ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  2437   Wednesday, May 03, 2023, 13:22 David WangITEStandard Operation  Argon vented ITE station. Argon vented ITE station. ITEVV1S and ITGT
SV3 were closed after venting. 
  
  2440   Wednesday, May 10, 2023, 08:40 Frank SongITEStandard OperationTM4TiC#5Module Connection TM4 was connected in ITE.  pics
attached FYI.
 TM4_with_TiC5_connection_in_ITE_20230509.pngTM4_with_TiC5_all_set_in_ITE_20230510_758AM.JPG 
  2443   Monday, May 22, 2023, 15:06 Carla BabcockITEStandard OperationTM4TiC#5Module conditioningYesterday and today module conditioning
was done on Tm4 in ITE. This is the first
ramp up after the shutdown and ITE is planned
  
  2445   Wednesday, May 24, 2023, 17:25 Carla BabcockITERepairTM4TiC#5Issues with anode shortWhen I tried to raise the anode voltage
in cathode bias mode on May 23 evening, I
found the target or tube shorted to HV common.
  
  2448   Tuesday, May 30, 2023, 12:23 Frank SongITEStandard OperationTM4TiC#5gas lines pump out in ITE Faraday Cageargon is being supplied at 6 psi to TM4.   Argon_supplied_at_6psi_to_TM4_in_ITE.JPG 
  2455   Tuesday, June 13, 2023, 09:55 Frank SongITEStandard OperationTM4TiC#5module disconnection TM4 with TiC#5 was disconnected in
ITE and moved to NHC.
 TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf 
  2458   Wednesday, June 14, 2023, 07:10 Frank SongITEStandard OperationTM4SiC#45TM4 with SiC#45 connection in ITE TM4 with new target SiC#45 was connected
in ITE, all TPs are running at their full
speed.
 TM4_with_SiC#45_connected_in_ITE_20230613.pdf 
  2459   Wednesday, June 14, 2023, 13:37 David WangITEStandard OperationTM4 ITE water signal interlock checkITE water signal interlock check including
HS,EE, TA, TU, MSP. Coil1 , C-window ,2a-window,
2A tank, 2A shielding plug , 2A dump, 2A
  
  2465   Wednesday, July 19, 2023, 08:04 Frank SongITEStandard OperationTM4UCx#42Module Connection TM4 with new target UCx#42 was connected
in ITE. 
 TM4_with_UCx42_connection_in_ITE_20230718.pdf 
  2483   Tuesday, August 29, 2023, 09:33 Frank SongITEStandard OperationTM4UCx#42module disconnection TM4 with spent target UCx#42 was
disconnected in ITE and has been remote moved
to NHC this morning.
 TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf 
  2488   Wednesday, September 06, 2023, 08:07 Frank SongITEStandard OperationTM4Ta#65Module Connection TM4 was connected in ITE with new
target Ta#65 installed. see attachment in
detail.
 TM4_with_Ta#65_connection_in_ITE_2023-09-05.pdf 
  2499   Tuesday, November 07, 2023, 13:55 Frank SongITEStandard OperationTM4Ta#65module disconnectionTM4 with spent target Ta#65 was disconnected
in ITE and moved to SHC.
 TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf 
  2508   Wednesday, November 29, 2023, 12:45 Carla BabcockITEStandard Operation  gas lines pumped downPumped down the gas lines in ITE on Tuesday
Nov. 28 2023 and opened the CF4 bottle valves.
Missed the small section between the regulator
  
  2512   Thursday, December 21, 2023, 09:37 Ferran Boix PamiesITEDevelopment  Rewiring of TC multiping wiresThursday, December 21, 2023, 09:36.
ITE multipin wires 12-13-14-15 were rewired
from the RF driver box to a TC datalogger
  
  2519   Wednesday, January 10, 2024, 16:51 Carla BabcockITEStandard OperationTM4UCx#43UCx#43 failure To deliver stable beam to RadMol,
started heating UCx#43 up again. Target was
overheated during initial conditioning in
  
  2527   Monday, January 22, 2024, 10:16 David WangITEStandard OperationTM4UCx#Tm4 waterlines helium pressure test and TM service cap helium leak check.Tm4 waterlines helium pressure test and
TM service cap helium leak check was done
last Friday. All water lines were pressurized
  
  2528   Monday, January 22, 2024, 14:12 Frank SongITEStandard OperationTM4UCx#43module disconnection TM4 with spent target UCx#43 was
disconnected in ITE and is ready moved to
SHC. see attachment pls.
 TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf 
  2537   Friday, February 02, 2024, 07:48 David WangITEStandard OperationTM4 ITE primary and secondary vacuum vessel leak check. ITE primary and secondary vacuum vessel
leak check has been done. SST bellow for
2A3M19  wire scanner on entrance module
  
  2545   Thursday, February 15, 2024, 17:40 Carla BabcockITEStandard Operation  ITE annual HV testingITE was set up for HV tests - this time
the module plug was not in so the BIAS and
EE had to be bypassed. NOTE: ITE:BIASPLC
  
  2548   Friday, February 23, 2024, 06:36 David WangITEMaintenance  ITE entrance module has been disconnected.ITE entrance module has been disconnected
per document 190510. Its a preparation job
for next month module moving out to SHC.
  