ID Date Author Category Type Module Target/Number Subject Text Attachments
  1329   Wednesday, August 24, 2016, 09:17 chad fisherSouth Hot-CellStandard OperationTM2 Ta#49Ta#49 has been installed on TM2 and tested.
All high current fasteners torqued to 130
in lbs.
  
  1328   Tuesday, August 23, 2016, 13:31 chad fisherSouth Hot-CellStandard OperationTM2SiC#33SiC#33 RemovedSiC#33 has been removed from TM2.   
  1327   Tuesday, August 23, 2016, 10:39 Travis CaveSouth Hot-CellStandard OperationTM2SiC#33module movedTM#3 with SiC#33 has been moved from the
west station to the south hot cell.
  
  1326   Tuesday, August 23, 2016, 08:05 chad fisherSouth Hot-CellMaintenance  Post Hot Cell Entry Clean-upPlastic has been removed from the floor
and any known active items in the hot cell
moved to the south east corner in an attempt
  
  1325   Thursday, August 18, 2016, 14:19 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 is now back in the the north east
silo.
  
  1324   Thursday, August 18, 2016, 13:57 chad fisherSouth Hot-CellMaintenance  Manipulator maitenanceSouth hot cell was entered to check to
replace cable if needed. Wrist cable showed
no signs of fraying or broken strands.
  
  1323   Thursday, August 18, 2016, 10:35 Anders MjosConditioning StationRepair  VFD21 OL1 fault on Chiller

    

       
            
  
  1322   Tuesday, August 16, 2016, 12:35 David WangConditioning StationRepairTM3  CS vacuum pumps have been stoppedThe TCS is venting now. The TM3 blue insulator
replacement job will be started soon.
  
  1321   Tuesday, August 16, 2016, 11:27 chad fisherSouth Hot-CellMaintenance  South Cell Field ReadingsField readings have been taken at the south
hot cell in preparation for entry into the
cell to fix manipulator.
  
  1320   Monday, August 15, 2016, 10:15 David WangConditioning StationStandard OperationTM4 Target Hall schedule for beam schedule 130 (Apr- Oct, 2016)Weekly update target hall schedule. Everything
on schedule are finished  on time.  
See attachment.  
 Target_Hall_shedule_130_Apr_to_Sep.pdfTarget_Hall_shedule_130_Apr_to_Sep.mpp 
  1319   Monday, August 15, 2016, 10:08 David WangITEStandard OperationTM4UC#175 Shielding blocks have been transferred from ITW to ITE.Dan and I transferred 5 shielding blocks
from ITW to ITE. The ITE is configured to
take proton beam.
  
  1318   Friday, August 12, 2016, 10:59 Anders MjosConditioning StationDevelopmentTM3 HV Test with Service Chase Panel removedWater cooling is performed manually with
CP1. RGA is ON since yesterday. EE is not
connected and in conditioning mode.
 TM3_HV_conditioning_2016-08-12.docxTCS-2016-08-11_TM3_Service_Chase_Panel_Removed.rga 
  1317   Friday, August 12, 2016, 09:58 chad fisherSouth Hot-CellMaintenance  Manipulator MaitenanceDisassembled the master side of the right
manipulator this morning to check the wrist
cable. The cable on the master side shows
  
  1316   Thursday, August 11, 2016, 10:37 David WangConditioning StationRepairTM3  TM3 service tray cover plate ITA2108 has been removed.Requested by Aurelia, and approved by Friedhelm,
TM3 service tray cover plate ITA2108 has
been remove out of the module. The plated
  
  1315   Wednesday, August 10, 2016, 14:38 Isaac EarleNorth Hot-CellDevelopment  North Hot Cell Ventilation Test ResultsTesting was performed on August 9th on
the ISAC nuclear ventilation system to determine
if the existing ventilation system can achieve
  
  1314   Wednesday, August 10, 2016, 12:18 chad fisherSouth Hot-CellMaintenance  Anteroom clearingBlack "radio active" materials
cabinet has been emptied, items bagged and
removed from the anteroom. Cabinet itself
  
  1313   Wednesday, August 10, 2016, 11:30 David WangITEStandard OperationTM4UC#17TM4 has been connected at ITEDan and I connected TM4 in ITE yesterday.
It is pumping down at ITE now. Everything
is fine so far.
  
  1312   Wednesday, August 10, 2016, 09:44 Travis CaveConditioning StationStandard OperationTM3no targetmodule movedTM#3 has been moved from the north east
silo to the conditioning station.
  
  1311   Tuesday, August 09, 2016, 11:36 Anders MjosConditioning StationMaintenance  RGA and CG1S moved The locations (ports) for the RGA
and CG1S was swapped today by Anders and
Isaac to provide clearance for the North
 Old.JPGNew.JPG 
  1310   Tuesday, August 09, 2016, 10:05 Travis CaveITEStandard OperationTM4UC#17module movedTM#4 with UC#17 is now in the east target
station.
  