ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
1142
|
Monday, November 30, 2015, 11:46 |
David Wang | Conditioning Station | Standard Operation | | | Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 |
Weekly update TH schedule according to changes. see attachment 1,2 .
Update TH schedule before the weekend. see attachment 3,4 |
1147
|
Wednesday, December 02, 2015, 10:41 |
chad fisher | South Hot-Cell | Repair | | | Drum Clean-up #2 |
Another drum of waste was removed from the south hot cell this morning. This drum contained one 5 gal steel pail (damaged), two sodium light bulbs, airlines, and tank suits. Upon removal the drum was/is 1.5 mSv/h on contact. there was 200 counts of contamination found on the lid...easily removed. It will be moved to the north hot cell at 11am. |
1148
|
Thursday, December 10, 2015, 13:17 |
Anders Mjos | Conditioning Station | Standard Operation | | | Blank off flange |
Thursday, December 10, 2015, 13:17: Roughing
Thursday, December 10, 2015, 14:56: Started TP1S
Thursday, December 10, 2015, 15:59: Bypass applied on IG2
Thursday, December 10, 2015, 15:59: IG2 / IG1S 5.5E-5 T
Thursday, December 10, 2015, 16:01: RGA ON
Friday, December 11, 2015, 09:24 : IG2 / IG1S 7.5E-6 / 5.4E-6 T
Friday, December 11, 2015, 16:54: IG2 off for the weekend. Vacuum at 6.5 and 4.4E-6 Torr
Monday, December 14, 2015, 08:57: IG2 switched on.
Friday, December 18, 2015, 11:40: IG2 off for the weekend. Vacuum at 2.0E-6 and 8.9E-7 Torr
Tuesday, December 22, 2015, 15:11: RGA off
Monday, January 11, 2016, 10:13: RGA on
Monday, January 11, 2016, 12:50: RGA off |
1149
|
Friday, December 18, 2015, 11:42 |
Anders Mjos | Conditioning Station | Repair | | | Vacuum gauges not reading correctly |
It was found that the conversion from voltage to vacuum (Torr) in EPICS is not correct for the XGS-600 controllers in use at the TCS. EPICS did not correspond to local values displayed on the controller. An e-fault has been submitted. |
1150
|
Monday, December 21, 2015, 13:27 |
Anders Mjos | Conditioning Station | Repair | | | Vacuum gauges not reading correctly |
Anders Mjos wrote: |
It was found that the conversion from voltage to vacuum (Torr) in EPICS is not correct for the XGS-600 controllers in use at the TCS. EPICS did not correspond to local values displayed on the controller. An e-fault has been submitted.
|
EPICS conversion updated and corrected by Mike Rowe. |
1151
|
Friday, January 08, 2016, 09:29 |
chad fisher | South Hot-Cell | Repair | | | Window Decon |
Entered the hot cell to perform final decon on the window. Initial swipes this morning were 11000 c.p.m. on 44-2. After decon approximately 100 counts. |
1153
|
Friday, January 22, 2016, 14:24 |
David Wang | South Hot-Cell | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule (sketch) |
Post a sketch of 2016 winter shut down target hall schedule. see attachment 1,2
UPDATE THE SCHEDULE ACCORDING TO CYCLOTRON SIDE JOB. SEE ATTACHMENTS 3,4 |
1154
|
Friday, February 12, 2016, 13:00 |
David Wang | Conditioning Station | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule |
2016 Winter shut down target hall schedule. See attachments1,2.
update the schedule weekly. Everything is on time so far. see attachment 3,4.
Update the schedule according to beam new beam schedule and target process. see attachment 5,6 |
1155
|
Friday, February 19, 2016, 06:58 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308's serviced/loaded/ bolts torqued |
Five F-308's were loaded with spent ISAC targets. All five F-308's were serviced two weeks ago. All bolts were torqued and security cables were installed for shipment. |
1156
|
Thursday, February 25, 2016, 06:48 |
David Wang | ITE | Standard Operation | | | 4 Shielding blocks have been transferred from ITE to block storage area. |
Dan and I transferred 4 shielding blocks from ITE to block storage area. The ITE pit is opened now. |
1157
|
Thursday, February 25, 2016, 06:52 |
David Wang | Conditioning Station | Standard Operation | | | stop CS vacuum pumps. |
I stopped the conditioning station vacuum pumps. The CS is still under vacuum without venting. |
1158
|
Thursday, February 25, 2016, 09:27 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been disconnected in ITW |
TM2 has been disconnected in ITW (except vacuum lines). The vacuum system is still operating. |
1159
|
Thursday, February 25, 2016, 09:29 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been disconnected in ITE. |
TM4 has been disconnect in ITE(except vacuum lines). The ITE vacuum system is still operating. |
1160
|
Wednesday, March 02, 2016, 09:51 |
David Wang | ITW | Standard Operation | TM2 | | all water lines on TM2 and TM4 are purged. |
All water lines on TM2 and TM4 are purged for upcoming water lines helium pressure test. |
1161
|
Wednesday, March 02, 2016, 10:04 |
David Wang | ITW | Standard Operation | TM2 | | Leak check on ITW and TM2. |
Dan and I leak checked TM2 and ITW primary vacuum vessel. It was found a 1X E-7 atm.cc/sec leak on top T flange seal between TM2 and dump module in first time check. But it is not a repeatable leak. I checked the same spot and around area two more times with increased helium volume.It did not show up again. The first response could be a helium drift to dry scroll pump. I will check it again later. The primar vacuum vessel on ITW and TM2 are leak free.
Dan and I found a small leak on ITW dump module top flange seal. The leak detector got a response to 7xE-9 atm.cc/sec when I spray the helium to west side of dump module top flange. We tested again, and got same result. The o-ring which seals ITW dump module top flange is deteriorating. It need to be replaced at a proper time. This is the only air to vacuum leak we confirm so far on primary and secondary vacuum vessel on TM2 and ITW. The module and station no other air to vacuum leak.
The TM2 water lines helium pressure tested started in ITW. The helium pressure 70psi. The result so far is: Window: good, GE: huge leak directly shoot over E-7 atm.cc/sec( need to be confirmed tomorrow), HS: good, EE: good, MSP: tiny leak which is response to 3-4xE-9 atm.cc/sec. Coil 1 : small leak which is response to 1.3XE-8 atm.cc/sec. Tomorrow, We will test the rest water lines on TM2which are TA+, TA-, Tube+, Tube-, and coil 2. And We will confirm the GE huge leak at the last.
Finished the helium pressure test on TM2 water line.70 psi helium, The result of the rests 5 circuits: coil 1: leak 7.2xE-8atm.cc/sec,Ta(+): small leak 1.7XE-8 atm.cc/sec, Ta(-) small leak 8.7xE-9atm.cc/sec,Tube(-) 1.5 x E-8 atm.cc/sec. Tube(+)small leak 3.7xE-8 atm.cc/sec. We repeated the helium pressure test on GE. There is a huge leak on TM2 GE circuit. The leak detector shoot up to E-7 atm.cc/sec right after the helium was applied.It went up to E-6 range in less than 1 minutes.
|
1162
|
Friday, March 04, 2016, 12:34 |
David Wang | ITE | Standard Operation | TM4 | | TM4 ITE annual leak check |
Dan and I finished TM4 and ITE annual leak check on primary and secondary vacuum vessel. We found one leak on a KF25 blank off which is located on the top of the service cap. It is a low E-7 atm.cc/sec range leak. But, it is very close to turbo-pumps so ITE IG1 and other gauges are not affected by it very much. It is an easy fix. TheKF -25 center ring on the blank off will be replaced after vent . It be will leak checked again at CS after replacement. That is only leak we found on TM4 and ITE primary and secondary vessel air to vaccum leak check.
Dan and I also finished the helium pressure test on all TM4 using water circuits. 70 psi helium. base LR 0.0xE-9 atm.cc/sec. All of them are leak free. No any response has been found on leak detector during test. |
1163
|
Friday, March 04, 2016, 13:58 |
David Wang | Conditioning Station | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule |
Update Schedule according to changes.See attachment1, 2.
Re-post it after some minor correction See attachment 3,4.
Update schedule according changes. See attachments 5,6
update schedule according to changes. See attachment 7,8 |
1164
|
Monday, March 14, 2016, 11:24 |
David Wang | ITE/ITW Cooling | Maintenance | | | HALCW resin tank filter cartridges are changed today |
Two of resin tank filter cartridges(supply and return) are changed today. Old cartridges and bagged and tagged. The contact field on them are 650usv/hr. The new cartridges are fiber-glass, Triumf store item. After replacement, the field on contact with the filter case are about 10 usv/hr. But the field on contact with top resin tank has been increased from 45usv/hr to 225 usv/hr
The flow rate is relatively stable before and after change. See attachment |
1165
|
Monday, March 14, 2016, 15:22 |
David Wang | Conditioning Station | Standard Operation | TM2 | | 2016 Winter Shut Down Target Hall Schedule |
update schedule according to change. See attachment 1,2
|
1168
|
Thursday, March 17, 2016, 14:57 |
David Wang | South Hot-Cell | Repair | TM2 | | TM2 first round leak check in SHC |
Chad and I finished the first round check on Tm2 water lines. The lines and spots checked are: Target oven + and - (front side braze joints) , Tube heater+and -(front side braze joints and water blocks), coil2 and coil 1(front side braze joints and area close to water blocks),. No leak has been found on all above of them. The last, we checked the GE which has the biggest leak so far. The leak detector base leak rate only can get to 4XE-9 atm.cc/sec. Chad sprayed helium very close to GE water block, and I got a quick response on leak detector. The leak rate climbed from 4Xe-9 atm.cc/sec to 1.4 atm.cc/sec. We confirmed the GE is leaking now. The exact location need to be pinpointed later once the containment box is out after the module is back to SHC. The module will be moved to TCS tomorrow morning and pressurized again there. Anders will use RGA to monitor the helium response during the check. |