  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1370   Wednesday, October 12, 2016, 10:00 David WangITWStandard OperationTM2 TM2 was disconnected at ITWTM2 was disconnected at ITW. 3 water circuits
in ITW gave been looped to keep 75 GPM water
flow to ITW. HS line was purged at HS. RPG
  
  1383   Tuesday, October 25, 2016, 15:10 David WangITWStandard OperationTM2 TM2 has been connected at ITWAll turbo pumps are started. Two gas valves
for Febiad run are opened. Pumping down is
good so far.
  
  1410   Tuesday, November 29, 2016, 12:57 David WangITWStandard OperationTM2 TM2 is connected in ITWAll turbo pumps are started. Water system
and water signals have been checked. Pumping
down on ITW and TM2 is good so far.
  
  1411   Tuesday, November 29, 2016, 14:50 Travis CaveITWStandard OperationTM2UC#18module movedTM#2 with UC#18 has been moved to ITW from
the conditioning station.
  
  1413   Saturday, December 03, 2016, 10:01 David WangITWRepairTM2 venting ITW and TM2 with argon.A short between TM2 EE and bias is produced
yesterday during tube heater ramp up. 
Alex asked for an argon venting on ITW to
  
  1415   Monday, December 05, 2016, 10:10 David WangITWStandard OperationTM2 Five shielding blocks have been transferred from ITE to ITW. The ITW is configured to take proton beam.   
  1419   Thursday, January 12, 2017, 14:24 David WangITWStandard OperationTM2 ITW primary and secondary vacuum vessel winter shut down leak check.TM2 is located in ITW for this leak check.
Leak detector is installed between ITW BV2s
as before. LD base leak rate 0.0XE-9atm.cc/sec,
  
  1420   Monday, January 16, 2017, 09:32 David WangITWStandard OperationTM2 Helium pressure test on TM2 water llines at ITWTM2 helium pressure test result at ITW.
70 psi helium 3 minutes on each circuit.
LD base LR0.0XE-9atm.cc/sec  BP 0.0XE-4torr. 
  
  1427   Tuesday, January 24, 2017, 15:32 David WangITWStandard OperationTM2 TM2 was moved from ITW to SHC this morning.The move is smooth. Yasmine and Travis
did the move.
  
  1434   Tuesday, February 07, 2017, 10:34 David WangITWMaintenance  ITW clean upITW has been cleaned up today.  All
station are vacuum cleaned. I wiped all HV
cover and HV area including conductors and
  
  1445   Tuesday, March 07, 2017, 09:25 David WangITWRepair  ITW HALCW 2" return line ball valve seals replacement.Leaking seals on ITW HALCW 2" return
line ball valve have been replaced. 8 liter
waters are drained out for this job. Water
  
  1505   Wednesday, April 26, 2017, 10:24 David WangITWStandard OperationTM2 TM2 ITWTM2 was moved and connected in ITW yesterday
afternoon. After roughing down, ITW turbo
pumps are started. ITW TP4 can not be started
  
  1549   Wednesday, May 24, 2017, 08:11 David WangITWStandard OperationTM2 TH schedule 132 update weeklySee attachments.  Target_Hall_shedule_132_Apr_to_Sep.mppTarget_Hall_shedule_132_Apr_to_Sep.pdf 
  1557   Tuesday, June 13, 2017, 09:57 Travis CaveITWStandard OperationTM2SiC#36module movedTM#2 with SiC#36 has been moved from the
conditioning station to the west target station.
  
  1559   Tuesday, June 13, 2017, 13:41 David WangITWStandard OperationTM2 TM2 has been connected in ITW.Yasmine and I connected TM2 in ITW today.
the control page is set to febiad mode. Both
gas line in ITW are opened for febiad run.
  
  1590   Wednesday, August 02, 2017, 15:09 David WangITWStandard OperationTM2 TM2 was disconnencted in ITW yesterday.Tm2 was disconnected in ITW yesterday.
ITW EL cable crimp ring was broken. John
Chow replaced this ring this afternoon.
  
  1595   Tuesday, August 08, 2017, 13:26 Travis CaveITWStandard OperationTM2Ta#53module movedTM#2 with Ta#53 has been moved from the
conditioning station to the west target station.
  
  1598   Tuesday, August 15, 2017, 09:30 Anders MjosITWStandard OperationTM2Ta#53TM2 radiation fields

    

       
            
  
  1633   Tuesday, October 03, 2017, 09:29 Travis CaveITWStandard OperationTM2Ta#54Module move TM#2 with Ta#54 has been moved from
the conditioning station to the west target
station.
  
  1634   Thursday, October 05, 2017, 11:04 Anders MjosITWMaintenance  Installation of new valve for module move ventilationDavid installed the new ball valve and
connections for the SAS project module move
ventilation. SASP0482. Drawing reference
  