Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 68 of 136  Not logged in ELOG logo
Entry  Tuesday, November 29, 2016, 12:57, David Wang, ITW, Standard Operation, TM2, , TM2 is connected in ITW 

All turbo pumps are started. Water system and water signals have been checked. Pumping down on ITW and TM2 is good so far.

Entry  Tuesday, November 29, 2016, 07:50, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 is disconnected at TCS. 

Argon venting is done.

Entry  Tuesday, November 29, 2016, 06:27, David Wang, Conditioning Station, Standard Operation, TM2, , TCS water pumps are stopped 

Argon venting on TCS and TM2 is processing

Entry  Friday, November 25, 2016, 09:04, Travis Cave, Spent Target Vault, Standard Operation, , SiC#35, Spent Target move Vault_Storage_November_24_2016.pdf

On November 24th 2016 the spent SiC#35 was moved from the south hot cell to the spent target vault. see attached pdf for details.

Entry  Thursday, November 24, 2016, 10:30, David Wang, Conditioning Station, Standard Operation, TM2, , HV cover is installed on TM2 at TCS 

Interlock key  are returned back to B2 level.TM2 is ready for HV conditioning and heating up at TCS.

Entry  Thursday, November 24, 2016, 09:33, Anders Mjos, Conditioning Station, Standard Operation, TM2, UC#18, Conditioning UC#18 

Thursday, November 24, 2016, 09:33: Water package on

Thursday, November 24, 2016, 09:43: TCS:WPV1 shows only 12% open. A visual inspection confirms the valve is fully opened. Controls will be contacted to troubleshoot

 

Entry  Wednesday, November 23, 2016, 16:21, David Wang, Conditioning Station, Standard Operation, TM2, , TM2 and TCS vacuum system has been connected. 

All vacuum pumps have been started. Air ballast 50seconds on roughing pump. Everything is good  so far.

Entry  Wednesday, November 23, 2016, 16:10, David Wang, South Hot-Cell, Standard Operation, TM2, , SHC, TM2 leak check on HS line. 

Chad and I leak checked TM2 HS line with new UCx target installed. Helium spray  2 seconds on each joint and 10seconds flushing around target in SHC. LD base LR: 0.0XE-9atm.cc/sec, base pressure:0.0XE-4 torr. No response has been found on LD during check. The line is leak free.

Entry  Wednesday, November 23, 2016, 14:25, Travis Cave, South Hot-Cell, Standard Operation, TM2, UC#18, Electrical Check TM2_elechk_UC18_SHC.PDF

Results of TM#2 with UC#18 electrical at the south hot cell. See attached PDF for details.

Entry  Wednesday, November 23, 2016, 14:21, Travis Cave, Conditioning Station, Standard Operation, TM2, UC#18, module moved 

TM#2 with UC#18 has been moved from the south hot cell to the conditioning station.

Entry  Tuesday, November 22, 2016, 14:26, David Wang, Conditioning Station, Standard Operation, , , TCS vacuum pumps are switched off 

TCS will be vented tomorrow morning for TM2 moving.

Entry  Tuesday, November 22, 2016, 11:56, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#35, Electrical Check TM2_elechk_SiC35_postbeam.PDF

Electrical check of TM#2 with the SiC#35  post beam run. See attached PDF for details.

Entry  Tuesday, November 22, 2016, 10:45, Travis Cave, South Hot-Cell, Standard Operation, TM2, SiC#35, module moved 

TM#2 with the old SiC #35 has been moved from ITW to the south hot cell.

Entry  Tuesday, November 15, 2016, 07:53, David Wang, Conditioning Station, Standard Operation, TM4, , Target Hall schedule for beam schedule 131(Sep-Dec, 2016) Target_Hall_shedule_131_Sep_to_Dec.pdfTarget_Hall_shedule_131_Sep_to_Dec.mppTarget_Hall_shedule_131__Sep_to_Dec_2016.pdf

Update TH schedules . See attachments

Entry  Tuesday, November 08, 2016, 14:45, David Wang, ITE, Maintenance, TM4, , TM4 has been moved to ITE and connected there. 

All ITE and TM4  turbo pumps are started. The east station pumping down is good so far.

Entry  Tuesday, November 08, 2016, 14:04, Isaac Earle, North Hot-Cell, Development, , , Interference check with TCS turbo pump and proposed NHC duct routing IMG_7577.JPGIMG_7583.JPGIMG_7582.JPG

David Wang and I accessed the NHC today to check if the proposed duct routing (IRH1618) will interfere with servicing or replacement of the TCS turbo pump.  A piece of plywood was placed in the future position of the NHC/TCS partition wall (IRH1609), and a ducting elbow was placed at the approximate position of the nearest elbow to the turbo pump.

David concluded that the ducting in the proposed location will not have any significant effect on replacement of the turbo pump, and he does not expect replacement will be difficult to perform after installation of the wall and NHC ducting.  Standing at floor level towards the east side of the TCS space and reaching upwards seemed to be the best way to reach the turbo pump flange bolts.  It was also noted that there was sufficient room in the TCS space for two workers to be in the area.

 

IMG_7577.JPG

 

IMG_7583.JPG

 

IMG_7582.JPG

Entry  Tuesday, November 08, 2016, 10:23, Travis Cave, ITE, Standard Operation, TM4, Ta#50, module moved 

TM#4 with Ta#50 has been moved to the east target station.

Entry  Tuesday, November 08, 2016, 07:47, David Wang, Conditioning Station, Standard Operation, TM4, , TCS water and vacuum pumps are switched off 

TCS is vented. TM4 is disconnected and TCS.

Entry  Monday, November 07, 2016, 10:35, Travis Cave, Spent Target Vault, Standard Operation, , SiC#34, Spent Target move Vault_Storage_November_3_2016.pdf

Spent SiC#34 was moved on the 3rd of November and  placed in the spent target vault. See attached pdf for details.

Entry  Thursday, November 03, 2016, 09:01, David Wang, Conditioning Station, Standard Operation, TM4, , TCS water system has been started for TM4. 

The system works fine. All water signals to TM4 at TCS are normal. HV cover is installed on to TM4 at TCS.

ELOG V2.9.2-2455