Entry  Tuesday, May 15, 2018, 07:44, Travis Cave, Conditioning Station, Standard Operation, TM4, no target, Module move 

 TM#4 was moved to the conditioning station from the south hot cell. The module was moved with out the containment box.

Entry  Wednesday, May 23, 2018, 09:48, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move 

 TM#4 with no target and no containment box has been moved from the conditioning station to the south hot cell.

Entry  Friday, May 25, 2018, 11:41, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 

TM#2 has been moved from the south hot cell to the conditioning station.

Entry  Thursday, June 07, 2018, 11:37, Travis Cave, ITE, Standard Operation, TM4, UC#22, Module move 

 TM#4 ,with UC#22, was moved from the south hot cell to the east target station. Upon lowering the module down it made contact with the IMC, At that point the module was removed and placed back in the south hot cell. The IMC was inspected and problem corrected and the module was moved back to the east target station without a problem.

    Reply  Friday, June 08, 2018, 10:22, Anders Mjos, ITE, Standard Operation, TM4, UC#22, Module move IMC.png

Travis Cave wrote:

 TM#4 ,with UC#22, was moved from the south hot cell to the east target station. Upon lowering the module down it made contact with the IMC, At that point the module was removed and placed back in the south hot cell. The IMC was inspected and problem corrected and the module was moved back to the east target station without a problem.

 The IMC (ITA0160) appears to have a dent in it from the contact with the Target Module. The pressure on the IMC was found to be about negative ~3 mmHg and was increased to ~20 mmHg to attempt to retract the IMC further away from the TM. This pressure is similar to the pressure used at the Conditioning Station. The bellows appears not to be symmetrically compressed. It should be inspected again and pressure checked and monitored for upcoming module moves.

Entry  Friday, June 08, 2018, 14:24, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 

 TM#2 has been moved from the conditioning station to the south hot cell.

Entry  Wednesday, June 27, 2018, 14:56, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 

 TM2 has been moved from the silo to the south hot cell.

Entry  Tuesday, July 03, 2018, 09:57, Travis Cave, ITW, Standard Operation, TM2, Nb#8, Module move 

 TM#2 with Nb#8 has been moved from the south hot cell to the west target station.

Entry  Monday, July 23, 2018, 10:31, Travis Cave, ITE, Standard Operation, TM4, Ta#56, Module move 

 TM#4 with Ta#56 has been moved from the conditioning station to the east target station.

Entry  Tuesday, July 31, 2018, 10:20, Travis Cave, South Hot-Cell, Standard Operation, TM2, Nb#8, Module move 

 TM#2 with Nb#8 has been moved from ITW to the south hot cell.

Entry  Tuesday, August 14, 2018, 10:27, Travis Cave, ITW, Standard Operation, TM2, UC#23, Module move 

 Both the West Entrance and TM#2 with UC#23 have been moved back into their places in the west target station. The Entrance module move wasn't completely smooth as it did suffer a little bumpiness when the shield plug part was installed, I was lifted back out again and no visible damage was observed on the delicate items.

Entry  Tuesday, August 28, 2018, 10:53, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#56, Module move 

 TM#4 with Ta#56 has been moved from the east station to the south hot cell.

Entry  Tuesday, September 04, 2018, 09:57, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#24, Module move 

 TM#4 with UC#24 has been moved from the conditioning station to the east target station.

Entry  Friday, September 14, 2018, 09:39, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 

 TM#3 with no target has been moved from the north east silo to the conditioning station.

Entry  Tuesday, September 18, 2018, 12:59, Travis Cave, South Hot-Cell, Standard Operation, TM2, UC#23, Module move 

 TM#2 with UC#23 has been moved from ITW to the south hot cell. The shield plug was also installed remotely as well.

Entry  Thursday, September 20, 2018, 14:36, Travis Cave, ITW, Standard Operation, TM2, nSiC#1, Module move 

 TM#2 with nSiC#1 has been moved from the south hot cell to the west target station.

Entry  Thursday, September 27, 2018, 13:58, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 

 TM#3 has been moved from the conditioning station to the centre east silo. This will be its new home after the silo switcher-roo.

Entry  Tuesday, October 02, 2018, 09:59, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#24, Module move 

 TM#4 with UC#24 has been moved from the east target station to the south hot cell.

Entry  Tuesday, October 09, 2018, 13:46, Travis Cave, ITE, Standard Operation, TM4, Ta#57, Module move 

 TM#4 with Ta#57 has been moved from the conditioning station to the east target station.

Entry  Monday, October 22, 2018, 14:05, Travis Cave, ITW, Repair, , , Module move 

 ITW Exit #2 has been moved from the west station to the south hot cell for a bellows repair.