159
|
Tuesday, August 07, 2012, 14:06 |
David Wang | ITW | Repair | | | ITW TP4S has been replaced |
Normal
0
|
|
162
|
Tuesday, August 14, 2012, 14:27 |
David Wang | ITW | Standard Operation | TM1 | UCx | TM1connection in ITW | Connected TM1 in ITW,started 6 turbo pumps,
and finished TM1 water interlock check .
Every thing is good so far. |
|
163
|
Monday, August 20, 2012, 12:28 |
David Wang | ITW | Standard Operation | TM1 | | I moved 5 shielding blocks from ITE to ITW, | I moved 5 shielding blocks from ITE
to ITW.ITW is configured to take proton beam
now. |
|
164
|
Thursday, August 23, 2012, 07:34 |
David Wang | ITW | Repair | | | Replaced broken air lines on ITW HARP5B cylinder. | Prob guys replaced broken air lines on
ITW HARP 5B Cylinder.Several shielding blocks
had been moved out to make the cylinder accessible. |
|
165
|
Thursday, August 30, 2012, 13:57 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | I disconnected TM 4 in ITE on AUG 29th
morning.The vacuum lines stay untouched and
they will be disconnected on SEP 04th. |
|
168
|
Tuesday, September 04, 2012, 14:34 |
David Wang | South Hot-Cell | Standard Operation | TM4 | NiO #1 | TM4 heat shield circuit leak check with NiO#1 target | Chad and i did a leak check on TM4 heat
shield circuit with new NiO#1 target installed.
It took about 40 mins(much longer than usual) |
|
172
|
Friday, September 07, 2012, 08:54 |
David Wang | Conditioning Station | Standard Operation | TM4 | NiO #1 | TM4 NiO #1 target heat shield helium pressure check is done. | leak detector pumped down to 0.0xE-9 atm.cc/sec,
and 0.0xE-4 torr. All high vacuum gauge readings
at CS and TM4 are at low -6 range from 2.2xE-6torr |
|
175
|
Wednesday, September 12, 2012, 07:00 |
David Wang | ITE | Standard Operation | TM4 | NiO #1 | ITM4 in ITE connected and pumping down | TM4 had been connected in ITE. Six turbo
pump had been started . thepumpming diwn
is very good so far. The water interlock |
|
176
|
Wednesday, September 12, 2012, 11:59 |
David Wang | ITW | Standard Operation | TM1 | UCx | TM1 disconnected in ITW | I removed 5 shielding blocks from ITW to
block storage area, and disconnected TM1
in ITW. After UCx run, the radioactive |
|
181
|
Tuesday, September 18, 2012, 13:41 |
David Wang | South Hot-Cell | Standard Operation | TM1 | Nb#7 | leak check heat shield circuit | Chad and i did a leak check on TM1 heat
shield circuit with new Nb#7 target installed.
It took about 5 mins pump down the circuit |
|
186
|
Thursday, September 20, 2012, 09:16 |
David Wang | Conditioning Station | Standard Operation | TM1 | Nb#7 | TM1 Nb#7 target heat shield helium pressure check is done. | Leak detector pumped down to base LR1.3xE-9
atm.cc/sec, and BP 8xE-3 torr. All high
vacuum gauge readings at CS and TM1 are at |
|
188
|
Tuesday, September 25, 2012, 14:33 |
David Wang | ITW | Standard Operation | TM1 | Nb#7 | TM1connected in ITW | TM 1 is in ITW now. All connections are
done. The turbo pumps had been started this
afternoon. The vacuum looks good so far. |
|
189
|
Thursday, September 27, 2012, 09:13 |
David Wang | ITE | Repair | TM4 | | ITE MSP water circuit flow wheel had been replaced | ITE MSP water circuit flow wheel was replaced
yesterday due to poor performance. |
|
190
|
Tuesday, October 02, 2012, 11:47 |
David Wang | ITW | Standard Operation | TM1 | Nb#7 | I moved 5 shielding blocks from ITE to ITW. | 5 shielding blocks have been moved from
ITE to ITW. ITW is configured to take proton
beam now. |
|
191
|
Thursday, October 04, 2012, 11:06 |
David Wang | Conditioning Station | Repair | | | Replace conditioning station scroll pump in target hall | Grant and I replaced the conditioning station
broken srcoll pump with a refurbished
scroll pump which is supplied by vacuum group. |
|
192
|
Tuesday, October 09, 2012, 10:35 |
David Wang | ITE | Standard Operation | TM4 | NiO #1 | Disconnected TM4 in ITE. | I disconnected TM4 in ITE this morning.
The heat shield circuit has been purged with
air. |
|
196
|
Tuesday, October 16, 2012, 07:14 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCX#5 | TM4 heat shield helium pressure test and electrical check at CS | TM4 heat shield helium pressure test and
electrical check were done at CS
last week. The results are good. NO leak |
|
199
|
Wednesday, October 31, 2012, 11:24 |
David Wang | ITE | Standard Operation | TM4 | | Transfer five shielding blocks from ITW to ITE. | Bevan and I transferred five shielding
blocks from ITW to ITE. ITE is ready for
taking proton beam. |
|
204
|
Tuesday, November 06, 2012, 12:08 |
David Wang | ITW | Standard Operation | TM1 | Nb#7 | TM1 disconnected in ITW | Bevan and I disconnected TM1 in ITW this
morning. The TM1 was moved to south hot cell
later. |
|
208
|
Wednesday, November 07, 2012, 11:09 |
David Wang | South Hot-Cell | Standard Operation | TM1 | TiC | TM1 heat shield circuit leak check with TiC target at hot cell | Chad and i did a leak check on TM1(Lp-TiC)
heat shield water circuit at south hot cell.
There is no leak had been found on it. The |
|