Entry  Tuesday, June 13, 2017, 13:41, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected in ITW. 
Yasmine and I connected TM2 in ITW today. the control page is set to febiad mode. Both gas line in ITW are opened for febiad run. All connections are
double checked. Module connection checklist is finished.  All turbo pumps are started now. Everything is good so far. The TM2 is ready for conditioning
when the ITW vacuum is good enough.
Entry  Monday, June 19, 2017, 07:29, David Wang, Conditioning Station, Standard Operation, TM2, , Update TH MS project schedule. Target_Hall_shedule_132_Apr_to_Sep.pdfTarget_Hall_shedule_132_Apr_to_Sep.mpp
Update TH MS project schedule. See attachment 1,2. 
Entry  Friday, June 23, 2017, 12:08, David Wang, Crane, Repair, , , TH crane inspection and probem fixing by Gordon crane  
Gordon crane technician Peter came in today and checked TH crane. Maico  and I were there with him. What he found is that brake gap on both side  of
main hoist decreased after months of using.  The solution is to lock  the automatic self adjustment system so the gap will be fixed there.  Each year
during annual inspection, they will adjust the gap manually.  After he locked both side of device, I tested the crane up and down  couple of times. The
Entry  Tuesday, June 27, 2017, 10:26, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#52, Leak check on TM4 HS line at SHC 
LD base LR:0.0Xe-9 atm.cc/sec. No leak has been found during the check.  The HS line will be helium pressurized at TCS this week.
Helium pressurized the HS line at TCS. 70 psi 2 minutes, 0.0 x E-9 atm.cc/sec. No leak.
Entry  Tuesday, June 27, 2017, 14:34, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 vacuum has been connected at TCS 
Turbo -pumps are started . The vacuum looks good so far.
Entry  Wednesday, June 28, 2017, 10:00, David Wang, Conditioning Station, Standard Operation, TM4, Ta#52, TM2 has been connected at TCS 
I started TCS water system.
Entry  Thursday, June 29, 2017, 11:55, David Wang, Conditioning Station, Repair, , , TCS HV cable and feed through installation 
John Chow and I installed new TCS HV cable and feed through with their mounting panel back to TCS Faraday cage this Tuesday. ECO-4269 has been issued
for the new cable feed through and mounting panel.
Entry  Monday, July 10, 2017, 10:19, David Wang, Conditioning Station, Standard Operation, TM4, , Turned off TCS water system 
Prepare for TM4 move tomorrow morning.
Entry  Wednesday, August 02, 2017, 15:09, David Wang, ITW, Standard Operation, TM2, , TM2 was disconnencted in ITW yesterday. 
Tm2 was disconnected in ITW yesterday. ITW EL cable crimp ring was broken. John Chow replaced this ring this afternoon.
Entry  Wednesday, August 02, 2017, 15:13, David Wang, South Hot-Cell, Standard Operation, TM2, , SHC, TM2 leak check on HS line. 
HS line is leak checked at SHC this afternoon by helium spay.  Leak detector base LR 0.0 XE-9atm.cc/sec. Base pressure 0.0Xe-4 torr. No leak has
been found. This line will be helium pressured  at TCS. It had  a 1.7XE-7 atm.cc/sec leak rate on 70 psi helium at TCS  during last two
target  checks.
Entry  Tuesday, August 29, 2017, 08:59, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 HS line leak checks 
TM4 HS line leak checks are done, at SHC and TCS. SHC: Helium spray. TCS: Helium  pressurize 70psi.  LD base LR 0.0 X E-9 atm.cc/sec. 
No leak has been found on both leak checks. 
Entry  Tuesday, August 29, 2017, 09:01, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 has been connnected at TCS. 
TM4 has been connected at TCS. TCS water system has been started for TM4. TM4 and TCS vacuum pumping down is good so far.
Entry  Tuesday, September 05, 2017, 06:33, David Wang, Conditioning Station, Standard Operation, TM4, , Turned off TCS water system and vacuum system. 
Argon vent and disconnect TM4 at TCS.
Entry  Friday, September 08, 2017, 14:08, David Wang, Conditioning Station, Repair, TM3, , TCS and TM3  
TM3 is located at TCS and it is pumping down now. TCS water system has been started.  All TCS water lines for TM3 module internal cooling are bypassed
and looped at TCS top ground plate. Water only supply to TCS high  current conductors.
Entry  Wednesday, September 13, 2017, 10:05, David Wang, Conditioning Station, Repair, TM3, , Switch off TCS water system and vacuums 
Preparing vent the TCS/TM3. We will remove TM3 service tray cover plate  after venting.
Entry  Wednesday, September 13, 2017, 16:05, David Wang, Conditioning Station, Repair, TM3, , remove Tm3 service tray cover plate 
TM3 service tray cover plate has been removed. It is bagged and placed to TH b2 level south wall beside the silo.
Entry  Wednesday, September 13, 2017, 16:13, David Wang, Conditioning Station, Repair, TM3, , TCS turbo pumps are started.  
TCS and TM3 all vacuum pumps are started. Everything is fine.
Entry  Friday, September 22, 2017, 12:13, David Wang, South Hot-Cell, Maintenance, TM2, , TM2 service cap inside inspection. TM2_serica_cap_inspection_002.JPGTM2_serica_cap_inspection_003.JPGTM2_serica_cap_inspection_004.JPGTM2_serica_cap_inspection_005.JPGTM2_serica_cap_inspection_008.JPG
Two side panels on TM2 service cap were removed for TM2 service cap inside inspection. A piece of cable tie was found inside cap closing to service tray
entrance area. All blue nylon insulators are inspected. They look good. The broken cable tie is moved out of service cap.
 Panels are installed back after the inspection.
Entry  Thursday, September 28, 2017, 10:50, David Wang, Conditioning Station, Standard Operation, TM2, , Helium pressure test on TM2 window and HS water lines at TCS. 
  I did helium pressure test on TM2 containment box window and HS  line at TCS. @ 70psi helium  for 3 minutes, HS:2.2XE-7 atm.cc/sec.,  Window:1.2XE-7
atm.cc/sec. There is no change on HS. But LR on window is bigger than before that was in E -9atm.cc/sec range.   
Entry  Tuesday, October 10, 2017, 10:38, David Wang, ITW, Standard Operation, , , 5 shielding blocks have been transferred from ITE to ITW . 
ITW is configured to take proton beam.