Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 130 of 130  Not logged in ELOG logo
ID Date Author Category Type Moduleup Target/Number Subject
  2537   Friday, February 02, 2024, 07:48 David WangITEStandard OperationTM4 ITE primary and secondary vacuum vessel leak check.

ITE primary and secondary vacuum vessel leak check has been done. SST bellow for 2A3M19  wire scanner on entrance module top has a big leak to E-5 atm.cc/sec on tiny helium spray. The bellow will be replaced in March by probe group. The LD base leak rate is affected by this big leak so i cant keep the LD scale at 0.0Xe-9 atm.cc/sec during the leak check. Other seal are leak free to 8XE-9 atm.cc/sec. I have no big concern on ITE vacuum seals status by the result.

  2570   Friday, April 26, 2024, 13:22 David WangSouth Hot-CellStandard OperationTM4 TM4 has been moved from SMP to SHC.

TM4 has been moved from SMP to SHC. Adam and I did the move. the move is smooth.

  2572   Monday, April 29, 2024, 14:21 David WangITE/ITWStandard OperationTM4 TM4 has been moved from SHC to ITW.

TM4 has been moved from SHC to ITW. Peter did the move. Travis helped on him.   The move is successful.

  2573   Tuesday, April 30, 2024, 08:00 Frank SongSouth Hot-CellStandard OperationTM4Lp-Febiad emptyelectrical check/leak check

 David Wang made E/L checking before module moving to ITW. read attachment pls.

Attachment 1: TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf TM4_with_Lp-Febiad_empty_target_checking_on_SHC_2024-04-29.pdf
  2574   Tuesday, April 30, 2024, 09:20 David WangITWDevelopmentTM4 A new SST gas line is using for ITW febiad gas staion in pit.

A new SST gas line with swagelock tube fittings and VCR fit is using for ITW febiad gas staion in pit. Gas line is leak checked on bench. No leak . it is installed on TM4 in ITW now,

  2575   Wednesday, May 01, 2024, 09:50 David WangITWStandard OperationTM4 TM4 has been connected to ITW.

TM4 has been connected to ITW. see attachment.

Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf
Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf
  2577   Thursday, May 02, 2024, 09:00 David WangITWStandard OperationTM4 Annual ITW water signal interlock check has been done.

Annual ITW water signal interlock check has been done. Renee helped me on it. Everything works fine.

  2590   Monday, May 13, 2024, 09:28 David WangITEStandard OperationTM4UCx#44ITE water signal annual interlock check.

ITE water signal annual interlock check is done. Ed helped me on this check. Everything works normal.

ELOG V2.9.2-2455