Entry  Tuesday, June 07, 2016, 11:37, David Wang, ITE, Standard Operation, TM4, Ta#47, TM4 has been moved from ITE to SHC 
Bill and Yasmine did the move. Everything is good.
Entry  Tuesday, June 07, 2016, 11:36, David Wang, ITE, Standard Operation, TM4, Ta#47, TM4 has been disconnected in ITE. 
Dan and I disconnected TM4 in ITE. HS water lines has been purged.
Entry  Thursday, June 02, 2016, 11:59, David Wang, South Hot-Cell, Repair, TM3, , 5K mega test on TM3 5K_mega_check_on_TM3.pdf
I did a 5KV mega test on TM3.  Only5Mohm @5kV between coli line PQ and chassis(ground). It confirmed the close gap between P,Q and GE. Other lines
are ok. See attachment.
    Reply  Thursday, June 02, 2016, 18:04, Aurelia Laxdal, South Hot-Cell, Repair, TM3, , 5K mega test on TM3 DSC_0821.JPGDSC_0822.JPG


    
        
            David Wang wrote:
        
        
            
            I did a 5KV mega test on TM3.  Only5Mohm @5kV between coli line PQ and chassis(ground). It confirmed
       Reply  Friday, June 03, 2016, 16:04, Aurelia Laxdal, South Hot-Cell, Repair, TM3, , 5K mega test on TM3 


    
        
            Aurelia Laxdal wrote:
        
        
            
            
            
              
Entry  Friday, June 03, 2016, 11:35, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module moved 
TM#3 has been moved back to the north east silo.
Entry  Thursday, June 02, 2016, 08:44, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical Check TM3_elec_chk_no_tgt.PDF
Electrical check of TM#3 no target at the south hot cell. see attached for results.
Entry  Tuesday, May 31, 2016, 09:45, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module moved 
TM#3 has been moved from the NE Silo to the south hot cell.
Entry  Wednesday, May 25, 2016, 14:08, David Wang, ITW, Standard Operation, TM2, Ta#48, TM2 has been connected in ITW 
TM2 has been connected in ITW by Dan.M and David.W. All turbo-pumps have been started. Everything is good so fine.
Entry  Wednesday, May 25, 2016, 10:57, Travis Cave, ITW, Standard Operation, TM2, Ta#48, module moved 
TM#2 with Ta#48 has been moved from conditioning station to the west target station.
Entry  Tuesday, May 24, 2016, 10:52, Travis Cave, Spent Target Vault, Standard Operation, , UC#15, Spent Target move Vault_Storage_May_24_2016.pdf
Spent UC#15 has been moved from the south hot cell to the spent target storage. It was placed in pail number 136, and placed in spot C of tray one. It
was 14.1mSv/hr upon removal from the south hot cell.
Entry  Tuesday, May 24, 2016, 10:42, David Wang, Conditioning Station, Standard Operation, TM2, , Target Hall schedule for beam schedule 130 (Apr- Sep) Target_Hall_shedule_130_Apr_to_Sep_2016.xlsxTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf
Weekly update the TH schedules. See attachments 1, 2,3.
Entry  Tuesday, May 24, 2016, 10:39, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, TM2 and TCS turbo-pumps have been switched off this morning. 
The TCS and TM2 are still under vacuum without venting
Entry  Friday, May 20, 2016, 10:38, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, Helium pressure test on TM2 with new Lp Ta target 
LD base LR: 0.0 X E-9. Base pressure:0.0 X E-4. 70 psi helium. 5 minutes each circuit.

    
        
            window
 
          0.0X E-9
             
        
        
            HS
    
Entry  Friday, May 20, 2016, 08:13, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, I switched off TCS and TM2 water system 
Disconnected  TM2 at TCS(vacuum system still on). Purged all TM2 water lines for helium pressure test.
Entry  Thursday, May 19, 2016, 10:35, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module moved 
TM#1 has been moved from the south hot cell to the north west silo.
Entry  Wednesday, May 18, 2016, 11:42, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#15, module moved 
TM#1 with  UC#15 has been moved from the west target station to the south hot cell. The target shield plug was also remotely installed as well.
Entry  Tuesday, May 17, 2016, 14:15, Travis Cave, ITW, Standard Operation, TM1, UC#15, module moved 
TM#1 with UC#15 was moved back to the west station due to alpha concerns.
Entry  Tuesday, May 17, 2016, 11:47, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#15, module moved 
TM#1 has been moved from the west target to the south hot cell. The target on TM#1 is UC#15.
Entry  Monday, May 16, 2016, 13:26, Anders Mjos, Conditioning Station, Standard Operation, TM2, Ta#48, Conditioning Ta#48 Ta#48.docx
 Monday, May 16, 2016, 13:20: BIAS/EL/EE 30 / 15 / 1.5 kV
Monday, May 16, 2016, 13:20: Ramping TGHT / TBHT to 580 / 220 A at 2 A/min. IG2 1E-6 / 2E-6 T
Monday, May 16, 2016, 15:45: Paused ramping.
Entry  Monday, May 16, 2016, 11:16, David Wang, ITW, Standard Operation, TM1, , ITW, TM1 turbo-pumps are swithched off 
I let isac opp switched off ITW turbo-pumps. The argon vent valve in electrical room is opened. The ITW argon venting will be started  soon.
Entry  Monday, May 16, 2016, 10:48, Anders Mjos, Conditioning Station, Maintenance, , , Topped up water in TCS:TK2 
 Filled from 15 to 25 in