710
|
Monday, July 21, 2014, 13:11 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | The TM1 HS line is pressure tested
this morning with 70 psi helium at
CS. No response has been found on leak detector. |
|
711
|
Tuesday, July 22, 2014, 07:32 |
David Wang | Conditioning Station | Standard Operation | TM1 | | Stop TM1 and CS turbo pumps and ruff pump. | Stop TM1 and CS turbo pumps and ruff pump.
TM1 is disconnect at CS. It will be vented
tomorrow morning and moved to ITW. |
|
712
|
Wednesday, July 23, 2014, 13:36 |
David Wang | ITW | Standard Operation | TM1 | | TM1 in ITW. | TM1 has been connected in ITW .
The new roughing pump replaced on last Friday
works good. I started all turbo pumps in |
|
735
|
Wednesday, September 03, 2014, 10:50 |
David Wang | ITW | Standard Operation | TM1 | | TM1 has been disconnected in ITW. | TM1 has been disconnected in ITW. |
|
736
|
Wednesday, September 03, 2014, 13:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move | TM#1 with Ta#43 has been moved from the
ITW to the south hot cell. |
|
737
|
Wednesday, September 03, 2014, 13:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check | TM#1 with ZrC#6 electrical check at the
south hot cell. The conductance of target
on circuit A-D is a little lower then normal. |
|
738
|
Thursday, September 04, 2014, 09:45 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | ZrC#6 | module move | TM#1 with ZrC#6 has been moved from the
south hot cell to the conditioning station. |
|
739
|
Thursday, September 04, 2014, 09:47 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed | Chad and I leak checked the TM1 HS
line with new target installed. Base leak
rate 0.0xe-9 atm.cc/sec. No any response |
|
740
|
Thursday, September 04, 2014, 11:19 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 is connected in CS. | TM1 is connected in CS. All turbo pumps
are started. |
|
741
|
Friday, September 05, 2014, 07:15 |
David Wang | Conditioning Station | Standard Operation | TM1 | | helium pressure test on TM1 HS water line at CS. | Helium pressure test on TM1 HS water line
at CS is done. 80psi helium with LD 0.0xE-9
atm.cc/sec. 3 minutes test and no response |
|
743
|
Monday, September 08, 2014, 13:44 |
David Wang | Conditioning Station | Standard Operation | TM1 | ZrC#6 | TM1 is disconnected at CS. | Stopped TM1 and CS turbo pumps. Disconnected
TM1 at CS. The CS and TM1 are under vacuum
and naturally leak up. I will vent it on |
|
744
|
Wednesday, September 10, 2014, 07:12 |
David Wang | ITW | Repair | TM1 | | Removed ITW HS and COIL flow rate monitors. | Removed ITW HS and COIL flow rate monitors
installed at the beginning of this year.
They were installed on these two circuits |
|
745
|
Wednesday, September 10, 2014, 08:52 |
Travis Cave | ITW | Standard Operation | TM1 | ZrC#6 | module move | TM#1 with ZrC#6 has been moved from the
conditioning station to west target station. |
|
746
|
Wednesday, September 10, 2014, 11:47 |
David Wang | ITW | Standard Operation | TM1 | | TM1 has been connected in ITW. | TM1 has been connected in ITW. ITW
and TM1 turbo pumps have been started. Water
is supplied to TM1 only. Everything is good |
|
749
|
Tuesday, September 16, 2014, 10:41 |
David Wang | ITW | Standard Operation | TM1 | ZrC #4 | 5 Shielding blocks have been transferred from ITE to ITW. | 5 Shielding blocks have been transferred
from ITE to ITW. The ITW is configured to
take proton beam |
|
760
|
Tuesday, October 14, 2014, 11:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | module move | TM#1 with ZrC#6 has been moved from ITW
to the south hot cell. |
|
761
|
Tuesday, October 14, 2014, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check | TM#1 with ZrC#6 post beam electrical check
see attached pdf for results. |
|
762
|
Tuesday, October 14, 2014, 12:19 |
David Wang | ITW | Standard Operation | TM1 | | TM1 was disconnected in ITW. | TM1 was disconnected in ITW this morning.
Heat shield circuit is purged. |
|
763
|
Tuesday, October 14, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Electrical check | Electrical check of TM#1 with no target
attached at the south hot cell see attached
PDF for details. |
|
765
|
Wednesday, October 15, 2014, 12:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 with no target has been moved from
the south hot cell to the south west silo. |
|