1370
|
Wednesday, October 12, 2016, 10:00 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnected at ITW | TM2 was disconnected at ITW. 3 water circuits
in ITW gave been looped to keep 75 GPM water
flow to ITW. HS line was purged at HS. RPG |
|
|
1383
|
Tuesday, October 25, 2016, 15:10 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected at ITW | All turbo pumps are started. Two gas valves
for Febiad run are opened. Pumping down is
good so far. |
|
|
1410
|
Tuesday, November 29, 2016, 12:57 |
David Wang | ITW | Standard Operation | TM2 | | TM2 is connected in ITW | All turbo pumps are started. Water system
and water signals have been checked. Pumping
down on ITW and TM2 is good so far. |
|
|
1411
|
Tuesday, November 29, 2016, 14:50 |
Travis Cave | ITW | Standard Operation | TM2 | UC#18 | module moved | TM#2 with UC#18 has been moved to ITW from
the conditioning station. |
|
|
1413
|
Saturday, December 03, 2016, 10:01 |
David Wang | ITW | Repair | TM2 | | venting ITW and TM2 with argon. | A short between TM2 EE and bias is produced
yesterday during tube heater ramp up.
Alex asked for an argon venting on ITW to |
|
|
1415
|
Monday, December 05, 2016, 10:10 |
David Wang | ITW | Standard Operation | TM2 | | Five shielding blocks have been transferred from ITE to ITW. | The ITW is configured to take proton beam. |
|
|
1419
|
Thursday, January 12, 2017, 14:24 |
David Wang | ITW | Standard Operation | TM2 | | ITW primary and secondary vacuum vessel winter shut down leak check. | TM2 is located in ITW for this leak check.
Leak detector is installed between ITW BV2s
as before. LD base leak rate 0.0XE-9atm.cc/sec, |
|
|
1420
|
Monday, January 16, 2017, 09:32 |
David Wang | ITW | Standard Operation | TM2 | | Helium pressure test on TM2 water llines at ITW | TM2 helium pressure test result at ITW.
70 psi helium 3 minutes on each circuit.
LD base LR0.0XE-9atm.cc/sec BP 0.0XE-4torr. |
|
|
1427
|
Tuesday, January 24, 2017, 15:32 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was moved from ITW to SHC this morning. | The move is smooth. Yasmine and Travis
did the move. |
|
|
1434
|
Tuesday, February 07, 2017, 10:34 |
David Wang | ITW | Maintenance | | | ITW clean up | ITW has been cleaned up today. All
station are vacuum cleaned. I wiped all HV
cover and HV area including conductors and |
|
|
1445
|
Tuesday, March 07, 2017, 09:25 |
David Wang | ITW | Repair | | | ITW HALCW 2" return line ball valve seals replacement. | Leaking seals on ITW HALCW 2" return
line ball valve have been replaced. 8 liter
waters are drained out for this job. Water |
|
|
1505
|
Wednesday, April 26, 2017, 10:24 |
David Wang | ITW | Standard Operation | TM2 | | TM2 ITW | TM2 was moved and connected in ITW yesterday
afternoon. After roughing down, ITW turbo
pumps are started. ITW TP4 can not be started |
|
|
1549
|
Wednesday, May 24, 2017, 08:11 |
David Wang | ITW | Standard Operation | TM2 | | TH schedule 132 update weekly | See attachments. |
|
|
1557
|
Tuesday, June 13, 2017, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#36 | module moved | TM#2 with SiC#36 has been moved from the
conditioning station to the west target station. |
|
|
1559
|
Tuesday, June 13, 2017, 13:41 |
David Wang | ITW | Standard Operation | TM2 | | TM2 has been connected in ITW. | Yasmine and I connected TM2 in ITW today.
the control page is set to febiad mode. Both
gas line in ITW are opened for febiad run. |
|
|
1590
|
Wednesday, August 02, 2017, 15:09 |
David Wang | ITW | Standard Operation | TM2 | | TM2 was disconnencted in ITW yesterday. | Tm2 was disconnected in ITW yesterday.
ITW EL cable crimp ring was broken. John
Chow replaced this ring this afternoon. |
|
|
1595
|
Tuesday, August 08, 2017, 13:26 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#53 | module moved | TM#2 with Ta#53 has been moved from the
conditioning station to the west target station. |
|
|
1598
|
Tuesday, August 15, 2017, 09:30 |
Anders Mjos | ITW | Standard Operation | TM2 | Ta#53 | TM2 radiation fields |
|
|
|
1633
|
Tuesday, October 03, 2017, 09:29 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#54 | Module move | TM#2 with Ta#54 has been moved from
the conditioning station to the west target
station. |
|
|
1634
|
Thursday, October 05, 2017, 11:04 |
Anders Mjos | ITW | Maintenance | | | Installation of new valve for module move ventilation | David installed the new ball valve and
connections for the SAS project module move
ventilation. SASP0482. Drawing reference |
|