2670
|
Monday, August 26, 2024, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#10 | Spent Target Move | Nb#10 was placed in pail#295 and
moved from the south hot cell to the spent
target vault, spot 4A, it was 230uSv/hr when |
|
2707
|
Tuesday, October 15, 2024, 13:44 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#8 and Ta#67 | Spent Target Move | On Friday October 11th TiC#8 and
Ta#67 were place in the spent target vault
in Tray 8. See attached PDF for details. |
|
2714
|
Friday, November 08, 2024, 10:39 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#9 | Spent Target Move | TiC#9 was placed in Pail 299 in spot
8A of the vault and was 92.1mSv/hr when removed
from the south hot cell. See attached pdf |
|
2746
|
Monday, January 13, 2025, 10:02 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#46 | Spent Target Move | UC#46 was placed in pail# 301 in spot 1B and
was 26.3mSv/hr when removed from the SHC.
See attached PDF for vault
|
|
2749
|
Thursday, January 16, 2025, 10:03 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#47 | Spent Target Move | The spent UC#47 was moved from the
south hot cell to the spent target vault
placed in pail #302 in spot 1C of the vault, |
|
1029
|
Thursday, August 06, 2015, 10:26 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Measurments and Assays | All targets but one ( SiC#31 went in last
week) have been measured or assayed. See
attached PDF for the details. |
|
49
|
Thursday, November 10, 2011, 14:33 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay | For the week of November 7th 2011, four
of a possible ten targets that are in storage
were assayed. Targets are as follows: |
|
64
|
Thursday, December 15, 2011, 13:08 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay | Spent target assay completed. A total of
16 target were looked at, 13 were low enough
to be assayed and those 13 are at shippable |
|
382
|
Thursday, June 20, 2013, 13:47 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target Assay | Ten targets have been assayed or had field
measurements(they were too hot to ship but
were assayed the last time an assay was done) |
|
1690
|
Monday, March 05, 2018, 13:47 |
Travis Cave | Spent Target Vault | Repair | | Many | Spent Target Assay | The spent target assay was aborted
today after the first target was finished
due to the very old computer that controls |
|
1695
|
Friday, March 23, 2018, 09:34 |
Travis Cave | Spent Target Vault | Standard Operation | | Many | Spent Target Assay | All targets in the ISAC Spent Target
Vault have been either assayed and had field
measurement done on them or just measurement |
|
364
|
Monday, May 27, 2013, 11:55 |
chad fisher | South Hot-Cell | Standard Operation | | | Special Tooling for RFQ target | The special tool made for the RFQ target
autopsy has been inserted into the hot cell.
|
|
2422
|
Monday, March 06, 2023, 11:31 |
Adam Newsome | North Hot-Cell | Repair | | | Spare Telemanipulator: Y-Motion Linear Actuator Repair | The linear actuator used for the Y-motion
motor assistance on the spare telemanipulator
was replaced and tested. It was observed |
|
2423
|
Tuesday, March 07, 2023, 10:37 |
chad fisher | North Hot-Cell | Repair | | | Spare Telemanipulator: Y-Motion Linear Actuator Repair |
|
|
2679
|
Wednesday, September 11, 2024, 13:38 |
Adam Newsome | North Hot-Cell | Repair | | | Spare Manipulator - Y-axis motion not functioning | Update 2024-09-12:
C. Fisher confirms this is actually normal
behaviour. The Y-axis motion is inhibited |
|
148
|
Wednesday, July 18, 2012, 16:49 |
Grant Minor | South Hot-Cell | Development | | | South Hot Cell Ventilation Alarm Trip | Today (Wednesday July 18th) at around 4:15
pm I was taking a small tour group from
VECC into the Target Hall. In the process |
|
149
|
Wednesday, July 18, 2012, 16:49 |
Grant Minor | South Hot-Cell | Development | | | South Hot Cell Ventilation Alarm Trip | Today (Wednesday July 18th) at around 4:15
pm I was taking a small tour group from
VECC into the Target Hall. In the process |
|
1746
|
Friday, June 29, 2018, 10:27 |
chad fisher | South Hot-Cell | Maintenance | | | South Hot Cell Filter Change | At the end of manipulator repair Thursday
the ventilation pre-filter in the hot cell
was changed. Old filter remains in the hot |
|
1451
|
Wednesday, March 15, 2017, 07:45 |
chad fisher | South Hot-Cell | Maintenance | | | South Hot Cell Fields | I have moved the suspected "hot"
items in the hot cell and placed them under
some lead bricks. I have re-measured the |
|
1742
|
Tuesday, June 26, 2018, 08:56 |
chad fisher | South Hot-Cell | Standard Operation | | | South Hot Cell Fields | hot items have been moved and shielded
as much as possible. Field at left manipulator
has been reduced from 560 uSv/h to 85 uSv/h. |
|