2643
|
Wednesday, July 17, 2024, 15:06 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround Complete - SHC/NHC Area | A safety walkaround for July 2024 was completed
for the B2 level by A. Newsome. No deficiencies
to report. |
|
|
2132
|
Thursday, August 06, 2020, 14:33 |
Adam Newsome | Spent Target Vault | Development | | | Safety Group Relay Interface Installation | A relay contact-based interface module
was installed in between Safety Group's storage
vault door enable junction box and Remote |
|
|
2125
|
Thursday, July 16, 2020, 10:20 |
Adam Newsome | Safe Module Parking | Maintenance | | | SMP: Annual Electrical Inspection | An electrical systems check was performed
on the SMP by Adam Newsome and Travis Cave.
Overall, there were no issues to |
|
|
1904
|
Thursday, April 04, 2019, 14:49 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum vessel support roller friction check | With the SMP vacuum vessel now installed
inside the shield box, a test was performed
to measure the torque required to rotate |
|
|
1990
|
Monday, September 30, 2019, 11:27 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum vessel modifications completed | The SMP vacuum vessel welds were reinforced
to match the specifications on IRH1710 Rev
D. In addition a tube stub was added |
|
|
1946
|
Thursday, July 04, 2019, 08:57 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum system installed | July 3:
- Assembled exhaust line flexible
hose and fittings as per ISK0529 Rev D then |
|
|
1955
|
Friday, July 26, 2019, 15:43 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum control system completed | The SMP vacuum control system has
been wired and setup to be controlled from
EPICS. Backing valve control (SMP:BV1) |
|
|
2014
|
Friday, October 25, 2019, 06:43 |
David Wang | Safe Module Parking | Development | TM3 | | SMP vacuum | TM3 was moved into SMP Oct 25 morning.
After two nights pumping down, SMP CG1 read
30mtorr this morning. The pump is stopped. |
|
|
2016
|
Monday, October 28, 2019, 12:00 |
Isaac Earle | Safe Module Parking | Development | | | SMP shielding attenuation measured & compared to theoretical values | The attenuation of the SMP shielding was
measured as part of SMP commissioning (Document-170404,
R1, Section 4, Test #8) |
|
|
2010
|
Tuesday, October 22, 2019, 16:26 |
Isaac Earle | Safe Module Parking | Development | | | SMP shield box grounding | A braided grounding strap was attached
to the aluminum gear box support on the SMP
shield box structure, and grounded by attaching |
|
|
1865
|
Monday, February 11, 2019, 10:26 |
Isaac Earle | Safe Module Parking | Development | | | SMP shield box and vacuum vessel moved to Target Hall | On February 8th the SMP shield
box (IRH1675) and the vacuum vessel (IRH1806)
were both raised from a horizontal to vertical |
6x |
|
1903
|
Monday, April 01, 2019, 14:56 |
Isaac Earle | Safe Module Parking | Development | | | SMP shield box and vacuum vessel installed in final location | Last week drilling of the additional
required holes in the SMP shield box was
completed in the Target Hall. This |
|
|
1944
|
Thursday, June 20, 2019, 15:09 |
Isaac Earle | Safe Module Parking | Development | | | SMP motor wiring inspected by electrician | The AC wiring for the SMP motor was inspected
by Randy Boehm (TRIUMF electrician) as recommended
by Franco Mammarella (TRIUMF electrical engineer). |
|
|
1857
|
Friday, January 11, 2019, 13:59 |
Isaac Earle | Safe Module Parking | Development | | | SMP motor selection decision | SMP drivetrain design work is currently
underway. Alejandro has selected a
suitable 1200:1 reducer which will give a |
|
|
1921
|
Wednesday, May 15, 2019, 16:06 |
Isaac Earle | Safe Module Parking | Development | | | SMP module support flange installed and leak checked | The SMP module support flange sub-assembly
(IRH1755) was installed today according to
drawing IRH1683. Dow Corning 111 sealing |
|
|
2745
|
Thursday, January 09, 2025, 11:46 |
David Wang | Safe Module Parking | Standard Operation | TM4 | No target | SMP is under vacuum for TM4 storage during shut down. | SMP:MP1 is started with SMP BV1 is
opened. SMP is under vacuum for TM4 storage
during shut down. |
|
|
2007
|
Tuesday, October 15, 2019, 16:42 |
Isaac Earle | Safe Module Parking | Development | | | SMP flange alignment tested using shield plug | As a preliminary test in preparation
for SMP commissioning, one of the steel module
shield plugs was installed into the SMP to |
|
|
2639
|
Friday, July 12, 2024, 08:51 |
Riley Sykes | Safe Module Parking | Maintenance | | | SMP chain guard | SS washers were added to all slotted
holes on SMP chainguard cover plate |
|
|
1970
|
Friday, August 23, 2019, 14:27 |
Isaac Earle | Safe Module Parking | Development | | | SMP camera video cabling installed and tested | Installation of the video lines for
the SMP cameras was completed yesterday according
to IRH1670 Rev B. All four cameras |
|
|
2037
|
Thursday, December 12, 2019, 14:39 |
Isaac Earle | Safe Module Parking | Development | | | SMP assembly shifted 1.0" north | The SMP assembly was shifted approximately
1.0" north today by pushing it, braced
against the south wall, using a 100 Ton capacity |
|