1638
|
Tuesday, October 10, 2017, 10:38 |
David Wang | ITW | Standard Operation | | | 5 shielding blocks have been transferred from ITE to ITW . | ITW is configured to take proton beam. |
|
|
1661
|
Tuesday, November 14, 2017, 10:01 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#55 | Module move | TM#2 with Ta#55 has been moved from
the conditioning station to the west target
station. The field was measured on the access |
|
|
1662
|
Tuesday, November 14, 2017, 14:34 |
David Wang | ITW | Standard Operation | TM2 | Ta#55 | TM2 has been connected in ITW. | TM2 has been connected in ITW. All turbo-pumps
are started. Everything works fine. |
|
|
1670
|
Friday, December 22, 2017, 11:09 |
Anders Mjos | ITW | Standard Operation | TM2 | | Shut down High Active Cooling water | Stopped MP1 today in preparation for the
power outage over the holidays. both P-25
and P-26 breakers have been switched off |
|
|
1686
|
Tuesday, February 13, 2018, 13:56 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#55 | Target module disconnected | TM disconnected by David and Yasmine Feb
8th. One of the water couplings were leaking
for a short while when disconnected. NCR |
|
|
1687
|
Wednesday, February 14, 2018, 10:06 |
Anders Mjos | ITW | Maintenance | TM2 | | Replaced parker couplings on Window cooling line | By Anders & David. Couplings will be
taken apart for inspection. |
|
|
1688
|
Friday, February 16, 2018, 13:46 |
Anders Mjos | ITW | Maintenance | TM2 | | Parker coupling inspection | Findings and photos from the inspections
attached. The inspection was conducted by
Anders, David and Maico. |
|
|
1691
|
Tuesday, March 06, 2018, 09:53 |
David Wang | ITW | Standard Operation | TM2 | | Tm2 and Tm4 vacuum disconnection | The job is done. See attachment. |
|
|
1692
|
Wednesday, March 07, 2018, 10:18 |
David Wang | ITW | Standard Operation | | | Oil leak on target station vacuum primary back pump. | I can not see oil in sight window of the
primary pump during visual inspection. The
aluminum tray underneath the pump is filled |
|
|
1694
|
Thursday, March 08, 2018, 14:10 |
David Wang | ITW | Maintenance | | | Two small water leak has been found in ITW. | Two small water leaks have been found on
ITW High active water system. One is from
an unused 1/4" copper valve stem. another |
|
|
1696
|
Thursday, April 05, 2018, 11:29 |
David Wang | ITW | Maintenance | | | ITH MP1 replacement | ITH MP1 is replaced today with a new style
pump.The new pump is 0.75 inch higher than
old pump on inlet and exhaust so a new solid |
|
|
1697
|
Monday, April 09, 2018, 06:36 |
David Wang | ITW | Standard Operation | | | ITW Turbo -pumps switch off | I asked MCR to switch off ITW TP3,4 TP1s,2s
this morning. |
|
|
1701
|
Tuesday, April 17, 2018, 11:05 |
David Wang | ITW | Repair | | | Disconnect ITW entrance module | ITW entrance module has been disconnected.
All connections are labelled before or during
disconnection. The 24VDC electrical plug |
|
|
1702
|
Thursday, April 19, 2018, 10:27 |
Travis Cave | ITW | Maintenance | | | Entrance module move | The west entrance module has been
moved from the west target station to the
silo. |
|
|
1703
|
Friday, April 20, 2018, 15:33 |
Keith C Ng | ITW | Repair | | | ITW beam tube repair job | 2A2 window has been removed from ITW and
beamlines has removed the beamtube from the
penetration. The penetration has been sealed |
|
|
1704
|
Friday, April 27, 2018, 15:06 |
Keith C Ng | ITW | Repair | | | ITW beam tube repair | Vacuumed out remainder of debris from the
wall penetration, removed cradle and checked
condition. Down stream support bracket sees |
6x |
|
1705
|
Tuesday, May 01, 2018, 10:54 |
Keith C Ng | ITW | Repair | | | 2a2 window installation and beamtube repair | Yesterday
we installed the 2a2 window, the drive screw
was torqued until 70 ft-lbs and we stopped, |
|
|
1710
|
Friday, May 04, 2018, 11:21 |
David Wang | ITW | Repair | | | 2A2 winodw leak check in TH | Anders and I leak checked new 2A2 window
seal on ITW side. Leak detector was connected
to ITW TP4. Base leak rate 0.0Xe-9 |
|
|
1712
|
Wednesday, May 09, 2018, 08:48 |
David Wang | ITW | Repair | | | 2A2 winodw leak check on ITW vacuum vessel. | Leak detector is connected to ITW TP4.
LD Base leak rate 0.0XE-09 atm.cc/sec. Helium
line is connected to existing window leak |
|
|
1716
|
Thursday, May 17, 2018, 13:17 |
Travis Cave | ITW | Standard Operation | | | Entrance module move | The west entrance module has been
moved from the silo to the west target station. |
|