ID Date Author Category Type Module Target/Number Subjectdown
  120   Thursday, June 07, 2012, 11:58 Bevan MossConditioning StationStandard OperationTM1Ta38Module Move from SHC to TCS

TM1 was moved from SHC to the TCS. The mode took roughly 1 hour. During the move the north east corner of the containment box caught slightly on the flange of the vacuum vessel and then slipped off. The contact was minimal but should none the less be noted. After sliding off of the flange the module did not crash into the other sides of the vacuum vessel, this is why I believe the contact was minimal. It should be noted that the corner of concern is the one that is most difficult to see.

  255   Friday, March 08, 2013, 15:50 Bevan MossITEStandard OperationTM4CS Test Target #1Module Move from ITE to SHC

 Today David and I moved the module from ITE to the SHC. Move went very smoothly, David operated the cameras and has had basic training in how to manually lock out the controls.

  193   Tuesday, October 09, 2012, 11:17 Bevan MossITEStandard OperationTM4NiO#1Module Move

 TM4 with NiO#1 was moved from ITE to the SHC today. The move went well with no issues.

  195   Tuesday, October 09, 2012, 14:53 Bevan MossConditioning StationDevelopmentTM4UCx#5Module Move

TM4 was remote moved from the SCH to the TCS today. This was the first time the module was moved with the framework for the cage in place. The ion gauge on the service cap is closer to the cage than anticipated and as a result the pins for the gauge were sheared off. Discussion as to how to repair the gauge (both short term and long term needs to be had). We will try and rough down the TM tonight, it is not believed the vacuum will be affected.

  260   Wednesday, March 13, 2013, 14:31 Bevan MossConditioning StationStandard OperationTM4CS Test Target #1Module Move

 TM4 with CS Test Target #1 was moved from the SHC to the Conditioning Station. All went well. The welding cables came a little close to the cage, David will bend them in more in the future.

  2164   Tuesday, November 17, 2020, 10:17 Adam NewsomeSouth Hot-CellStandard OperationTM2 Module Move

TM2 has been moved from ITW to the South Hot Cell.


Reading at ITW: 114 mSv/hr

Reading at SHC: 85 mSv/hr

  2168   Tuesday, November 24, 2020, 09:37 Adam NewsomeITWStandard OperationTM2 Module Move

TM2 has been moved from the Conditioning Station to ITW. 

  2170   Wednesday, November 25, 2020, 09:05 Adam NewsomeSouth Hot-CellStandard OperationTM3 Module Move

TM3 has been moved from the Silo to the South Hot Cell.

  2263   Tuesday, November 09, 2021, 14:35 Adam NewsomeSouth Hot-CellStandard OperationTM2UCX#36Module Move

TM#2 was moved from ITW to SHC, then moved back to ITW.

  2246   Friday, September 17, 2021, 12:34 Frank SongITEStandard OperationTM4Sic#41Module Connection

 TM4 with a new target was moved back from NHC to ITE and reconnected at pit. The 5 shielding blocks were installed as well. Copies of connection checklist are attached here.

  2252   Monday, October 04, 2021, 09:27 Frank SongITWStandard OperationTM2C#3Module Connection

 TM2 been connected with new target C#3 in ITW. 

  2258   Friday, October 08, 2021, 12:39 Frank SongITEStandard OperationTM4UCx#35Module Connection

 the module with target UC#35 was connected in ITE and being pumped down.

  2265   Wednesday, November 10, 2021, 08:32 Frank SongITWStandard OperationTM2UC#36Module Connection

 TM2 with target UC#36 was connected at ITW.

  2316   Thursday, April 28, 2022, 07:24 Frank SongITWStandard OperationTM2Febiad Test TargetModule Connection

 TM2 was connected in ITW with a Febiad Test Target. 

  2328   Tuesday, June 07, 2022, 14:15 Frank SongITE/ITWStandard OperationTM2SiC#42Module Connection

 TM2 with Febiad target SiC#42 was connected in ITW.

  2334   Tuesday, June 21, 2022, 18:30 Frank SongITWStandard OperationTM2SiC#43 FebiadModule Connection

 TM2 with Febiad Target SiC #43 was connected in ITW. NOTE: the number of TARGET in attached picture should be #43. 

  2341   Tuesday, June 28, 2022, 14:13 Frank SongITEStandard OperationTM4Ta#64Module Connection

 TM4 with Ta#64 was connected in ITE. see attachment please.

  2350   Wednesday, July 27, 2022, 08:11 Frank SongITWStandard OperationTM2UCx#38Module Connection

 TM2 with Target UCx#38 was connected in ITW.

  2365   Tuesday, September 13, 2022, 14:10 Frank SongITWStandard OperationTM2UCx#39Module Connection

 TM2 with UCx#39 is connected in ITW.

  2376   Tuesday, October 11, 2022, 12:39 Frank SongITEStandard OperationTM4C#4Module Connection

 TM4 with Target C#4 was connected in ITE.