ID Date Author Category Type Module Target/Number Subjectdown
  456   Thursday, September 19, 2013, 09:08 Travis CaveSouth Hot-CellStandard OperationTM3no targetwiring harness

The wiring harness for TM#3 was made and a continuity and megger test was done on it and it passed, it has since been installed into the hot cell and placed on the module.

  2533   Friday, January 26, 2024, 08:30 David WangSouth Hot-CellStandard OperationTM4 window line VCR leak check after containment box removal/installation.

Chad and I did window line VCRs leak check after containment box removal/installation.  The first  pair of  VCRs have leak. Chad changed VCRs. Both VCr fittings on window lines are completely leak free to 0.0 XE-9 atm.cc/sec now.

  459   Monday, September 23, 2013, 13:55 David WangSouth Hot-CellStandard OperationTM3 window circuit leak check

This morning, Bevan and I leak checked window circuit on TM3 at SHC after containment box was installed. It took about 20minutes to pump down the circuit to  0.0xE-9atm.cc/sec. Bevan sprayed helium on both VCR joints and a final splash. No response had been found on leak detector.

  596   Tuesday, February 11, 2014, 13:56 chad fisherSouth Hot-CellRepairTM2 waterblock cleaning

New cleaning and polishing pads have been inserted onto the hot cell as well as rubber bungs and a new blank off.

The inital waterblock cleaning with the "scotch bright" pads has been completed. See attached pictures...the first picture being before and the second after.

Tommorow the water block will have bungs put in and a leak check to check the block will take place. After that, the new blank off will be installed and tested.

 

Attachment 1: TM2_20140207_2.jpg
TM2_20140207_2.jpg
Attachment 2: TM2_20140211_2.jpg
TM2_20140211_2.jpg
  1717   Friday, May 18, 2018, 09:34 David WangConditioning StationRepairTM4 water leak on TM4 Tube heater - B line confirmed.

At 8:50 AM today, I applied water to TM4 tube heater - (B) line at TCS. All high vacuum gauges got response on this action. Water is leaking through B line on TM4.

It should be D line . David 2018-06-05

Attachment 1: TM4_2018-05-18_Water_Leak.docx
  1438   Friday, February 10, 2017, 09:56 David WangConditioning StationStandard Operation  water has been refilled to TCS:TK2

TCS:TK2 , Water has been refilled to 28.5" level. It was 15.1". Fall protection equipment  are used during the job.

  1213   Monday, April 18, 2016, 09:07 David WangConditioning StationRepairTM2 venting TCS with argon.

Anders reported a possible air leak on TM2 and TCS by watching RGA  this morning. I found the quick connector on F terminal on the top of the module is leaking air. It is only used as "X" terminal for Febiad without  water. So, it should be blind capped instead of installing a quick connector. It was installed with a  blind cap before. I borrowed it for leak check on coil lines at SHC, but forgot to put it back right away. Instead, I put a quick connector on it later. This caused the problem. Anyway The TCS need to be vented , and a blind cap  will be installed on the F terminal.

2014-04-18, 9:24AM, I changed the quick connector with a blind cap on F terminal. the rough pump is started now.

  1272   Wednesday, July 06, 2016, 07:06 David WangConditioning StationStandard Operation  venting TCS with argon.

I switched off the vacuum pumps and vented TCS with argon. The TCS will be ready to accept TM2 this afternoon.

  1413   Saturday, December 03, 2016, 10:01 David WangITWRepairTM2 venting ITW and TM2 with argon.

A short between TM2 EE and bias is produced yesterday during tube heater ramp up.  Alex asked for an argon venting on ITW to see if the problem could be solved by venting and pumping down yesterday.  I set up argon venting system in electrical room and started the venting at 8:30 AM this morning.  It will take 5 hours to vent the ITW to 760 torr(mechanical gauge reading).  The venting system pressure is set as 2 torr. A pressure relieve valve is installed into ITW venting line to prevent station over venting. The argon bottle  valve in electrical room will be closed by isac opps after 5 hours venting.

  491   Saturday, October 05, 2013, 14:45 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2vacuum readings

IG1 8.0 e-7 T

IG1S 2.5 e-6 T

IG2 4.3 e-6 T

I will start the high voltage now

 

  2421   Wednesday, March 01, 2023, 10:01 David WangITE/ITWDevelopment  vacuum pit ventilation upgrade.

vacuum pit ventilation upgrade was done last week. The jobs include: installed two industrial cooling  fans.  One is placed in pit on resin tan cover. Other one is placed on and opening to pit by shielding blocks.  They are installed for better air circulation in pit. Also,  2x two small 20W cooling fans are installed on ITH MP1 and MP1S to low the pump  operation temperature.  The result is positive. The ventilation status in pit meets the pump operation requirement (good ventilation and 40 Celsuis below) .  ITH CG2S 0.0 mtorr.  ITH CG2 0.26mtorr.

  2689   Monday, September 23, 2024, 11:35 David WangITWStandard OperationTM4TiC #9.vacuum leak check on TM4 service cap in ITW.

vacuum leak check on TM4 service cap in ITW was done this morning.   leak detector leak rate 0.0XE-9 atm.cc/sec. No leak on TM4 service cap module top.

  717   Monday, July 28, 2014, 14:45 David WangConditioning StationDevelopmentTM2 turned off TM2 and CS turbo pumps.

I turned off TM2 and CS turbo-pumps. TM2 will be moved from CS to silo tomorrow morning.

  495   Sunday, October 06, 2013, 20:28 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2turbo pumps stopped

vacuum readings before stopping

IG1: 7.4e-7 T

IG2 3.8 e-6 T

IG1S 1.95 e-6 T

  494   Sunday, October 06, 2013, 17:08 Friedhelm AmesConditioning StationDevelopmentTM3NiO#2trip of all power supplies

All power supplies tripped on high conductivity of the cooling water < 5 MOhm, It is not clear if this was caused by a spark or vice versa. According to the strip tool for this signal the resistance of the water went up. There might be a fault in this signal. I do not have permission to force this signal so I keep the heaters off. We should revisit the interlock conditions, this signal should not be included in the interlocks for the heaters. Both target and tube seem to be still o.k. As I do not want to destroy the target I keep the heaters off and restart the high voltage only.

  2369   Wednesday, September 28, 2022, 13:15 Matthew GareauNorth Hot-CellMaintenance  topped up the NHC window oil through the oil expansion tank

Myself and Maico were able to top up the NHC window oil.

The oil was filled through the expansion tank

- the Nitrogen line closed and the Nitrogen pressure valve was disconnected to ensure that no oil would go in to them.

- the pressure relief valve was disconnected to act as an air bleed line while we filled the oil

- with a funnel we slowly added the oil until the oil level could be read, showing about half full

- about 1.5 liters of oil were added

- once filled the Nitrogen line was reattached and the pressure was returned to recommended level 

- the remaining oil was returned the RH shop

Now the oil level will be monitored, which will help identify if there is any leak in the system.

Attachment 1: IMG_20220928_121000.jpg
IMG_20220928_121000.jpg
Attachment 2: IMG_20220928_124253.jpg
IMG_20220928_124253.jpg
Attachment 3: IMG_20220928_124258.jpg
IMG_20220928_124258.jpg
  1723   Thursday, May 24, 2018, 15:19 Keith C NgAssembly/Bench TestRepairTM2 tm 2 source tray build

Attached alignment check notes after brazing and fabrication.

First page lower half shows establishment of baseline using master jig

Second page top half shows the alignment of the target mounting plate jig and the steerer cone aperture.

Second page bottom half shows alignment of the master target jig. Master target jig needed the 9 pin and heat shield locating features removed to seat the target correctly.

Overall, source tray assembly sits .006" high on average (min .003", max .010"), .003" to the left with respect to ion beam axis.

Attachment 1: 20180524_alignmentcheckresults.pdf
20180524_alignmentcheckresults.pdf
  2563   Tuesday, April 16, 2024, 12:33 David WangConditioning StationStandard Operation  test TCS water system chillers stage in/out.

Monday and Tuesday, I started TCS water system and enabled the TCS chillers auto stage in/out. I saw chiller 2 in/out three times at 17C and 21.8C without issue.   TCS water system works fine. The test is finished.

  1006   Tuesday, July 21, 2015, 12:29 David WangITEMaintenance  target pit Hepa filter

Target pit Hepa filter has been replaced today. There is 500 counts on swipe which is taken inside of the replaced filter. The field measurement on the filter wood box  is less than 0.5 usv/hr on contact. Right now,The outlets of the old filter are sealed with thick plastic and duct tape. The whole filter is wrapped with plastic sheet and tape. It has been moved to SHC ante room.  It will be moved out of there by Tony.N soon with RPG help.

  2530   Thursday, January 25, 2024, 07:24 David WangCraneStandard Operation  targe hall annual crane inspection

Tom Kauss finished TH crane annual inspection yesterday. The crane woks fine. Tom has this inspection record in his file. The crane inspection tag has been issued for 2024.