  RH-ISAC, Page 1 of 136  Not logged in ELOG logo
ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  456   Thursday, September 19, 2013, 09:08 Travis CaveSouth Hot-CellStandard OperationTM3no targetwiring harnessThe wiring harness for TM#3 was made and
a continuity and megger test was done on
it and it passed, it has since been installed
  
  2533   Friday, January 26, 2024, 08:30 David WangSouth Hot-CellStandard OperationTM4 window line VCR leak check after containment box removal/installation. Chad and I did window line VCRs leak check
after containment box removal/installation. 
The first  pair of  VCRs have leak.
  
  459   Monday, September 23, 2013, 13:55 David WangSouth Hot-CellStandard OperationTM3 window circuit leak checkThis morning, Bevan and I leak checked
window circuit on TM3 at SHC after containment
box was installed. It took about 20minutes
  
  596   Tuesday, February 11, 2014, 13:56 chad fisherSouth Hot-CellRepairTM2 waterblock cleaningNew cleaning and polishing pads have been
inserted onto the hot cell as well as rubber
bungs and a new blank off.
 TM2_20140207_2.jpgTM2_20140211_2.jpg 
  1717   Friday, May 18, 2018, 09:34 David WangConditioning StationRepairTM4 water leak on TM4 Tube heater - B line confirmed.At 8:50 AM today, I applied water to TM4
tube heater - (B) line at TCS. All high vacuum
gauges got response on this action. Water
 TM4_2018-05-18_Water_Leak.docx 
  1438   Friday, February 10, 2017, 09:56 David WangConditioning StationStandard Operation  water has been refilled to TCS:TK2 TCS:TK2 , Water has been refilled to 28.5"
level. It was 15.1". Fall protection
equipment  are used during the job.
  
  1213   Monday, April 18, 2016, 09:07 David WangConditioning StationRepairTM2 venting TCS with argon.Anders reported a possible air leak on
TM2 and TCS by watching RGA  this morning.
I found the quick connector on F terminal
  
  1272   Wednesday, July 06, 2016, 07:06 David WangConditioning StationStandard Operation  venting TCS with argon.I switched off the vacuum pumps and vented
TCS with argon. The TCS will be ready to
accept TM2 this afternoon.
  
  1413   Saturday, December 03, 2016, 10:01 David WangITWRepairTM2 venting ITW and TM2 with argon.A short between TM2 EE and bias is produced
yesterday during tube heater ramp up. 
Alex asked for an argon venting on ITW to
  
  491   Saturday, October 05, 2013, 14:45 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2vacuum readingsIG1
8.0 e-7 T
  
  2421   Wednesday, March 01, 2023, 10:01 David WangITE/ITWDevelopment  vacuum pit ventilation upgrade. vacuum pit ventilation upgrade was done
last week. The jobs include: installed two
industrial cooling  fans.  One
  
  2689   Monday, September 23, 2024, 11:35 David WangITWStandard OperationTM4TiC #9.vacuum leak check on TM4 service cap in ITW. vacuum leak check on TM4 service cap in
ITW was done this morning.   leak
detector leak rate 0.0XE-9 atm.cc/sec. No
  
  717   Monday, July 28, 2014, 14:45 David WangConditioning StationDevelopmentTM2 turned off TM2 and CS turbo pumps.I turned off TM2 and CS turbo-pumps. TM2
will be moved from CS to silo tomorrow morning.
  
  495   Sunday, October 06, 2013, 20:28 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2turbo pumps stoppedvacuum readings before stopping
IG1: 7.4e-7 T
IG2 3.8 e-6 T
  
  494   Sunday, October 06, 2013, 17:08 Friedhelm AmesConditioning StationDevelopmentTM3NiO#2trip of all power suppliesAll power supplies tripped on high conductivity
of the cooling water < 5 MOhm, It is not
clear if this was caused by a spark or vice
  
  2369   Wednesday, September 28, 2022, 13:15 Matthew GareauNorth Hot-CellMaintenance  topped up the NHC window oil through the oil expansion tankMyself and Maico were able to top up the
NHC window oil.
The oil was filled through the expansion
 IMG_20220928_121000.jpgIMG_20220928_124253.jpgIMG_20220928_124258.jpg 
  1723   Thursday, May 24, 2018, 15:19 Keith C NgAssembly/Bench TestRepairTM2 tm 2 source tray buildAttached alignment check notes after brazing
and fabrication.
First page lower half shows establishment
 20180524_alignmentcheckresults.pdf 
  2563   Tuesday, April 16, 2024, 12:33 David WangConditioning StationStandard Operation  test TCS water system chillers stage in/out. Monday and Tuesday, I started TCS water
system and enabled the TCS chillers auto
stage in/out. I saw chiller 2 in/out three
  
  1006   Tuesday, July 21, 2015, 12:29 David WangITEMaintenance  target pit Hepa filterTarget pit Hepa filter has been replaced
today. There is 500 counts on swipe which
is taken inside of the replaced filter. The
  
  2530   Thursday, January 25, 2024, 07:24 David WangCraneStandard Operation  targe hall annual crane inspectionTom Kauss finished TH crane annual inspection
yesterday. The crane woks fine. Tom  has
this inspection record in his file. The crane
  