  RH-ISAC, Page 72 of 138  Not logged in ELOG logo
IDdown Date Author Category Type Module Target/Number Subject
  1341   Monday, August 29, 2016, 13:34 David WangConditioning StationStandard OperationTM2 TM2 has been disconnected at TCS

I stopped TCS water pumps and vacuum pumps also.   TM2 and TCS will be vented tomorrow morning.

  1340   Thursday, August 25, 2016, 14:25 Travis CaveSpent Target VaultStandard Operation SiC#33Spent Target move

SiC#33 was placed into pail #141 which in turn was placed into slot 2B of the vault. I was 295mS/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_August_25_2016.pdf
Vault_Storage_August_25_2016.pdf Vault_Storage_August_25_2016.pdf Vault_Storage_August_25_2016.pdf Vault_Storage_August_25_2016.pdf
  1339   Thursday, August 25, 2016, 13:59 David WangConditioning StationStandard Operation  Target Hall schedule for beam schedule 130 (Apr- Sep, 2016)

Weekly update schedule.  See attachment 1,2.

Attachment 1: Target_Hall_shedule_130_Apr_to_Sep.pdf
Target_Hall_shedule_130_Apr_to_Sep.pdf
Attachment 2: Target_Hall_shedule_130_Apr_to_Sep.mpp
  1338   Thursday, August 25, 2016, 08:43 David WangConditioning StationStandard OperationTM2 All TM2 connections to TCS are done.

The HV cover is installed. The Faraday cage at B2 level is locked also.The TCS and TM2 are still pumping down. Everything is good so far.

  1337   Thursday, August 25, 2016, 08:36 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 HS water lline

I did a helium pressure test on TM2 HS water line at TCS. Leak detector base leak rate only could get to 1.8x e-8 atm.cc/sec at this moment. Applied 5 minutes 70psi helium on it. No leak has been found at this level. I connected water to this circuit after the test for weekend TM2 conditioning at TCS.

I will do another helium pressure test after the conditioning. The LD base leak rate should be 0.0Xe-9 atm.cc/sec at that time.

2016-08-29: LD Base leak rate 0.0xe-9atm.cc/sec.TM2 HS line helium pressure check again after conditioning. 70psi helium 5minutes. no response on LD. HS line is perfectly sealed.

  1336   Wednesday, August 24, 2016, 14:42 Anders MjosConditioning StationStandard OperationTM2Ta#49Conditioning

Wednesday, August 24, 2016, 14:42: RGA on

Wednesday, August 24, 2016, 20:27: IG2 and IG1S on. Checked on water system.


Conditioning by ISAC operations. Water flow tripped power supplies after a few hours of conditioning at 580 / 230 A and 30 kV. See operations e-log for details.

Attachment 1: TCS-2016-08-24_Ta#49.rga
Attachment 2: Ta#49.docx
  1335   Wednesday, August 24, 2016, 14:37 Anders MjosSouth Hot-CellStandard Operation SiC#33PIE

 The target was inspected by Anders and Chad. The target was in good condition as can be seen on the photos on DocuShare. Only minor accumulation of material on the EE.

  1334   Wednesday, August 24, 2016, 11:06 Travis CaveSouth Hot-CellStandard OperationTM2Ta#49module moved and electrical check

TM#2 with Ta#49 has had its electrical check and was moved to the conditioning station. see the attached pdf for the electrical check details.

The electrical check has been edited to reflect that well the original has been just not the PDF.

Attachment 1: TM2_elechk_SiC34_SHC.PDF
TM2_elechk_SiC34_SHC.PDF
  1333   Wednesday, August 24, 2016, 10:45 David WangConditioning StationStandard OperationTM2 TM2 vacuum system has been connected at TCS

Start of roughing now.

  1332   Wednesday, August 24, 2016, 10:44 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.

Chad and I leak checked Tm2 Hs line with new target installed. Base LR 0.0Xe-9 atm.cc/sec.   No leak has been found. This line will be helium pressured at TCS later.

  1331   Wednesday, August 24, 2016, 10:41 David WangITWStandard OperationTM2 TM2 was disconnected in ITW yesterday.

TM2 was disconnected in ITW yesterday and moved to SHC.

  1330   Wednesday, August 24, 2016, 09:19 chad fisherSouth Hot-CellMaintenance  Anteroom Clean -up paint prep

Remaining items from anteroom have been bagged and removed (save the boot boxes, 1 garbage can and 1 coverall garbage can).

Room is ready to be surveyed so it can be deemed a non-boot box area for painting.

  1329   Wednesday, August 24, 2016, 09:17 chad fisherSouth Hot-CellStandard OperationTM2 Ta#49

Ta#49 has been installed on TM2 and tested. All high current fasteners torqued to 130 in lbs.

  1328   Tuesday, August 23, 2016, 13:31 chad fisherSouth Hot-CellStandard OperationTM2SiC#33SiC#33 Removed

SiC#33 has been removed from TM2.

  1327   Tuesday, August 23, 2016, 10:39 Travis CaveSouth Hot-CellStandard OperationTM2SiC#33module moved

TM#3 with SiC#33 has been moved from the west station to the south hot cell.

  1326   Tuesday, August 23, 2016, 08:05 chad fisherSouth Hot-CellMaintenance  Post Hot Cell Entry Clean-up

Plastic has been removed from the floor and any known active items in the hot cell moved to the south east corner in an attempt to shield the anteroom. Fields at the aluminum panel were reduced from 66 uSv/h to 58.8uSv\h. No contamination found on walls, floor, tacky mats, or standard aluminum cover. The aluminum cover with breathable air line hole did have 400 counts on 44-2, 1200 on ludlum.

 

  1325   Thursday, August 18, 2016, 14:19 Travis CaveConditioning StationStandard OperationTM3no targetmodule moved

TM#3 is now back in the the north east silo.

  1324   Thursday, August 18, 2016, 13:57 chad fisherSouth Hot-CellMaintenance  Manipulator maitenance

South hot cell was entered to check to replace cable if needed. Wrist cable showed no signs of fraying or broken strands.

A tong with new cable pre-installed is now in the hot cell for next time this job needs to be done. There is also another spare tong cable not installed in a tong located in the box of manipulator repair equipment located inside the hot cell.

Both manipulator slave ends were lubricated whilst inside.

  1323   Thursday, August 18, 2016, 10:35 Anders MjosConditioning StationRepair  VFD21 OL1 fault on Chiller

Anders Mjos wrote:

Anders Mjos wrote:

Plant Services group (Tony) will contact a service tech on Monday.

Water system will be switched off over the weekend.

Thursday, July 14, 2016, 13:24: Claus from Daikin is on site to troubleshoot.

The VFD driven fan motor has failed. Temporarily blocked air-flow through failed fan to improve air-flow to radiator. A new motor will be ordered (Curtis).

Thursday, July 14, 2016, 15:39: Stopped cooling system for the day


Friday, July 15, 2016, 08:16: Cooling system started

Friday, July 15, 2016, 15:00; Cooling system stopped.

 Thursday, August 18, 2016, 10:34: The motor was replaced today by Claus from Daikin. System is running normally again.

  1322   Tuesday, August 16, 2016, 12:35 David WangConditioning StationRepairTM3  CS vacuum pumps have been stopped

The TCS is venting now. The TM3 blue insulator replacement job will be started soon.