991
|
Friday, July 10, 2015, 09:33 |
chad fisher | South Hot-Cell | Repair | TM2 | | Coil Line Decon | Coil line has been in RPG's ultrasonic
decon over night. Initial swipes this morning
picked up 5000 counts. It has been decontaminated |
|
994
|
Tuesday, July 14, 2015, 08:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved | TM#2, no target, has been moved from the
north east silo to the south hot cell. |
|
995
|
Tuesday, July 14, 2015, 12:56 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box removed | Containment box was removed from Tm2 this
morning in preparation for installation
of coil line and all the trimmings. |
|
996
|
Wednesday, July 15, 2015, 09:44 |
chad fisher | South Hot-Cell | Repair | TM2 | | Coil Line replacement | water block jig installed, module side
sealing surfaces re-polished and cleaned.
Coil line inserted into the hot cell and |
 |
997
|
Wednesday, July 15, 2015, 11:02 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Coil Line Vacuum Leak Check | TM2 coil line R,U has been vacuum leaked
check at the hot cell and has passed with
no response from the leak detector. |
|
998
|
Wednesday, July 15, 2015, 11:18 |
David Wang | South Hot-Cell | Repair | TM2 | | leak check coil line(R,U) on TM2 at SHC | Chad and I leak checked the coil 1 circuit(R,U)
after rebuilt coil line is installed on TM2
source tray. The pumping down on the circuit |
 |
1000
|
Thursday, July 16, 2015, 14:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | IMG gauge, clip for ground to window lines
and gas line extensions were installed today.
David and I also tried to locate |
 |
1001
|
Friday, July 17, 2015, 13:51 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | Gas lines extensions installed yesterday
were too long and gas lines touched top inside
of containment box. They have been removed |
|
1002
|
Monday, July 20, 2015, 14:12 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | Ultem high voltage spacer installed and
9 pin banana plug plugged in. Target has
been inserted into the hot cell and will |
  |
1003
|
Monday, July 20, 2015, 17:11 |
Grant Minor | South Hot-Cell | Repair | TM2 | | TM2 New Source Tray - additional photos 20 July 2015 | A few additional higher-resolution photos
of the TM2 source tray with new spacer ITA6270,
and bent copper ground line clip. |
  |
1004
|
Tuesday, July 21, 2015, 09:21 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check Failed | TM#2 has failed the electrical check see
attached pdf for details. |
|
1005
|
Tuesday, July 21, 2015, 10:40 |
Grant Minor | Assembly/Bench Test | Repair | TM2 | | TM2 - bench inspection photos from 6-June-2015 | |
  |
1008
|
Wednesday, July 22, 2015, 11:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Electrical Check | Electrical check done on TM#2 around the
25th of June 2015, this was before the coil
line leak was found. |
|
1009
|
Wednesday, July 22, 2015, 12:13 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Short Findings | Pin X was unplugged, short remained, however
any slight pressure on the block towards
the source tray makes the short go away. |
|
1012
|
Friday, July 24, 2015, 14:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved | TM#2 has been moved from the south hot
cell to north east silo. |
|
1030
|
Thursday, August 06, 2015, 11:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved | TM#2 is now in the south hot cell |
|
1032
|
Monday, August 10, 2015, 14:07 |
Isaac Earle | South Hot-Cell | Repair | TM2 | | TM2 Containment Box Removed | The containment box was taken off TM2 in
preparation for installation of a new coil
line isolator. |
|
1033
|
Thursday, August 13, 2015, 09:17 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 status | Tuesday, August 11, insulator ITA6272
was installed onto the "pin x"
line (unused plasma electrode) and tested; |
  |
1034
|
Thursday, August 13, 2015, 11:34 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Dummy Target | Electrical Check | Electrical check of TM2 without target
after that widget has installed, electrical
check with the shunts on, electrical check |
  |
1035
|
Thursday, August 13, 2015, 13:46 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | As previously mentioned, dump target installed
with new mounting and high current fasteners.
Leak Check complete and ready to |
|