hot cell.
  
  9   Tuesday, July 19, 2011, 13:51 chad fisherSouth Hot-CellStandard OperationTM4Ta#36TM4 Ta#36 Leak Check ResultsTm4 w/ Ta#36 has been vacuum leak checked
using the standard leak check procedure.
At 1:45pm RH was contacted to notify
 DOC.PDF 
  10   Wednesday, July 20, 2011, 09:55 Travis CaveITEStandard OperationTM4Ta#36Move of TM#4 from South Hot Cell to East Target Station.Move completed, move went well.   
  13   Monday, July 25, 2011, 14:49 Travis CaveSpent Target VaultStandard Operation Ta#35Spent target moveTa#35, in pail #88, has been place into
spent target storage, in spot 6C. Upon removal
from the South Hot Cell it was 411mSv/hr
  
  14   Wednesday, July 27, 2011, 14:34 Travis CaveSouth Hot-CellStandard OperationTM1 Module moveTM#1 has been moved from the Conditioning
Station to the South Hot Cell for the installation
of Ta#37.
  
  15   Thursday, July 28, 2011, 12:02 Travis CaveSouth Hot-CellStandard OperationTM1Ta#37Electrical checkTM#1 has passed the the electrical check.  Electrical_Check_for_TM_1_with_Target_attached_Ta37.pdf 
  16   Thursday, July 28, 2011, 14:07 Travis CaveConditioning StationStandard OperationTM1Ta#37Module moveTm#1 with Ta#37 moved from the south hot
cell to the conditioning station. Move went
well.
  
  18   Wednesday, August 03, 2011, 11:24 Travis CaveITWStandard OperationTM1Ta#37Module moveTM#1 with Ta#37 has been moved from the
conditioning station to the the west target
station, move went well.
  
  19   Wednesday, August 17, 2011, 13:09 Bevan MossITWStandard OperationTM1Ta #37TM1 move from ITW to Hot Cell TM1 with Ta #37 target was moved
from ITW to the south hot cell. The rotation
of TM1 may have been off slightly during
  
  20   Thursday, August 18, 2011, 13:12 chad fisherSouth Hot-CellStandard OperationTM1UCx #2UCx #2 InstallationUCx #2 has been installed onto TM1.
Installation went well except the
left leg got bent slightly sometime between
  
  21   Thursday, August 18, 2011, 14:09 Bevan MossSouth Hot-CellStandard OperationTM1UCx#2Leak and Electrical Check plus Remote Move to Conditioning Station TM1 with UC#2 had the target installed,
the heat shield line was pumped on and achieved
a vacuum of 0.0 x 10^-4 Torr and a  leak
  
  22   Thursday, August 18, 2011, 16:07 Bevan MossConditioning StationStandard OperationTM1UCx#2Pump Down Pump down in the conditioning station
started at ~2:40 for rough down. The turbo
pumps were turned on at ~3:30 and at 3:52
  
  25   Wednesday, August 24, 2011, 17:11 Bevan MossConditioning StationStandard OperationTM1UCx#2Leak Check, HV conditioning and Module MoveToday a leak check on TM1's external seals
and the heat shield line was completed by
David Wang. After 16 hours of the turbo pumps
  
  26   Thursday, September 01, 2011, 09:11 Don JacksonITWStandard OperationTM1UCx#2Argon Venting West StationWest target station is setup to use argon
for tank venting.  There is 1200 PSI
remaining on argon bottle in electrical room. 
  
  27   Wednesday, September 14, 2011, 10:32 Travis CaveSpent Target VaultStandard Operation Ta#37Spent target moveTa#37 has been moved from the south hot
cell into the storage vault. The target is
in pail #89 and in spot 6A in the vault.
  
  28   Wednesday, September 28, 2011, 09:07 Travis CaveITEStandard OperationTM4Ta#36Move of TM#4 from East target station to south hot cell.Move of TM#4 with Ta#36 from East target
station to south hot cell, move went well.
  
  29   Wednesday, September 28, 2011, 10:06 chad fisherSouth Hot-CellStandard OperationTM4Ta#36Ta#36 RemovalTa#36 was removed from target module 4.
The standard, unexplained, un-investegated,
un-resolved "arc" were again present
  