ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1269   Tuesday, June 28, 2016, 14:42 Travis CaveSpent Target VaultStandard Operation ManySpent target assay.The spent target assay were finally started
or re-started today. Four targets were done
today.
 Vault_Storage_June_30_2016.pdfMini_Vault_Storage_June_30_2015.pdf 
  1270   Thursday, June 30, 2016, 13:33 Dan McDonaldSpent Target VaultMaintenance  F308'sThe five spent target F308  flasks
where gone through in accordance with Nordion
guidelines, the sixth spare is remains in
  
  1280   Monday, July 11, 2016, 10:59 Travis CaveSpent Target VaultStandard Operation Ta#48Spent Target moveThe spent Ta#48 was moved from the south
hot cell to the spent target vault. I was
placed in pail 139 and is in spot 6C in the
 Vault_Storage_July_11_2016.pdf 
  1305   Thursday, August 04, 2016, 08:56 Travis CaveSpent Target VaultStandard Operation UC#16Spent Target moveThe spent UC #16 have been moved from the
south hot cell to the storage vault see attached
PDF for details.
 Vault_Storage_August_3_2016.pdf 
  1340   Thursday, August 25, 2016, 14:25 Travis CaveSpent Target VaultStandard Operation SiC#33Spent Target moveSiC#33 was placed into pail #141 which
in turn was placed into slot 2B of the vault.
I was 295mS/hr upon removal from the south
 Vault_Storage_August_25_2016.pdf 
  1362   Monday, September 26, 2016, 13:59 Travis CaveSpent Target VaultStandard Operation UC#17Spent Target moveThe spent UC#17 has been moved from the
south hot cell to the spent target vault.
See the attached pdf for details.
 Vault_Storage_September_26_2016.pdf 
  1373   Thursday, October 20, 2016, 10:45 Travis CaveSpent Target VaultStandard Operation Ta#49Spent Target moveTa#49 has been removed from the south hot
cell and placed in the storage vault. It
is in pail 146 and in spot 6A.
  
  1392   Monday, November 07, 2016, 10:35 Travis CaveSpent Target VaultStandard Operation SiC#34Spent Target moveSpent SiC#34 was moved on the 3rd of November
and  placed in the spent target vault.
See attached pdf for details.
 Vault_Storage_November_3_2016.pdf 
  1407   Friday, November 25, 2016, 09:04 Travis CaveSpent Target VaultStandard Operation SiC#35Spent Target moveOn November 24th 2016 the spent SiC#35
was moved from the south hot cell to the
spent target vault. see attached pdf for
 Vault_Storage_November_24_2016.pdf 
  1452   Thursday, March 16, 2017, 10:32 David WangSpent Target VaultRepairTM4 TM4 and its silo rust photosI watched rust on TM4 and its silo. Most
of rust are on est side of module and silo.
See attachments
 13x 
  1454   Tuesday, March 21, 2017, 10:05 Travis CaveSpent Target VaultStandard Operation  Spent target assay.All target in the ISAC spent target vault
have been either assayed or had their fields
measured or both.
 Vault_Storage_March_20_2017.pdf 
  1461   Friday, March 24, 2017, 11:12 Keith C NgSpent Target VaultStandard Operation  2A window transferTransfered the 2A window from the ISAC
Storage Vault to the Cyclotron Vault Tunnel
Storage area. RPG storage form attached.
 2017mar24_vault_tunnel_storage_form(1).pdf 
  1462   Friday, March 24, 2017, 11:19 Keith C NgSpent Target VaultStandard Operation 2A3 windowWindow now in vault


   
        
            
 2017mar24_vault_tunnel_storage_form(1).pdf 
  1463   Friday, March 24, 2017, 13:21 Travis CaveSpent Target VaultStandard Operation 2A window2A window has been removed from the vault.2A window has been removed from the vault
and moved over the cyclotron vault tunnels. 
Attached is the updated storage vault list.
 Vault_Storage_March_24_2017.pdf 
  1465   Monday, March 27, 2017, 12:55 David WangSpent Target VaultRepair  S/W silo rust clean upRust on S/W silo and cover plate stored
at silo area are cleaned up.
 rust_removal_at_sw_silo_001.JPGrust_removal_at_sw_silo_002.JPGrust_removal_at_sw_silo_003.JPGrust_removal_at_sw_silo_004.JPGrust_removal_at_sw_silo_005.JPG 
  1519   Tuesday, May 02, 2017, 13:49 Travis CaveSpent Target VaultStandard Operation  Spent Targets movedFive spent targets have been moved from
the target storage vault to the mini vault
in preparation for Thursdays loading of the
 Mini_Vault_Storage_May_2_2017.pdfVault_Storage_May_2_2017.pdf 
  1528   Monday, May 08, 2017, 14:46 Travis CaveSpent Target VaultMaintenance  Mini Vault Door Mini Vault Door as some difficulty
over coming a small hump on its track. To
open the door one needs to give the door
  
  1542   Thursday, May 18, 2017, 10:41 Travis CaveSpent Target VaultStandard Operation UC#19Spent Target moveThe spent UC#19 target has been moved from
the south hot cell into the spent target
storage. It was placed in pail #145 and put
 Vault_Storage_May_18_2017.pdf 
  1556   Monday, June 12, 2017, 13:51 Travis CaveSpent Target VaultStandard Operation  Spent Target moveThe spent Ta#51 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail#149 and put in spot
 Vault_Storage_June_12_2017.pdf 
  1575   Thursday, June 29, 2017, 14:42 Travis CaveSpent Target VaultStandard Operation UC#20Spent Target Move The spent UC#20 has been moved from
the south hot cell to the spent target vault.
It was placed in pail #150 and spot 1B in
 Vault_Storage_June_29_2017.pdf 