Entry  Tuesday, August 02, 2016, 14:52, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#17, module moved 
TM#4 with UC#17 is now in the conditioning station.
Entry  Tuesday, August 02, 2016, 13:32, chad fisher, South Hot-Cell, Standard Operation, TM4, UC#16, UC#16 Removed #17 installed 
UCx#16 has been removed from TM$ and UCx#17 installed, high current conductors toqued to 130 in lbs.
 
UCx#16 did not show the standard arcing marks on the 9 pin connector.
Entry  Tuesday, August 02, 2016, 11:02, Travis Cave, ITE, Standard Operation, TM4, UC#16, module moved 
TM#4 with UC#16 has been moved from the east station to the south hot cell. The shield plug was also install remotely once it was hooked up due to alphas.
Entry  Friday, July 29, 2016, 14:27, Isaac Earle, North Hot-Cell, Development, , , North Hot Cell Measurements & Cleanup 
 The North Hot Cell was accessed today via the Ante Room for inspection, measurements,
and clean-up.  There were no modules in the SHC or TCS, and no spent targets in the SHC.  Under these conditions the maximum field in the NHC
was approximately 2μSv/hr.  The inside of the cell was cleaned and swept, followed
Entry  Thursday, July 28, 2016, 11:27, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module moved 
TM#3 with no target has been moved from the conditioning station to the NE silo.
Entry  Tuesday, July 26, 2016, 11:22, chad fisher, South Hot-Cell, Maintenance, , , Soth Hot Cell Waste Storage Vault Tunnel 
The two 45 gal (m) drums of waste removed from the south hot cell in December 2015 and January 2016 were transferred from the north hot cell to the shaft
of the east vault tunnel on Monday, July 25th 2016 and subsequently to the east tunnel bunker in the vault tunnel on Tuesday, July 26th, 2016.The first
drum (removed from the hot cell in December) containing both activated and contaminated metals was measured at 900 uSv/hr @ .5 m and the second drum (removed
Entry  Monday, July 25, 2016, 08:15, Anders Mjos, Conditioning Station, Repair, TM3, , HV Test TM3_HV_conditioning_2016-07-25.docxTCS-2016-07-25_TM3_no_target.rgaTCS-2016-07-26_TM3_no_target.rga
 Monday, July 25, 2016, 08:14: Enabled staging for chiller
Monday, July 25, 2016, 08:33: Disabled staging. Fault 2. Staging does not work at this point.
Monday, July 25, 2016, 08:34: Running CP1 manually to cool down water.
Entry  Friday, July 22, 2016, 10:57, David Wang, Conditioning Station, Repair, TM3, , TM3 has been moved and connected at TCS 
I started vacuum system.
I started TCS water system. The chiller does not work properly still. But, It will not affect the TM3 HV conditioning.  HV cover is installed
on TM3 in TH. The module is ready for HV conditioning.
Entry  Monday, July 18, 2016, 14:14, David Wang, Conditioning Station, Repair, TM3, , TM3 leak checked at TCS 
Last Friday July-15, TM3 was leak checked at TCS. All air to vacuum seals on service cap are good.  Helium pressure test on  TM3 water lines(except
GE, HS, and Window) were done. Leak detector has no response at 0.0xE-9 atm.cc/sec. They are leak free.
    Reply  Tuesday, July 19, 2016, 14:35, Aurelia Laxdal, Conditioning Station, Repair, TM3, , TM3 leak checked at TCS 


    
        
            David Wang wrote:
        
        
            
            Last Friday July-15, TM3 was leak checked at TCS. All air to vacuum seals on service cap are good.  Helium pressure
Entry  Monday, July 18, 2016, 13:56, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module moved 
TM#3 is now in the south hot cell.
Entry  Thursday, July 14, 2016, 10:54, David Wang, Conditioning Station, Standard Operation, TM2, , Target Hall schedule for beam schedule 130 (Apr- Oct, 2016) Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep_2016.pdfTarget_Hall_shedule_129_Sep_to_Dec.xlsx
Update TH schedule 130 according to mini-shut down change.See attachment 1,2,3,4
Entry  Wednesday, July 13, 2016, 08:47, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module moved 
TM#3 has been moved from the north east silo to the conditioning station.
Entry  Tuesday, July 12, 2016, 12:42, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule for beam schedule 130 (Apr- Sep) Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mpp
Update schedule weekly.Attachment 1,2
Entry  Tuesday, July 12, 2016, 12:40, David Wang, ITW, Standard Operation, TM2, , TM2 has been connected in ITW 
All turbo-pumps are started. Everything is good so far.
Entry  Tuesday, July 12, 2016, 09:59, Travis Cave, ITW, Standard Operation, TM2, SiC#33, module moved 
TM#2 with SiC#33 has been moved from the conditioning station to the west target station.
Entry  Monday, July 11, 2016, 10:59, Travis Cave, Spent Target Vault, Standard Operation, , Ta#48, Spent Target move Vault_Storage_July_11_2016.pdf
The spent Ta#48 was moved from the south hot cell to the spent target vault. I was placed in pail 139 and is in spot 6C in the vault. It was 201mSv/hr
when measured at the hot cell. See the attached PDF for the latest results.
Entry  Friday, July 08, 2016, 08:20, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 has been connected at TCS 
I connected TM2 to TCS and started water system.
Entry  Wednesday, July 06, 2016, 15:23, Anders Mjos, Conditioning Station, Standard Operation, TM2, SiC#33, Conditioning SiC#33 SiC#33.docxTCS-2016-07-06-SiC#33.rga
 Wednesday, July 06, 2016, 15:23: RGA on. IGs on

Friday, July 08, 2016, 17:07: Stopped cooling system due to a problem with the chiller. Will continue with HV conditioning on Monday.

Monday, July 11, 2016, 08:08: Cooling system started. Operating CP1 manually to control temperature
Entry  Wednesday, July 06, 2016, 14:25, David Wang, Conditioning Station, Standard Operation, TM2, , TCS and TM2 turbo-pumps have been started. 
The TCS and TM2 are pumping down.
Entry  Wednesday, July 06, 2016, 13:38, Travis Cave, Conditioning Station, Standard Operation, TM2, SiC#33, module moved 
TM#2 with SiC#33 has been moved from the south hot cell to the conditioning station.