2720
|
Monday, November 25, 2024, 09:56 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 move - silo to SHC | TM3 was moved from silo to SHC with no
target. Move successful. |
|
2721
|
Tuesday, November 26, 2024, 13:03 |
Frank Song | South Hot-Cell | Standard Operation | TM3 | UCx#47 | electrical check/leak check | An electrical check and leak check had
been done after new target UCx47 was installed
on TM3 in SHC. see attachment pls. |
|
2723
|
Tuesday, November 26, 2024, 14:52 |
Aaron Tam | South Hot-Cell | Standard Operation | TM3 | UCx#47 | UC#47 LP-SIS w/ gas Install | November 26, 2024 - Aaron Tam
Handover from TPO and inspection
Completed
Some |
6x |
2724
|
Thursday, November 28, 2024, 16:13 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 Parasitics | TiC#9 Parasitics Leak Check and removal from hotcell | November 27th, 2024 - Aaron Tam with
Farran & David
Parasitic Assembly Leak Check (Aaron, |
    |
2726
|
Tuesday, December 03, 2024, 10:51 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 move - ITE to SHC | TM2 was moved from ITE to SHC with Ta#68
target. During the move, a railing was lightly
bumped by the corner of the module - no obvious |
|
2727
|
Tuesday, December 03, 2024, 12:28 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM3 move - TCS to ITE | TM3 was moved with UCx#47 from TCS to ITE.
The move was smooth. |
|
2728
|
Tuesday, December 03, 2024, 15:53 |
Aaron Tam | South Hot-Cell | Standard Operation | TM2 | Ta#68 | Ta#68 Removal | Note: Ta#68 had a difficult
install. See E-log ID# 2698 for more info
First look: |
22x |
2731
|
Wednesday, December 04, 2024, 10:40 |
Adam Newsome | South Hot-Cell | Standard Operation | TM2 | | TM2 move - SHC to silo | TM2 was remotely moved from the South Hot
Cell to SW Silo. Reading at SHC = 89.8 mSv/h.
The move was smooth. |
|
2732
|
Wednesday, December 04, 2024, 14:30 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68 | Ta#68 PIE | Abstract:
This target has seen some irregular
beam patterns |
32x |
2733
|
Thursday, December 05, 2024, 11:43 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68 | Pail loading - Ta#68 & Others into Pail#300 | December 5, 2024 - Aaron Tam w/ help from
Chad, Peter and Adam at the Crane
Hot Cell Prep: |
    |
2743
|
Wednesday, January 08, 2025, 07:37 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#46 | UCx#46 removal | UCx#46 removed from TM4 and placed into
a pail back-filled with argon. Nothing visually
unusual; no issues. |
 |
2748
|
Tuesday, January 14, 2025, 10:00 |
David Wang | South Hot-Cell | Standard Operation | TM3 | UCx#47 | after operation electrical check, Tm3 UCx 47 | TM3 UCx#47 after operation electrical check
is done at SHC. The result is normal. See
attachment. |
|
2754
|
Monday, January 27, 2025, 08:27 |
om David Wang | South Hot-Cell | Maintenance | | parasite target | Transfer parasite target from SHC to NHC. | A parasite target has been transferred
from SHC to NHC. It is a job to reduce SHC
field for coming SHC entry job. The transfer |
|
2757
|
Wednesday, January 29, 2025, 11:10 |
chad fisher | South Hot-Cell | Standard Operation | | | Pre-entry field Check | Fields in the hot cell were checked using
a pole monitor. Field approximately in the
area someone would stand to repair manip. |
|
2766
|
Monday, February 10, 2025, 11:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | No target | TM2 has been moved from W_S silo to SHC. | Remotely removed TM2 from S-W silo to SHC
. Peter and I did the move. It is successful.
|
|
2767
|
Tuesday, February 11, 2025, 10:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | Conductor Block Insulator Replacement | Ceramic conductor blocks ITD0053 and ITD0054
were replaced on TM2. Initially, only ITD0053
was to be replaced but after removing it |
  |
2769
|
Friday, February 14, 2025, 10:48 |
David Wang | South Hot-Cell | Standard Operation | TM2 | No target | TM2 has been moved from SHC to TCS. | TM2 has been moved from SHC to TCS successfully.
Travis and I did the move. |
|
2775
|
Thursday, February 20, 2025, 11:29 |
chad fisher | South Hot-Cell | Standard Operation | | | Field Check | After removing the previously found extraction
electrode and other suspect components the
field at the manipulator tongs (in front |
|
2779
|
Wednesday, February 26, 2025, 09:59 |
David Wang | South Hot-Cell | Standard Operation | | | SHC Field measurement from TH | After waste transfer, I did a SHC field
measurement from TH through top flange opening.
The general field around manipulator maintenance |
|
1857
|
Friday, January 11, 2019, 13:59 |
Isaac Earle | Safe Module Parking | Development | | | SMP motor selection decision | SMP drivetrain design work is currently
underway. Alejandro has selected a
suitable 1200:1 reducer which will give a |
|