1893
|
Monday, March 18, 2019, 07:23 |
David Wang | Conditioning Station | Repair | TM2 | | TM2 window line helium test | New seals with a blank off cap are installed
on TM2 window line water block.
The seals are checked at TCS with 70 psi |
|
1895
|
Wednesday, March 20, 2019, 11:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
1896
|
Thursday, March 21, 2019, 09:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | Tray insertion | This morning new water block fasteners
and gas line capture nut fasteners were inserted
into the hot cell. Window waterline blank |
 |
1897
|
Monday, March 25, 2019, 10:11 |
Aaron Schmidt | South Hot-Cell | Repair | TM2 | | LP-FEBIAD Test Target (empty) | Link to previous target information: https://elog.triumf.ca/TIS/RH-ISAC/1039
|
|
1898
|
Tuesday, March 26, 2019, 09:32 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Dummy Target | Module move | TM#2 with a new source tray and the
dummy target has been moved from the south
hot cell to the conditioning station. |
|
1899
|
Tuesday, March 26, 2019, 11:10 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Dummy Target | Electrical Check | Electrical Check of TM#2 with the
dummy target attached. |
|
1900
|
Tuesday, March 26, 2019, 11:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Checks of TM#2 during the source tray change. | The four electrical check done on
TM#2 during the source tray change. |
   |
1901
|
Thursday, March 28, 2019, 10:27 |
David Wang | Conditioning Station | Repair | TM2 | dummy febiad test target | TM2 new source tray helium pressure test at TCS. | Helium pressure test on TM2 all water circuits
is done. 70 psi helium , 10 minutes test
time. Leak detector :base leak rate 0.0XE-9 |
|
1902
|
Thursday, March 28, 2019, 12:48 |
Anders Mjos | Conditioning Station | Repair | TM2 | dummy febiad test target | TM2 new source tray helium pressure test at TCS. |
|
|
1922
|
Thursday, May 16, 2019, 12:31 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#58 | Ta #58 installed | Ta #58 has been installed onto TM2. All
new silver plated high current fasteners.
All torqued to 130 in lbs. |
|
1923
|
Thursday, May 16, 2019, 14:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#58 | Electrical Check | Results of the electrical check of
TM#2 without target and with the new Ta#58
target. |
 |
1924
|
Friday, May 17, 2019, 10:47 |
Travis Cave | ITE | Standard Operation | TM2 | Ta#58 | Module move | TM#2 with Ta#58 has been moved from
the south hot cell to the east target station. |
|
1932
|
Tuesday, June 04, 2019, 08:46 |
David Wang | ITE | Standard Operation | TM2 | | ITE water signal interlock check. | ITE water signal interlock check is done.
Everything is good. Coil 2 circuit
no longer used in ITE . PQRU are looped as |
|
1943
|
Friday, June 14, 2019, 08:15 |
David Wang | ITE | Standard Operation | TM2 | | 5 shielding blocks are moved to ITE. | ITE is configured to take proton beam. |
|
1959
|
Thursday, August 08, 2019, 09:33 |
Carla Babcock | ITE | Development | TM2 | Ta#58 | TM2 HV conditioning with protons, round 1 | Starting HV tests on TM2 with 50uA of protons.
Tuesday, August 06, 2019, 03:37 :
Ramping up 500V every 2mins or so, couple |
|
1960
|
Tuesday, August 13, 2019, 09:49 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | Ta 58 | TM2 Move | TM2 was moved from ITE to South Hot Cell.
Tantalum 58 target. |
|
1961
|
Wednesday, August 14, 2019, 08:55 |
David Wang | ITE | Standard Operation | TM2 | | TM2 has been disconnected in ITE. | TM2 has been disconnected in ITE. The bias
jumper between U and T was burned out during
the last beam time. |
|
1962
|
Wednesday, August 14, 2019, 11:43 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#58 and no target. | Results of electrical checks post beam at the south hot cell. | Here are the results of the electrical
done at the south hot cell post beam of with
the Ta#58 target attached and with just the |
 |
1963
|
Thursday, August 15, 2019, 09:36 |
Adam Newsome | ITE | Standard Operation | TM2 | ZrC #8 | TM2 Move | TM2 was moved from South Hot Cell to ITE.
ZrC #8 target. |
|
1964
|
Thursday, August 15, 2019, 09:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Electrical Check | Electrical of TM#2 with ZrC#8 at
the south hot cell. See attached for details. |
|