  2380   Wednesday, October 19, 2022, 12:04 Carla BabcockConditioning StationRepair  TCS:TBHT taken as replacement for ITE:TBHTDuring the last ITE run with the SiC#44
target, the ITE:TBHT controls card was fried
twice. The first time we put in our spare,
  
  312   Monday, April 22, 2013, 11:35 Bevan MossConditioning StationRepairTM3N/ATCS:DIF2 broken The flow meter on the primary side
(TCS:DIF2) of the conditioning station is
broken. I investigated and there is flow,
  
  767   Friday, October 17, 2014, 13:36 Anders MjosConditioning StationMaintenance  TCS:Chil staging not operationalNOTE: If cooling is required, the
compressors will have to be run manually.
Make sure to switch it off again when the
  
  2694   Friday, September 27, 2024, 07:29 David WangConditioning StationRepair  TCS water system resistivity analyzer has been repaired.TCS water system resistivity analyzer has
been repaired. Two diodes and one capacitor
on PS board were broken. They were replaced.
  
  1391   Thursday, November 03, 2016, 09:01 David WangConditioning StationStandard OperationTM4 TCS water system has been started for TM4.The system works fine. All water signals
to TM4 at TCS are normal. HV cover is installed
on to TM4 at TCS.
  
  2708   Thursday, October 24, 2024, 10:37 David WangConditioning StationStandard Operation  TCS water system functionnal test. TCS water system has been started for functional
test. System parameters including  pressure,
all temperature sensors, flow rate sensors,
  
  2606   Wednesday, June 05, 2024, 11:32 David WangConditioning StationStandard Operation  TCS water system filters have been changed. TCS water system  five filters were
changed yesterday by plant group Dan.T. Service
labels on filters are updated.  No water
  
  1217   Thursday, April 28, 2016, 06:28 David WangConditioning StationMaintenanceTM2 TCS water system are turned off. TCS water system worked fine overnight.
I turned off TCS water system at 6:16 AM
this morning. Start of purging TM2 water
  
  1408   Tuesday, November 29, 2016, 06:27 David WangConditioning StationStandard OperationTM2 TCS water pumps are stoppedArgon venting on TCS and TM2 is processing   
  2454   Monday, June 12, 2023, 07:36 David WangConditioning StationStandard Operation  TCS water filters annual change. Plant group changed TCS water filters last
Friday. 4 filters on resin can inet /outlet
sides and filters(4 in one cartridge house)on
  
  2585   Wednesday, May 08, 2024, 12:36 David WangConditioning StationStandard OperationTM3UCx#44TCS was argon vented this morning between 7:00 to 8:30 am.TCS was argon vented this morning between
7:00 to 8:30 am before module was moved to
ITE.
  
  2600   Tuesday, May 28, 2024, 07:45 David WangConditioning StationStandard OperationTM4UCx#45TCS was argon vented this morning between 6:00 and 7:30am. TCS was argon vented this morning between
6:00 and 7:30am for TM4 moving to ITW.
  
  2049   Tuesday, January 14, 2020, 10:19 David WangConditioning StationStandard OperationTM3 TCS vacuum system is switched off. TM3 TP1 and TP2 work  fine in past
4 days. During operation, The current draw
on pumps were 0.7A to 0.8 A. TM3 will be
  
  2067   Friday, February 14, 2020, 14:06 David WangConditioning StationStandard OperationTM4 TCS vacuum system and water sytem are switched on.All turbo pumps are started.     
  1849   Wednesday, January 09, 2019, 06:26 David WangConditioning StationStandard Operation  TCS vacuum pumps have been stopped.The tCS will be vented soon for TM2 move
later this week.
  
  1866   Thursday, February 14, 2019, 07:13 David WangConditioning StationStandard OperationTM2 TCS vacuum pumps have been stopped.Preparation on TM2 move from TCS to SHC.   
  1894   Monday, March 18, 2019, 07:25 David WangConditioning StationMaintenanceTM3 TCS vacuum pumps have been stopped. The TCS will be vented soon for TM2
move.
  
  1400   Tuesday, November 22, 2016, 14:26 David WangConditioning StationStandard Operation  TCS vacuum pumps are switched offTCS will be vented tomorrow morning for
TM2 moving.
  
  490   Friday, October 04, 2013, 19:39 Grant MinorConditioning StationStandard OperationTM3NiO#2TCS vacuum improvement w/ heaters off - 2:20 pm to 7:17pmHere is the change in the TCS vacuum after
heaters were turned off earlier today:
2:20 pm readings
  
  1540   Wednesday, May 17, 2017, 08:35 David WangConditioning StationStandard OperationTM4 TCS turbo pumps was started yesterdayAnders started TCS turbo-pumps yesterday.
The TCS and TM4 pumping down is good so far.
I started TCS water pumps this morning for
  