1624
|
Friday, September 22, 2017, 12:13 |
David Wang | South Hot-Cell | Maintenance | TM2 | | TM2 service cap inside inspection. | Two side panels on TM2 service cap were
removed for TM2 service cap inside inspection.
A piece of cable tie was found inside cap |
    |
1629
|
Thursday, September 28, 2017, 10:50 |
David Wang | Conditioning Station | Standard Operation | TM2 | | Helium pressure test on TM2 window and HS water lines at TCS. | I did helium pressure test on TM2
containment box window and HS line at TCS.
@ 70psi helium for 3 minutes, HS:2.2XE-7 |
|
1638
|
Tuesday, October 10, 2017, 10:38 |
David Wang | ITW | Standard Operation | | | 5 shielding blocks have been transferred from ITE to ITW . | ITW is configured to take proton beam. |
|
1639
|
Tuesday, October 10, 2017, 10:45 |
David Wang | Conditioning Station | Repair | | | Re-route TCS water lines. | TCS cooling polyurethane lines have
been re-routed to solve to HV sparking issue
on old configuration between lines and bais |
8x |
1647
|
Thursday, October 19, 2017, 10:11 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Leak check on TM4 HS line at SHC and TCS. | Chad and I leak checked TM4 HS line after
new target is installed yesterday. No leak
has been found. Also, I helium pressurized |
|
1656
|
Thursday, November 09, 2017, 09:34 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#55 | Leak check on TM2 HS line at SHC and TCS. | The TM2 HS line was leak checked at SHC
yesterday . 0.9xE-9 atm.cc/sec.Helium sprayed
by Chad, NO leak. It was helium pressurized |
|
1657
|
Thursday, November 09, 2017, 09:35 |
David Wang | Conditioning Station | Standard Operation | TM2 | Ta#55 | TM2 has been connected at TCS | TCS vacuum system and water system have
been started as well. Everything looks fine. |
|
1662
|
Tuesday, November 14, 2017, 14:34 |
David Wang | ITW | Standard Operation | TM2 | Ta#55 | TM2 has been connected in ITW. | TM2 has been connected in ITW. All turbo-pumps
are started. Everything works fine. |
|
1663
|
Wednesday, November 15, 2017, 08:55 |
David Wang | Conditioning Station | Standard Operation | | | Install shield plug onto TCS and pumping down TCS. | Shielding plug is installed onto TCS. TCS
is being pumped down to keep it under vacuum
for the rest of the year. |
|
1671
|
Tuesday, January 02, 2018, 10:46 |
David Wang | ITE/ITW Cooling | Standard Operation | | | Start High active water system. | High active water system was
checked before restart. A small water leak
on resin can supply valve was found. It is |
|
1672
|
Tuesday, January 02, 2018, 11:28 |
David Wang | ITE | Standard Operation | TM4 | | ITE annual water interlock check. | Eric and I finished ITE annual water interlock
check. Everything works properly. |
|
1676
|
Tuesday, January 16, 2018, 06:50 |
David Wang | ITE/ITW Cooling | Standard Operation | | | Field measurement on old resin tank in silo | The old resin tank has been stored in silo
since last year March. Without crane
the tank up, We use the pole monitor measured |
|
1678
|
Wednesday, January 17, 2018, 06:51 |
David Wang | Conditioning Station | Standard Operation | | | Stop TCS vacuum pumps | I stopped TCS vacuum pumps for coming TM3
move. |
|
1680
|
Wednesday, January 17, 2018, 13:54 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Start TM3 turbo pumps at TCS. | TM3 turbo-pumps are started at TCS. We
will keep pumps running until next Wednesday. |
|
1681
|
Monday, January 22, 2018, 07:47 |
David Wang | Conditioning Station | Standard Operation | TM3 | | Restarted TM3 vacuum sysytem after site power bump | All TCS and TM3 vacuum pumps are
started successfully. |
|
1682
|
Wednesday, January 24, 2018, 13:30 |
David Wang | Conditioning Station | Standard Operation | TM1 | | TM1 has been moved to TCS this morning | Tm1 has been moved to TCS this morning.
All turbo-pumps are started successfully
at TCS and TM1. |
|
1683
|
Monday, January 29, 2018, 06:51 |
David Wang | Conditioning Station | Maintenance | TM1 | | TCS and TM1 vacuum pumps switched off | TCS and Tm1 vacuum pumps are switched off
this morning. TM1 TP1and TP2 work fine during
this test period. Tm1 will be moved back |
|
1684
|
Wednesday, January 31, 2018, 10:32 |
David Wang | Crane | Standard Operation | | | Target Hall crane annual inspection. | Gordon crane technician Tom finished annual
TH crane inspection today. Everything is
normal. The main hoist brake gaps are checked |
|
1689
|
Wednesday, February 28, 2018, 14:47 |
David Wang | ITE | Standard Operation | | | leak check ITE primary and secondary vacuum vessel. | 2018-02-27: Anders and I finished leak
check on ITE primary and second vacuum vessel
seals. LD connected to ITE BV2 valves between. |
|
1691
|
Tuesday, March 06, 2018, 09:53 |
David Wang | ITW | Standard Operation | TM2 | | Tm2 and Tm4 vacuum disconnection | The job is done. See attachment. |
|