  1253   Tuesday, June 07, 2016, 11:36 David WangITEStandard OperationTM4Ta#47TM4 has been disconnected in ITE.

Dan and I disconnected TM4 in ITE. HS water lines has been purged.

  1252   Friday, June 03, 2016, 16:04 Aurelia LaxdalSouth Hot-CellRepairTM3 5K mega test on TM3

Aurelia Laxdal wrote:

David Wang wrote:

I did a 5KV mega test on TM3.  Only5Mohm @5kV between coli line PQ and chassis(ground). It confirmed the close gap between P,Q and GE. Other lines are ok. See attachment.

See attachment for sparking signs of the water lines mentioned  above (Coil and Ground Electrode lines) in TM3 Source Tray.

PLEASE NOTE: the resistance values for A and B on David's attachment are not correct since these measurements were done after Chad removed the target and the heat-shield bracket was moved, so consequently the water lines were not at their nominal locations. Once they were back in plac,e David took another measurement and the resistance values for A and B showed also 3,000 MOhm (as it was for most of the lines). The only lines that still showed a low resistance were the Coil lines. 

  1251   Friday, June 03, 2016, 11:35 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moved

TM#3 has been moved back to the north east silo.

  1250   Thursday, June 02, 2016, 18:04 Aurelia LaxdalSouth Hot-CellRepairTM3 5K mega test on TM3

David Wang wrote:

I did a 5KV mega test on TM3.  Only5Mohm @5kV between coli line PQ and chassis(ground). It confirmed the close gap between P,Q and GE. Other lines are ok. See attachment.

See attachment for sparking signs of the water lines mentioned  above (Coil and Ground Electrode lines) in TM3 Source Tray.

Attachment 1: DSC_0821.JPG
DSC_0821.JPG
Attachment 2: DSC_0822.JPG
DSC_0822.JPG
  1249   Thursday, June 02, 2016, 11:59 David WangSouth Hot-CellRepairTM3 5K mega test on TM3

I did a 5KV mega test on TM3.  Only5Mohm @5kV between coli line PQ and chassis(ground). It confirmed the close gap between P,Q and GE. Other lines are ok. See attachment.

Attachment 1: 5K_mega_check_on_TM3.pdf
5K_mega_check_on_TM3.pdf
  1248   Thursday, June 02, 2016, 08:44 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical Check

Electrical check of TM#3 no target at the south hot cell. see attached for results.

Attachment 1: TM3_elec_chk_no_tgt.PDF
TM3_elec_chk_no_tgt.PDF
  1247   Tuesday, May 31, 2016, 09:45 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moved

TM#3 has been moved from the NE Silo to the south hot cell.

  1246   Wednesday, May 25, 2016, 14:08 David WangITWStandard OperationTM2Ta#48TM2 has been connected in ITW

TM2 has been connected in ITW by Dan.M and David.W. All turbo-pumps have been started. Everything is good so fine.

  1245   Wednesday, May 25, 2016, 10:57 Travis CaveITWStandard OperationTM2Ta#48module moved

TM#2 with Ta#48 has been moved from conditioning station to the west target station.

  1244   Tuesday, May 24, 2016, 10:52 Travis CaveSpent Target VaultStandard Operation UC#15Spent Target move

Spent UC#15 has been moved from the south hot cell to the spent target storage. It was placed in pail number 136, and placed in spot C of tray one. It was 14.1mSv/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_May_24_2016.pdf
Vault_Storage_May_24_2016.pdf Vault_Storage_May_24_2016.pdf Vault_Storage_May_24_2016.pdf Vault_Storage_May_24_2016.pdf
  1243   Tuesday, May 24, 2016, 10:42 David WangConditioning StationStandard OperationTM2 Target Hall schedule for beam schedule 130 (Apr- Sep)

Weekly update the TH schedules. See attachments 1, 2,3.

Attachment 1: Target_Hall_shedule_130_Apr_to_Sep_2016.xlsx
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.mpp
Attachment 3: Target_Hall_shedule_130_Apr_to_Sep.pdf
Target_Hall_shedule_130_Apr_to_Sep.pdf
  1242   Tuesday, May 24, 2016, 10:39 David WangConditioning StationStandard OperationTM2Ta#48TM2 and TCS turbo-pumps have been switched off this morning.

The TCS and TM2 are still under vacuum without venting

  1241   Friday, May 20, 2016, 10:38 David WangConditioning StationStandard OperationTM2Ta#48Helium pressure test on TM2 with new Lp Ta target

LD base LR: 0.0 X E-9. Base pressure:0.0 X E-4. 70 psi helium. 5 minutes each circuit.

window 0.0X E-9  
HS 0.0X E-9  
EE 0.0X E-9  
Ta+ 0.0X E-9  
Ta- 0.0X E-9  
coil1 R-U 0.0X E-9  
Coil2 P-Q 5.0X E-9  
Tube- 5.1X E-9  
Tube+ 1.1X E-8  
MSP 3.5X E-9  

The bigger leak found on MSP before was gone. Leak rate are smaller on all circuits  comparing to before. 

The leak rate on 1 hour total lines test at 70 psi is better also which is 6.6 XE-8 atm.cc/sec this time. 

  1240   Friday, May 20, 2016, 08:13 David WangConditioning StationStandard OperationTM2Ta#48I switched off TCS and TM2 water system

Disconnected  TM2 at TCS(vacuum system still on). Purged all TM2 water lines for helium pressure test.

  1239   Thursday, May 19, 2016, 10:35 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moved

TM#1 has been moved from the south hot cell to the north west silo.

  1238   Wednesday, May 18, 2016, 11:42 Travis CaveSouth Hot-CellStandard OperationTM1UC#15module moved

TM#1 with  UC#15 has been moved from the west target station to the south hot cell. The target shield plug was also remotely installed as well.

  1237   Tuesday, May 17, 2016, 14:15 Travis CaveITWStandard OperationTM1UC#15module moved

TM#1 with UC#15 was moved back to the west station due to alpha concerns.

  1236   Tuesday, May 17, 2016, 11:47 Travis CaveSouth Hot-CellStandard OperationTM1UC#15module moved

TM#1 has been moved from the west target to the south hot cell. The target on TM#1 is UC#15.

  1235   Monday, May 16, 2016, 13:26 Anders MjosConditioning StationStandard OperationTM2Ta#48Conditioning Ta#48

 Monday, May 16, 2016, 13:20: BIAS/EL/EE 30 / 15 / 1.5 kV

Monday, May 16, 2016, 13:20: Ramping TGHT / TBHT to 580 / 220 A at 2 A/min. IG2 1E-6 / 2E-6 T

Monday, May 16, 2016, 15:45: Paused ramping.

Monday, May 16, 2016, 15:00: Resumed ramping

Monday, May 16, 2016, 16:23: Stopped ramping for the day. TGHT / TBHT at 310 / 220 A. FC at 6.2E-7 A


Tuesday, May 17, 2016, 08:00: Continue ramping.


Wednesday, May 18, 2016, 09:40: BIAS / EL / EE to 35 / 17.5 1.7 kV


Thursday, May 19, 2016, 04:07: BIAS dropped to 0. Likely caused by a power bump.

Thursday, May 19, 2016, 08:05: BIAS returned to 35 kV. Increased EL to 22 kV to maximize FC current.

Thursday, May 19, 2016, 08:11: TBHT to 230 A

Thursday, May 19, 2016, 08:22: Ramping down TGHT / TBHT

Thursday, May 19, 2016, 10:41: BIAS / EL / EE off

Thursday, May 19, 2016, 14:00: TGHT / TBHT off


Friday, May 20, 2016, 14:39: RGA off.

Attachment 1: Ta#48.docx
  1234   Monday, May 16, 2016, 11:16 David WangITWStandard OperationTM1 ITW, TM1 turbo-pumps are swithched off

I let isac opp switched off ITW turbo-pumps. The argon vent valve in electrical room is opened. The ITW argon venting will be started  soon.