Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 73 of 138  Not logged in ELOG logo
IDdown Date Author Category Type Module Target/Number Subject Text Attachments
  1321   Tuesday, August 16, 2016, 11:27 chad fisherSouth Hot-CellMaintenance  South Cell Field ReadingsField readings have been taken at the south
hot cell in preparation for entry into the
cell to fix manipulator.
  
  1320   Monday, August 15, 2016, 10:15 David WangConditioning StationStandard OperationTM4 Target Hall schedule for beam schedule 130 (Apr- Oct, 2016)Weekly update target hall schedule. Everything
on schedule are finished  on time.  
See attachment.  
 Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mpp 
  1319   Monday, August 15, 2016, 10:08 David WangITEStandard OperationTM4UC#175 Shielding blocks have been transferred from ITW to ITE.Dan and I transferred 5 shielding blocks
from ITW to ITE. The ITE is configured to
take proton beam.
  
  1318   Friday, August 12, 2016, 10:59 Anders MjosConditioning StationDevelopmentTM3 HV Test with Service Chase Panel removedWater cooling is performed manually with
CP1. RGA is ON since yesterday. EE is not
connected and in conditioning mode.
 TM3_HV_conditioning_2016-08-12.docxTCS-2016-08-11_TM3_Service_Chase_Panel_Removed.rga 
  1317   Friday, August 12, 2016, 09:58 chad fisherSouth Hot-CellMaintenance  Manipulator MaitenanceDisassembled the master side of the right
manipulator this morning to check the wrist
cable. The cable on the master side shows
  
  1316   Thursday, August 11, 2016, 10:37 David WangConditioning StationRepairTM3  TM3 service tray cover plate ITA2108 has been removed.Requested by Aurelia, and approved by Friedhelm,
TM3 service tray cover plate ITA2108 has
been remove out of the module. The plated
  
  1315   Wednesday, August 10, 2016, 14:38 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Ventilation Test ResultsTesting was performed on August 9th on
the ISAC nuclear ventilation system to determine
if the existing ventilation system can achieve
  
  1314   Wednesday, August 10, 2016, 12:18 chad fisherSouth Hot-CellMaintenance  Anteroom clearingBlack "radio active" materials
cabinet has been emptied, items bagged and
removed from the anteroom. Cabinet itself
  
  1313   Wednesday, August 10, 2016, 11:30 David WangITEStandard OperationTM4UC#17TM4 has been connected at ITEDan and I connected TM4 in ITE yesterday.
It is pumping down at ITE now. Everything
is fine so far.
  
  1312   Wednesday, August 10, 2016, 09:44 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 has been moved from the north east
silo to the conditioning station.
  
  1311   Tuesday, August 09, 2016, 11:36 Anders MjosConditioning StationMaintenance  RGA and CG1S moved The locations (ports) for the RGA
and CG1S was swapped today by Anders and
Isaac to provide clearance for the North
 Old.JPGNew.JPG 
  1310   Tuesday, August 09, 2016, 10:05 Travis CaveITEStandard OperationTM4UC#17module movedTM#4 with UC#17 is now in the east target
station.
  
  1309   Tuesday, August 09, 2016, 07:15 David WangConditioning StationStandard OperationTM4UCx17TM4 has been disconnected at TCSI stopped TCS water pumps this morning
. The argon venting for TCS is in processing.
  
  1308   Monday, August 08, 2016, 11:24 chad fisherSouth Hot-CellMaintenance  Anteroom Clean-up - WaveguideThe wave guide from TM3 has been surveyed,
swiped and removed from the anteroom and
transported to rad waste for disposal. The
  
  1307   Friday, August 05, 2016, 14:13 Isaac EarleNorth Hot-CellDevelopment  Preparations for NHC Ventilation TestA hole was drilled in the NHC exhaust duct
in the east end of the target hall above
the hatch to the Ante Room.  This will
  
  1306   Friday, August 05, 2016, 13:50 chad fisherSouth Hot-CellMaintenance  Anteroom clean outSome items have been removed from the anteroom
in preparation for painting. Items have been
placed on plastic in the south hot cell service
  
  1305   Thursday, August 04, 2016, 08:56 Travis CaveSpent Target VaultStandard Operation UC#16Spent Target moveThe spent UC #16 have been moved from the
south hot cell to the storage vault see attached
PDF for details.
 Vault_Storage_August_3_2016.pdf 
  1304   Wednesday, August 03, 2016, 10:02 Travis CaveSouth Hot-CellStandard OperationTM4UC#17Electrical CheckThe result of yesterdays electrical check
on TM#4 with UC#17.
 TM4_elechk_UC17_SHC.PDF 
  1303   Wednesday, August 03, 2016, 09:56 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Oct, 2016)Update schedule weekly. See attachments
1,2
 Target_Hall_shedule_130_Apr_to_Sep.mppTarget_Hall_shedule_130_Apr_to_Sep.pdf 
  1302   Wednesday, August 03, 2016, 09:49 David WangConditioning StationStandard OperationTM4 TM4 is ready for conditioing at TCS.I started TCS water system and installed
HV cover onto TM4.  The TM4 containment
box is supplied with water also. TM4 is ready
  
ELOG V2.9.2-2455