Entry  Wednesday, August 21, 2024, 10:53, Travis Cave, Spent Target Vault, Standard Operation, , TiC#7, Spent Target Move Target_Index_2024-08-21.pdf
 TIC#7 was placed in pail #294 and then moved from the south hot cell to the spent target vault spot 4B. It was 82.3mSv/hr when removed from the
SHC. See attached PDF for details.
Entry  Monday, August 26, 2024, 09:57, Travis Cave, Spent Target Vault, Standard Operation, , Nb#10, Spent Target Move Target_Index_2024-08-26.pdf
 Nb#10 was placed in pail#295 and moved from the south hot cell to the spent target vault, spot 4A, it was 230uSv/hr when removed from the SHC.
See attached PDF for vault details.
Entry  Tuesday, October 15, 2024, 13:44, Travis Cave, Spent Target Vault, Standard Operation, , TiC#8 and Ta#67, Spent Target Move Target_Index_2024-10-15.pdf
 On Friday October 11th TiC#8 and Ta#67 were place in the spent target vault in Tray 8. See attached PDF for details. 
Entry  Thursday, October 24, 2024, 10:42, Travis Cave, Spent Target Vault, Standard Operation, , SiC#44, Target repacked moved to the mini vault. Mini_Vault_Index_2024-10-24.pdf
 On October 22 2024 the spent SIC#44 returned from CNL was repacked in a new pail it was in pail 275 and repacked into pail 298 it was 2.34mSv/hr
when removed from the south hot cell.
It was placed in the very back of the mini vault. 
Entry  Friday, November 08, 2024, 10:39, Travis Cave, Spent Target Vault, Standard Operation, , TiC#9, Spent Target Move Target_Index_2024-11-08.pdf
 TiC#9 was placed in Pail 299 in spot 8A of the vault and was 92.1mSv/hr when removed from the south hot cell. See attached pdf for full vault details.
Entry  Monday, January 13, 2025, 10:02, Travis Cave, Spent Target Vault, Standard Operation, , UC#46, Spent Target Move Target_Index_2025-01-13.pdf
UC#46 was placed in pail# 301 in spot 1B and was 26.3mSv/hr when removed from the SHC. See attached PDF for vault 
details.
Entry  Thursday, January 16, 2025, 10:03, Travis Cave, Spent Target Vault, Standard Operation, , UC#47, Spent Target Move Target_Index_2025-01-16.pdf
 The spent UC#47 was moved from the south hot cell to the spent target vault placed in pail #302 in spot 1C of the vault, it was 24.5mSv/hr when
removed from the south hot cell. See attached for vault details.
Entry  Monday, July 28, 2014, 17:26, Ron Kuramoto, ITW, Repair, , , ITW:IV5 Air leak repair DSCN0087.JPG20140728_142855_-_small.jpg20140728_143202_-_small.jpg
Air leak was found at the Solenoid control valve located in the Pre-Separator & DB0 room.  The gasket between
the solenoid body and its manifold block was broken, see attached photos. The gasket and solenoid body were replaced. Air was turned back on
to IV5 (B/L gate valve) with no apparent air leaks. The gate valve was actuated open & closed from the control room seeing both limits successfully.
Entry  Thursday, May 09, 2024, 13:52, Riley Sykes, Waste Package/Ship, Standard Operation, , , F308 Service/Inspection 
 F308 Inspection and service complete on #06, #08, #13, #15, #16, #19, #20, #21, #22.
All in good condition with new gasket material installed on #20.
Prepped for move to ISAC B3 for storage.
Entry  Wednesday, July 10, 2024, 10:44, Riley Sykes, South Hot-Cell, Maintenance, , , Spring idler install Image.jfifImage_(2).jfif
 New spring idlers were installed onto rotational chain drive for SHC roof. Operation ran smoothly in both directions to full limit. Chain was noted
to have adequate slack when not on driven side. Periodic checks to confirm operation will continue in the following months to guarantee proper operation.
Entry  Friday, July 12, 2024, 08:51, Riley Sykes, Safe Module Parking, Maintenance, , , SMP chain guard 
 SS washers were added to all slotted holes on SMP chainguard cover plate
Entry  Thursday, June 30, 2011, 16:04, Pierre Bricault, Conditioning Station, Repair, TM1, , TM1 status 
Friday June 24 2011
The target module has been moved to the Conditioning Station (CS)
Pumping overnight
Entry  Tuesday, August 02, 2011, 09:41, Pierre Bricault, Conditioning Station, Repair, TM1, ITW-TM1-Ta#37-LP-SIS, Test high voltage on TM1 
 TM1 has received the Ta#37-LP and has been pumping since thursday. This morning the pressure gauges read, IMG1: 1.6x10^-6 T and IG1: 7.4x10^-7
T.
The high voltage power supply has been connected to all high voltage feedthroughs and the voltage raise to 42 kV. 
Entry  Monday, April 04, 2022, 10:44, Nadia Jorgenson, South Hot-Cell, Repair, , , Turntable Chain Repair Hot_Cell_Chain_1.jpgHot_Cell_Chain_2.jpg
 Last week we repaired the South Hot Cell turntable chain/sprocket. Chain was loose
and there was a few section where the chain was not lining up properly with the sprockets.
3 issues were discovered:
Entry  Wednesday, May 11, 2022, 16:15, Nadia Jorgenson, Spent Target Vault, Standard Operation, , , Emergency Close Mechanism Test 
 The emergency close mechanism for the Storage Vault door was tested by Travis Cave, Nadia
Jorgenson, and Dan McDonald. The door was opened to its fully open limit, then closed with the emergency system. 
The test was successful.
Entry  Wednesday, May 11, 2022, 16:29, Nadia Jorgenson, Spent Target Vault, Standard Operation, , , Routine mechanical inspection: storage vault Motor_wiring_ISAC_storage_vault.jpg
 An inspection was performed on drive systems for the main storage vault by Dan McDonald, Travis Cave and
Nadia Jorgenson. The functionality was not tested. Some areas for improvement noted, but otherwise nothing concerning was discovered. 
 
Entry  Wednesday, May 25, 2022, 10:23, Nadia Jorgenson, Spent Target Vault, Repair, , , F-308 Loading, Mini-Storage Vault Failure 
5 pails were moved from the mini-storage vault into F-308's
At one point during the loading the mini-storage vault door would not close. Cause was a blown fuse, which was replaced and operations were able
to continue as usual. Possible reason the fuse blow was a tilted pail that may have become jammed between the tray and the roof of the mini-storage vault. 
Entry  Thursday, June 30, 2022, 14:28, Nadia Jorgenson, Safe Module Parking, Standard Operation, , , Annual Inspection of Safe Module Parking - Electrical  
 
An annual electrical inspection was performed on the SMP today by Travis Cave and
Nadia Jorgenson as per Work Permit I2022-06-30-2. The following items were checked:
Entry  Monday, July 04, 2022, 11:44, Nadia Jorgenson, Safe Module Parking, Standard Operation, , , Annual Inspection of Safe Module Parking - Mechanical  SMP_Missing_Washers_1.jpgSMP_Missing_Washers_2.jpgSMP_Missing_shims.jpg
 
An annual mechanical inspection was performed on the SMP today
by Dan McDonald and Nadia Jorgenson. The following items were checked:
Entry  Monday, July 04, 2022, 11:54, Nadia Jorgenson, Spent Target Vault, Maintenance, , , Added Lubrication,fittings need to be changed Mini_Vault_Grease_Fitting.jpg
Dan lubricated components on the target storage vault (This was an outstand task from annual inspection). No issues on the main storage vault but we
were not able to lubricate the mini storage vault because the position of the grease nipple on the fittings makes them inaccessible, see attached pictures.
All four should be replaced with 90 deg fittings. 