  ID Date Author Categorydown Type Module Target/Number Subject
  806   Monday, December 01, 2014, 14:48 Travis CaveSpent Target VaultStandard Operation  F-308s moved

The F-308s have been moved into the target hall,  for filling on wednesday.

  811   Thursday, December 04, 2014, 09:57 Travis CaveSpent Target VaultStandard Operation  Spent target placed in F-308.

Spent targets in the mini storage were placed into the F-308s yesterday, all F-308 have been removed from the the target hall and they no reside for the time being in the hallway between the north and south hot cells.

  861   Friday, March 13, 2015, 13:36 Travis CaveSpent Target VaultStandard Operation ThO#1Spent Target Move

The ThO#1 has been placed in the storage vault placed in pail #122 in spot 2B of the vault. It was 6.2mSv/hr upon removal from the south hot cell. see attached PDF for details.

Attachment 1: Storage_Vault_March_13_2015.pdf
Storage_Vault_March_13_2015.pdf Storage_Vault_March_13_2015.pdf Storage_Vault_March_13_2015.pdf Storage_Vault_March_13_2015.pdf
  864   Tuesday, March 17, 2015, 10:33 Travis CaveSpent Target VaultStandard Operation UC#11Spent Target Move

The spent UC#11 has benn moved from the south hot cell to the spent target vault. See attached PDF for details.

Attachment 1: Vault_Storage_March_17_2015.pdf
Vault_Storage_March_17_2015.pdf Vault_Storage_March_17_2015.pdf Vault_Storage_March_17_2015.pdf Vault_Storage_March_17_2015.pdf
  975   Thursday, July 02, 2015, 11:51 Travis CaveSpent Target VaultStandard Operation UC#12Spent target moved

UC#12 has been moved from the south hot cell and placed into storage. It is in pail #125 and in spot 1C of the vault it had a reading of 25.1mSv/hr upon removal from the south hot cell. See PDF for vault details.

Attachment 1: Vault_Storage_July_2_2015.pdf
Vault_Storage_July_2_2015.pdf Vault_Storage_July_2_2015.pdf Vault_Storage_July_2_2015.pdf Vault_Storage_July_2_2015.pdf
  1027   Thursday, July 30, 2015, 14:05 Travis CaveSpent Target VaultStandard Operation SiC#31Spent target moved

SiC#31 has been moved to the spent target vault. It is in pail #127 and placed in spot 3C of the vault is was 489mSv/hr when removed from the south hot cell. See attached pdf for vault status

Attachment 1: Vault_Storage_July_30_2015.pdf
Vault_Storage_July_30_2015.pdf Vault_Storage_July_30_2015.pdf Vault_Storage_July_30_2015.pdf Vault_Storage_July_30_2015.pdf
  1029   Thursday, August 06, 2015, 10:26 Travis CaveSpent Target VaultStandard Operation  Spent Target Measurments and Assays

All targets but one ( SiC#31 went in last week) have been measured or assayed. See attached PDF for the details.

Attachment 1: Vault_Storage_August_6_2015.pdf
Vault_Storage_August_6_2015.pdf Vault_Storage_August_6_2015.pdf Vault_Storage_August_6_2015.pdf Vault_Storage_August_6_2015.pdf
  1071   Thursday, September 17, 2015, 11:50 David WangSpent Target VaultRepairTM1 TM1 window circuit leak check

 Leak check TM1 window circuit soldering stems inside service cap when module is located at NE silo. LD base LR 0.0xE-9atm.cc/sec.  Only 1 second tiny amount  helium sprayed on stems soldering joints . LD got a quick response to high E-7 atm.cc/sec.Test is repeated again with same result.  See attachments

Attachment 1: TM1_leak_soldering_stems_001.JPG
TM1_leak_soldering_stems_001.JPG
Attachment 2: TM1_leak_soldering_stems_003.JPG
TM1_leak_soldering_stems_003.JPG
  1089   Thursday, October 01, 2015, 09:18 Travis CaveSpent Target VaultStandard Operation  Targets transfered to mini storage.

In preparation for shipping of the spent targets five have been moved to the mini storage. The following target were moved to the mini storage, SiC#26, Ta#36, UC#9,10,11.

  1112   Friday, October 23, 2015, 07:41 Dan McDonaldSpent Target VaultMaintenance  F-308's

Six F-308's where received from Nordion #6,#15,#13,#16 all contained contamination. Loose contamination was removed with some fixed contamination remaining levels are low enough to allow the transport of spent targets. flasks where serviced as per Nordion Document IS/PP 0009 F308, IS/PP 0981 F308. Flasks are now located in the north hot cell area.

  1114   Friday, October 23, 2015, 11:40 Travis CaveSpent Target VaultStandard Operation ZrC #7Spent target moved

The spent ZrC#7 target has been moved from the south hot cell to the spent target vault. The target was placed in pail #129 and then placed in slot 3B of the vault, it was 157mSv/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_October_23_2015.pdf
Vault_Storage_October_23_2015.pdf Vault_Storage_October_23_2015.pdf Vault_Storage_October_23_2015.pdf Vault_Storage_October_23_2015.pdf
  1115   Thursday, October 29, 2015, 13:59 Travis CaveSpent Target VaultStandard Operation  Filling F-308s

Five F-308s have been filled with the spent targets. The F-308s have been moved to the hall way between the north and south hot cell areas.

  1141   Thursday, November 26, 2015, 08:52 Travis CaveSpent Target VaultStandard Operation Ta#46Spent Target move

Ta#46 was placed in the ISAC spent target vault yesterday. See attached PDF for details.

Attachment 1: Vault_Storage_November_26_2015.pdf
Vault_Storage_November_26_2015.pdf Vault_Storage_November_26_2015.pdf Vault_Storage_November_26_2015.pdf Vault_Storage_November_26_2015.pdf
  1152   Wednesday, January 13, 2016, 09:57 Travis CaveSpent Target VaultStandard Operation Ta#35, Ta#39, SiC#27, UC#12, ThO#1Spent targets moved to mini storage.

Five spent targets have been moved from the Spent Target Vault to Mini Storage in preparation for transfer to F-308s in February. The following targets were moved Ta#35, Ta#39, SiC#27, UC#12, ThO#1

  1155   Friday, February 19, 2016, 06:58 maicodallavalleSpent Target VaultMaintenance  F-308's serviced/loaded/ bolts torqued

Five F-308's were loaded with spent ISAC targets. All five F-308's were serviced two weeks ago. All bolts were torqued and security  cables were installed  for shipment.

  1177   Tuesday, March 22, 2016, 10:27 Travis CaveSpent Target VaultStandard Operation SiC#32Spent Target move

SiC#32 has been moved from the south hot cell to the spent target storage. See attached PDF for details.

Attachment 1: Vault_Storage_March_22_2016.pdf
Vault_Storage_March_22_2016.pdf Vault_Storage_March_22_2016.pdf Vault_Storage_March_22_2016.pdf Vault_Storage_March_22_2016.pdf
  1204   Monday, April 11, 2016, 10:07 Travis CaveSpent Target VaultStandard Operation UC#14Spent Target move

The spent UC#14 target has been moved into the ISAC spent target vault. See the attached PDF for the details.

Attachment 1: Vault_Storage_April_11_2016.pdf
Vault_Storage_April_11_2016.pdf Vault_Storage_April_11_2016.pdf Vault_Storage_April_11_2016.pdf Vault_Storage_April_11_2016.pdf
  1244   Tuesday, May 24, 2016, 10:52 Travis CaveSpent Target VaultStandard Operation UC#15Spent Target move

Spent UC#15 has been moved from the south hot cell to the spent target storage. It was placed in pail number 136, and placed in spot C of tray one. It was 14.1mSv/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_May_24_2016.pdf
Vault_Storage_May_24_2016.pdf Vault_Storage_May_24_2016.pdf Vault_Storage_May_24_2016.pdf Vault_Storage_May_24_2016.pdf
  1266   Wednesday, June 15, 2016, 09:39 Travis CaveSpent Target VaultStandard Operation Ta#47Spent Target move

The spent Ta#47 target has been moved from the south hot cell to the spent target vault. It was placed in pail #137 in spot 4C of the vault. It was 114mSv/hr upon removal from the vault.

Attachment 1: Vault_Storage_June_15_2016.pdf
Vault_Storage_June_15_2016.pdf Vault_Storage_June_15_2016.pdf Vault_Storage_June_15_2016.pdf Vault_Storage_June_15_2016.pdf
  1267   Tuesday, June 21, 2016, 13:47 Travis Cave/ Dan McDonaldSpent Target VaultRepair  Spent Target Vault Door

The spent target vault door does not open or close. The emergency door closing did have to be used to close the door as it was locked in an open position, the door stopped just off the open override limit. The door was closed and the spent target that was being assayed was placed into the mini storage. The problem with the door appears to be related to the motor itself, as all the controls to the motor appear to be in working order. Also it was noticed on the emergency door closing winch the wire rope has a kink in it from sitting in open position for so long this can cause the wire rope to jump from the pulleys.

 

6/27/2016  Dan McDonald. Replacement motor was ordered from Beaver Industries Friday the 24th received this morning the 27th. Once received Travis wired the motor to its proper operating orientation. Once the motor was wired  it was  set it up and plugged it in to test rotation and control function, at this point we disconnected the motor and re installed it to the gear box. Ran three open close sequences to ensure all was well. In the case of the emergency cable system a plan is being developed to correct the cable slack and kinking problem. We went ahead and ordered a spare  vault motor which is located in the RH Machine Shop 