  2672   Tuesday, September 03, 2024, 11:40 David WangITWStandard OperationTM3TiC#8TM3 has been moved from ITW to S-W silo.

TM3 has been moved from ITW to S-W silo. The move is smooth.

  2683   Tuesday, September 17, 2024, 11:16 David WangITWStandard OperationTM4TiC#9TM4 has been moved from TCS to ITW.

TM4 has been moved from TCS to ITW. The move is smooth.

  2684   Tuesday, September 17, 2024, 13:42 Frank SongITWStandard OperationTM4TiC#9 Module Connection

 TM4 with target TiC#9 is connected in ITW. See attachment.

Attachment 1: TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf
TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf
  2689   Monday, September 23, 2024, 11:35 David WangITWStandard OperationTM4TiC #9.vacuum leak check on TM4 service cap in ITW.

vacuum leak check on TM4 service cap in ITW was done this morning.   leak detector leak rate 0.0XE-9 atm.cc/sec. No leak on TM4 service cap module top.

  2710   Tuesday, November 05, 2024, 09:49 Frank SongITWStandard OperationTM4TiC#9 module disconnection

 TM4 with spent target TiC#9 was disconnected in 29-10-2024 and it is being moved from ITW to SHC.

Attachment 1: TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf
TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf
  2717   Tuesday, November 12, 2024, 12:30 Frank SongITWStandard OperationTM4UCx#46Module Connection

 TM4 with new target UCx#46 was moved from TCS to ITW and has been re-connected right after. see attachment pls.

Attachment 1: TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf
TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf TM4_with_new_target_UCx#46_connection_in_ITW_2024-11-12.pdf
  2739   Friday, January 03, 2025, 10:41 David WangITWStandard OperationTM4UCX46ITW primary and secondary vacuum vessel leak check for 2025 shut down

ITW primary and secondary vacuum vessel leak check for  2025 shut down has been done. Also,TM4 internal water line helium pressure test has been finished.  Both results are normal. There are two small old leak on EXit 1 and Exit2 module top plate  o-ring under 1Xe-8 atm.cc/sec which we knoew in past years test. resin spray on leak  area reduce the leak ratee below 5Xe-9 atm.cc/sec. No concern on these small leak.   See attachment  for detail results.

Attachment 1: ITW_primary_and_secondary_vacuum_leak_check_2025.pdf
ITW_primary_and_secondary_vacuum_leak_check_2025.pdf ITW_primary_and_secondary_vacuum_leak_check_2025.pdf
  2741   Monday, January 06, 2025, 08:38 Frank SongITWStandard OperationTM4UCx#46module disconnection

 TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached.

Attachment 1: TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf
TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf TM4_with_UCx#46_disconnection_in_ITW_2025-01-02.pdf
  2764   Tuesday, February 04, 2025, 11:50 Alexander ShkuratoffITWStandard Operation  ITW HV bias test without module (Work permit I2025-02-03-2)

Tuesday, February 04, 2025, 10:15

  • Started voltage ramp up. Using 250 V increments.

 Tuesday, February 04, 2025, 12:07

  • Current has got a bit noisy, starting at around 56.5 kV.
  • Currently at 57 kV. Voltage is stable though.
    • Current is about 151 uA on average, with spikes up to 164 uA.
  • Held at 57 kV for about 5 minutes, no drops in voltage, so continuing ramp.
  • 57.25 kV
    • There is noise in the current each time the voltage is increased. It seems to calm down slowly, with the later noise/spikes being less frequent and lower magnitude.
    • Average current is about 151 uA. Spikes at the start were as high as 169 uA, and after about 8 minutes they are about 160 uA.
    • Held here for about 10 minutes before continuing ramp.
  • I will try to get to 58 kV, and then back down to 57 kV to see if the current calms down and there is some sort of conditioning effect. If there is, I'm not sure of the mechanism since nothing is in vacuum.

Tuesday, February 04, 2025, 12:51

  • Dropping down to 57 kV, the current was about 150 uA and there were no more noise spikes. Seems like conditioning. Going back to 58 kV and continuing ramp.

Tuesday, February 04, 2025, 13:09

  • At 60 kV. Average current is about 187 uA initially, which could just be the average of the noise. It looks like it's dropping a few minutes later. About 10 minutes later, the current is 184 uA. 181 uA after 20 minutes.
  • It's been stable for about 30 minutes now. No voltage fluctuations, noise in the current has been the same or decreasing.
  • Current is about 177 uA after 80 minutes.

Tuesday, February 04, 2025, 14:36

  • It's been 1.5 hours and the voltage has been stable the whole time. All is good. Ramping down.

Tuesday, February 04, 2025, 14:50

  • Power supply off
  • Data dumped to http://isacwserv.triumf.ca/onlylocal/isacdata/ITW_HV_test_shutdown2025.txt

 

  2782   Friday, March 07, 2025, 09:07 David WangITWStandard Operation  ITW water signals interlock annual check is done.

Chole and I finished ITW water signals interlock. No issue.

  2784   Tuesday, March 11, 2025, 08:44 David WangITWStandard Operation  ITW:TP3,TP4, TP1S TP4S have been started since March 06th.

To prevent TP bearings seize during shut down, ITW:TP3,TP4, TP1S TP4S have been started since March 06th. They work fine.  The plan is to switch them off this Thursday, and restart them in May before ITW in use.

  2628   Tuesday, July 02, 2024, 11:38 Frank SongITE/ITW/Storage AreaStandard Operation  shielding blocks transfer

 5 shielding blocks have been moved from ITW to ITE, MAA area has been secured.

  2645   Wednesday, July 24, 2024, 10:10 Frank SongITE/ITW/Storage AreaStandard Operation  shielding blocks transfer

 5 shielding blocks have been transferred from ITE to ITW. MAA is secured again after moving.

  1144   Tuesday, December 01, 2015, 11:26 Travis CaveITE/ITW CoolingStandard OperationTM4UC#14Module moved

TM#4 with UC#14 has been moved from the conditioning station to the east target station.

  1164   Monday, March 14, 2016, 11:24 David WangITE/ITW CoolingMaintenance  HALCW resin tank filter cartridges are changed today

Two of resin tank filter cartridges(supply and return) are changed today. Old cartridges and bagged and tagged. The contact field on them are 650usv/hr. The new cartridges are fiber-glass, Triumf store item. After replacement, the field on contact with the filter case are about 10 usv/hr. But the field on contact with top resin tank  has been increased from 45usv/hr  to 225 usv/hr

 The flow rate is relatively stable before and after change. See attachment

Attachment 1: 002.JPG
002.JPG
Attachment 2: 003.JPG
003.JPG
Attachment 3: 006.JPG
006.JPG
  1200   Friday, April 08, 2016, 08:13 Anders MjosITE/ITW CoolingMaintenance  High Active Water Resistivity

The high active water resistivity took a long time to recover after the upgrade to the water cooling circuit. The system needed about a month (from end February to end March) to recover to nominal values. See attached plot of archiver data.

TM1 has now been connected in ITW and the water resistivity remains > 8 MOhm cm, which should allow normal operation. However, the resin is suspected to be approaching end of life. Work is ongoing to get a new replacement resin tank.

Attachment 1: 2016-04-08_ISAC_High_Active_Water_Resistivity.png
2016-04-08_ISAC_High_Active_Water_Resistivity.png
  1671   Tuesday, January 02, 2018, 10:46 David WangITE/ITW CoolingStandard Operation  Start High active water system.

High active water system  was  checked before restart. A small water leak on resin can supply valve was found. It is fixed. MP1 and MP2 were started and checked separately. System pressure and flow rate are normal.MP1 is in operation now. 

  1676   Tuesday, January 16, 2018, 06:50 David WangITE/ITW CoolingStandard Operation  Field measurement on old resin tank in silo

The old resin tank has been stored in silo since last year March.  Without crane the tank up, We use the pole monitor measured the field around the bottom of the tank in silo. The average contact field on the bottom is about 4.0msv/hr. @0.5meter , the field is about  900usv/hr. It is still too hot to remove it.

  1693   Wednesday, March 07, 2018, 10:36 David WangITE/ITW CoolingDevelopment  HALCW resin can flow meter replacment

HALCW resin can flow meter replacement is done. Less that 100 mL water was drained to a small tray during the job. RPG checked the water. Less than 20 counts. Water are dumped the high active sump.   The HALCW MP1 is started. No leak on new gauges and fittings. Old gauge is labeled , bagged, and stored in TH.

  2080   Monday, March 09, 2020, 14:31 David WangITE/ITWStandard Operation  TH emergency exit test.

Frank and I did the test.  The emergency exit hatch on roof was opened and closed twice. Everything works fine.