ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
1269
|
Tuesday, June 28, 2016, 14:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Many | Spent target assay. |
The spent target assay were finally started or re-started today. Four targets were done today.
June 29 2016 another four targets were done today.
June 30 2016 all targets have assayed and measured. see the attached PDFs for the results. |
1270
|
Thursday, June 30, 2016, 13:33 |
Dan McDonald | Spent Target Vault | Maintenance | | | F308's |
The five spent target F308 flasks where gone through in accordance with Nordion guidelines, the sixth spare is remains in the Hot Cell area. All flasks where in reasonable shape with two needing weld repairs on the pallets. I replaced all the 3/4" pallet to flask fasteners with new Grade 8 bolts nut and washer combo. Flasks have been moved into the Hot Cell area awaiting movement into the Target Hall. |
1280
|
Monday, July 11, 2016, 10:59 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#48 | Spent Target move |
The spent Ta#48 was moved from the south hot cell to the spent target vault. I was placed in pail 139 and is in spot 6C in the vault. It was 201mSv/hr when measured at the hot cell. See the attached PDF for the latest results. |
1305
|
Thursday, August 04, 2016, 08:56 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#16 | Spent Target move |
The spent UC #16 have been moved from the south hot cell to the storage vault see attached PDF for details. |
1340
|
Thursday, August 25, 2016, 14:25 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#33 | Spent Target move |
SiC#33 was placed into pail #141 which in turn was placed into slot 2B of the vault. I was 295mS/hr upon removal from the south hot cell. |
1362
|
Monday, September 26, 2016, 13:59 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#17 | Spent Target move |
The spent UC#17 has been moved from the south hot cell to the spent target vault. See the attached pdf for details. |
1373
|
Thursday, October 20, 2016, 10:45 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#49 | Spent Target move |
Ta#49 has been removed from the south hot cell and placed in the storage vault. It is in pail 146 and in spot 6A. |
1392
|
Monday, November 07, 2016, 10:35 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#34 | Spent Target move |
Spent SiC#34 was moved on the 3rd of November and placed in the spent target vault. See attached pdf for details. |
1407
|
Friday, November 25, 2016, 09:04 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#35 | Spent Target move |
On November 24th 2016 the spent SiC#35 was moved from the south hot cell to the spent target vault. see attached pdf for details. |
1452
|
Thursday, March 16, 2017, 10:32 |
David Wang | Spent Target Vault | Repair | TM4 | | TM4 and its silo rust photos |
I watched rust on TM4 and its silo. Most of rust are on est side of module and silo. See attachments |
1454
|
Tuesday, March 21, 2017, 10:05 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target assay. |
All target in the ISAC spent target vault have been either assayed or had their fields measured or both. |
1461
|
Friday, March 24, 2017, 11:12 |
Keith C Ng | Spent Target Vault | Standard Operation | | | 2A window transfer |
Transfered the 2A window from the ISAC Storage Vault to the Cyclotron Vault Tunnel Storage area. RPG storage form attached. |
1462
|
Friday, March 24, 2017, 11:19 |
Keith C Ng | Spent Target Vault | Standard Operation | | 2A3 window | Window now in vault |
Travis Cave wrote: |
The 2A3 window now has a lid, and lift yolk on it and it has been installed in the spent target vault in spot 2A. The lid is a normal unmodified and has no sealant on it.
|
The pail containing window was transferred from the Storage Vault to the Cyclotron Vault Tunnel Storage 2017 Mar 24. It was placed in a brick bunker along the north wall and marked with item #1434. RPG storage form is attached.
Highest field measured at 0.5 m was 3000 uSv/h with an estimate of 4000 uSv/h on contact with the pail. Pail exterior was not contaminated. See attached storage form for details.
|
1463
|
Friday, March 24, 2017, 13:21 |
Travis Cave | Spent Target Vault | Standard Operation | | 2A window | 2A window has been removed from the vault. |
2A window has been removed from the vault and moved over the cyclotron vault tunnels. Attached is the updated storage vault list. |
1465
|
Monday, March 27, 2017, 12:55 |
David Wang | Spent Target Vault | Repair | | | S/W silo rust clean up |
Rust on S/W silo and cover plate stored at silo area are cleaned up. |
1519
|
Tuesday, May 02, 2017, 13:49 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Targets moved |
Five spent targets have been moved from the target storage vault to the mini vault in preparation for Thursdays loading of the F-308s. See attached for the list of targets in the mini vault, and the new status of the storage vault. |
1528
|
Monday, May 08, 2017, 14:46 |
Travis Cave | Spent Target Vault | Maintenance | | | Mini Vault Door |
Mini Vault Door as some difficulty over coming a small hump on its track. To open the door one needs to give the door a slight tug while it is opening to over come this hump. |
1542
|
Thursday, May 18, 2017, 10:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#19 | Spent Target move |
The spent UC#19 target has been moved from the south hot cell into the spent target storage. It was placed in pail #145 and put in tray one spot C. See attached PDF for all vault details. |
1556
|
Monday, June 12, 2017, 13:51 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target move |
The spent Ta#51 target has been moved from the south hot cell to the spent target vault. It was placed in pail#149 and put in spot 8B of the vault. |
1575
|
Thursday, June 29, 2017, 14:42 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#20 | Spent Target Move |
The spent UC#20 has been moved from the south hot cell to the spent target vault. It was placed in pail #150 and spot 1B in the vault. See attached for details of the vault. |