Tuesday, June 13, 2017, 13:41, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected in ITW.
|
Yasmine and I connected TM2 in ITW today. the control page is set to febiad mode. Both gas line in ITW are opened for febiad run. All connections are double checked. Module connection checklist is finished. All turbo pumps are started now. Everything is good so far. The TM2 is ready for conditioning when the ITW vacuum is good enough. |
Monday, June 19, 2017, 07:29, David Wang, Conditioning Station, Standard Operation, TM2, , Update TH MS project schedule. 
|
Update TH MS project schedule. See attachment 1,2. |
Friday, June 23, 2017, 12:08, David Wang, Crane, Repair, , , TH crane inspection and probem fixing by Gordon crane
|
Gordon crane technician Peter came in today and checked TH crane. Maico and I were there with him. What he found is that brake gap on both side of main hoist decreased after months of using. The solution is to lock the automatic self adjustment system so the gap will be fixed there. Each year during annual inspection, they will adjust the gap manually. After he locked both side of device, I tested the crane up and down couple of times. The brakes work fine. |
Tuesday, June 27, 2017, 10:26, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#52, Leak check on TM4 HS line at SHC
|
LD base LR:0.0Xe-9 atm.cc/sec. No leak has been found during the check. The HS line will be helium pressurized at TCS this week.
Helium pressurized the HS line at TCS. 70 psi 2 minutes, 0.0 x E-9 atm.cc/sec. No leak. |
Tuesday, June 27, 2017, 14:34, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 vacuum has been connected at TCS
|
Turbo -pumps are started . The vacuum looks good so far. |
Wednesday, June 28, 2017, 10:00, David Wang, Conditioning Station, Standard Operation, TM4, Ta#52, TM2 has been connected at TCS
|
I started TCS water system. |
Thursday, June 29, 2017, 11:55, David Wang, Conditioning Station, Repair, , , TCS HV cable and feed through installation
|
John Chow and I installed new TCS HV cable and feed through with their mounting panel back to TCS Faraday cage this Tuesday. ECO-4269 has been issued for the new cable feed through and mounting panel. |
Monday, July 10, 2017, 10:19, David Wang, Conditioning Station, Standard Operation, TM4, , Turned off TCS water system
|
Prepare for TM4 move tomorrow morning. |
Wednesday, August 02, 2017, 15:09, David Wang, ITW, Standard Operation, TM2, , TM2 was disconnencted in ITW yesterday.
|
Tm2 was disconnected in ITW yesterday. ITW EL cable crimp ring was broken. John Chow replaced this ring this afternoon. |
Wednesday, August 02, 2017, 15:13, David Wang, South Hot-Cell, Standard Operation, TM2, , SHC, TM2 leak check on HS line.
|
HS line is leak checked at SHC this afternoon by helium spay. Leak detector base LR 0.0 XE-9atm.cc/sec. Base pressure 0.0Xe-4 torr. No leak has been found. This line will be helium pressured at TCS. It had a 1.7XE-7 atm.cc/sec leak rate on 70 psi helium at TCS during last two target checks.
2017-08-03. Helium pressure test on TM2 HS line at TCS is done. 70psi helium, 3 minutes. base leak rate 0.0xE-7 atm.cc/sec. Result: 1.8XE-7atm.cc/sec leak which is almost same as before. This line has a very small leak on water block seal under helium pressure test which we knew already. |
Tuesday, August 29, 2017, 08:59, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 HS line leak checks
|
TM4 HS line leak checks are done, at SHC and TCS. SHC: Helium spray. TCS: Helium pressurize 70psi. LD base LR 0.0 X E-9 atm.cc/sec. No leak has been found on both leak checks. |
Tuesday, August 29, 2017, 09:01, David Wang, Conditioning Station, Standard Operation, TM4, , TM4 has been connnected at TCS.
|
TM4 has been connected at TCS. TCS water system has been started for TM4. TM4 and TCS vacuum pumping down is good so far. |
Tuesday, September 05, 2017, 06:33, David Wang, Conditioning Station, Standard Operation, TM4, , Turned off TCS water system and vacuum system.
|
Argon vent and disconnect TM4 at TCS. |
Friday, September 08, 2017, 14:08, David Wang, Conditioning Station, Repair, TM3, , TCS and TM3
|
TM3 is located at TCS and it is pumping down now. TCS water system has been started. All TCS water lines for TM3 module internal cooling are bypassed and looped at TCS top ground plate. Water only supply to TCS high current conductors. |
Wednesday, September 13, 2017, 10:05, David Wang, Conditioning Station, Repair, TM3, , Switch off TCS water system and vacuums
|
Preparing vent the TCS/TM3. We will remove TM3 service tray cover plate after venting. |
Wednesday, September 13, 2017, 16:05, David Wang, Conditioning Station, Repair, TM3, , remove Tm3 service tray cover plate
|
TM3 service tray cover plate has been removed. It is bagged and placed to TH b2 level south wall beside the silo. |
Wednesday, September 13, 2017, 16:13, David Wang, Conditioning Station, Repair, TM3, , TCS turbo pumps are started.
|
TCS and TM3 all vacuum pumps are started. Everything is fine. |
Friday, September 22, 2017, 12:13, David Wang, South Hot-Cell, Maintenance, TM2, , TM2 service cap inside inspection.    
|
Two side panels on TM2 service cap were removed for TM2 service cap inside inspection. A piece of cable tie was found inside cap closing to service tray entrance area. All blue nylon insulators are inspected. They look good. The broken cable tie is moved out of service cap.
Panels are installed back after the inspection.
See attachments |
Thursday, September 28, 2017, 10:50, David Wang, Conditioning Station, Standard Operation, TM2, , Helium pressure test on TM2 window and HS water lines at TCS.
|
I did helium pressure test on TM2 containment box window and HS line at TCS. @ 70psi helium for 3 minutes, HS:2.2XE-7 atm.cc/sec., Window:1.2XE-7 atm.cc/sec. There is no change on HS. But LR on window is bigger than before that was in E -9atm.cc/sec range. |
Tuesday, October 10, 2017, 10:38, David Wang, ITW, Standard Operation, , , 5 shielding blocks have been transferred from ITE to ITW .
|
ITW is configured to take proton beam. |
|