  ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  1331   Wednesday, August 24, 2016, 10:41 David WangITWStandard OperationTM2 TM2 was disconnected in ITW yesterday.TM2 was disconnected in ITW yesterday and
moved to SHC.
  
  1332   Wednesday, August 24, 2016, 10:44 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.Chad and I leak checked Tm2 Hs line with
new target installed. Base LR 0.0Xe-9 atm.cc/sec.  
No leak has been found. This line will be
  
  1333   Wednesday, August 24, 2016, 10:45 David WangConditioning StationStandard OperationTM2 TM2 vacuum system has been connected at TCSStart of roughing now.   
  1334   Wednesday, August 24, 2016, 11:06 Travis CaveSouth Hot-CellStandard OperationTM2Ta#49module moved and electrical checkTM#2 with Ta#49 has had its electrical
check and was moved to the conditioning station.
see the attached pdf for the electrical check
 TM2_elechk_SiC34_SHC.PDF 
  1336   Wednesday, August 24, 2016, 14:42 Anders MjosConditioning StationStandard OperationTM2Ta#49ConditioningWednesday, August 24, 2016, 14:42: RGA
on
Wednesday, August 24, 2016, 20:27:
 TCS-2016-08-24_Ta#49.rgaTa#49.docx 
  1337   Thursday, August 25, 2016, 08:36 David WangConditioning StationStandard OperationTM2 Helium pressure test on TM2 HS water lline I did a helium pressure test on TM2 HS
water line at TCS. Leak detector base leak
rate only could get to 1.8x e-8 atm.cc/sec
  
  1338   Thursday, August 25, 2016, 08:43 David WangConditioning StationStandard OperationTM2 All TM2 connections to TCS are done.The HV cover is installed. The Faraday
cage at B2 level is locked also.The TCS and
TM2 are still pumping down. Everything is
  
  1341   Monday, August 29, 2016, 13:34 David WangConditioning StationStandard OperationTM2 TM2 has been disconnected at TCSI stopped TCS water pumps and vacuum pumps
also.   TM2 and TCS will be vented tomorrow
morning.
  
  1342   Tuesday, August 30, 2016, 10:35 Travis CaveITWStandard OperationTM2Ta#49module movedTM#2 with Ta#49 has been moved to the west
target station from the conditioning station.
  
  1343   Tuesday, August 30, 2016, 13:17 David WangITWStandard OperationTM2 TM2 has been connected at ITW  ITW turbo pumps  have been
started.
  
  1344   Tuesday, September 06, 2016, 10:05 David WangITWStandard OperationTM2 5 Shielding blocks have been transferred from ITE to ITW.5shielding blocks have been transferred
from ITE to ITE. ITW is configured to take
proton beam.
  
  1369   Tuesday, October 11, 2016, 10:36 Travis CaveITWStandard OperationTM2Ta#49module movedTM#2 with Ta#49 has been moved from the
west target station to the south hot cell.
  
  1370   Wednesday, October 12, 2016, 10:00 David WangITWStandard OperationTM2 TM2 was disconnected at ITWTM2 was disconnected at ITW. 3 water circuits
in ITW gave been looped to keep 75 GPM water
flow to ITW. HS line was purged at HS. RPG
  
  1372   Wednesday, October 19, 2016, 11:46 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule movedTM#2 has been moved from the south hot
cell to the south west silo.
  
  1376   Friday, October 21, 2016, 15:10 Anders MjosSouth Hot-CellRepairTM2Ta#49Stuck TGHT clamp bolt removalDuring target removal on Wednesday October
12th, the left target heater conductor bolt
(ITD0058) could not be removed. The bolt
  
  1378   Monday, October 24, 2016, 11:34 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule movedTM#2 has been moved from the south west
silo to the south hot cell.
  
  1380   Monday, October 24, 2016, 14:44 chad fisherSouth Hot-CellStandard OperationTM2SiC#35SiC#35 installedSic#35 has been installed onto TM2. High
current fasteners torqued to 130 in lbs.
Mating of the 9 pin connector was
 20161024_141155.jpg 
  1381   Monday, October 24, 2016, 14:54 David WangSouth Hot-CellStandard OperationTM2 SHC, TM2 leak check on HS line.Chad and I did the leak check on TM2 heat
shield line. LD base leak rate:0.0xE-9atm.cc/sec.
Base pressure:0.0X E-9 torr. The line is
  
  1382   Monday, October 24, 2016, 14:56 Travis CaveSouth Hot-CellStandard OperationTM2SiC#35Electrical ChecksResults of the electrical check of TM#2
with no target after the repair and with
the SiC#35 mounted on the module.
 TM2_elechk_notgt_SHC_repair.PDFTM2_elechk_SiC35_SHC.PDF 
  1383   Tuesday, October 25, 2016, 15:10 David WangITWStandard OperationTM2 TM2 has been connected at ITWAll turbo pumps are started. Two gas valves
for Febiad run are opened. Pumping down is
good so far.
  