Entry  Monday, September 23, 2024, 11:31, David Wang, South Hot-Cell, Development, TM3, , 10 pins lectrical check result after insulator is installed on water cap C.  
10 pins lectrical check result after insulator is installed on water cap C. 
pin 14 to 60kv bias has 20 Kohm @250V Megga check. The rest check on ohmmeter and megga @250 are either OLor over 25Mohm which are good. 
Entry  Monday, September 23, 2024, 11:26, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 window line has been leak checked.  
TM3 window line has been leak checked after containment box removal and installation for insulator installation on water cup C.   No leak.
Entry  Wednesday, September 18, 2024, 13:47, David Wang, South Hot-Cell, Standard Operation, TM3, TiC#8, Tm3 has been moved from silo to SHC. 
Tm3 has been moved  from silo to SHC. The move is smooth. 
Entry  Wednesday, September 18, 2024, 13:40, Aaron Tam, South Hot-Cell, Standard Operation, TM3, TiC#8, Target removal  13x
 TiC#8 HP FEBIAD removed from TM3
Target sitting in SHC
1 Coil Conductor bolt fell under source tray 
Entry  Tuesday, September 17, 2024, 13:42, Frank Song, ITW, Standard Operation, TM4, TiC#9 , Module Connection TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf
 TM4 with target TiC#9 is connected in ITW. See attachment.
Entry  Tuesday, September 17, 2024, 11:16, David Wang, ITW, Standard Operation, TM4, TiC#9, TM4 has been moved from TCS to ITW. 
TM4 has been moved from TCS to ITW. The move is smooth.
Entry  Monday, September 16, 2024, 08:48, chad fisher, Manipulator Maintenance, Maintenance, , , CRL Technicain Manipulator Maitenance Trip Triumf_Document_2024-09-20_102936.pdf
Over the course of September 9th - September 13, 2024 a CRL manipulator technician carried out the following manipulator maintenance:
NHC operator side arm #9763 (right side installed position) - Inspection and re-tensioning of tong cable prior to re-installation (was a little
too tight). Operational.
Entry  Monday, September 16, 2024, 08:23, chad fisher, North Hot-Cell, Repair, , , Model N Remote end #9352 reapir 
On Friday, September 6, 2024 Model 'N' remote arm #9352 was removed from the NHC right side installed position to investigate  an ongoing issue
with the tong motion circuit (no motion on the remote side when handle on operator side operated).
Inspection revealed that the tong cable on this arm have hopped its cable drum and rapped around the shaft of the cable drum. As well, the tong
Entry  Thursday, September 12, 2024, 14:12, Adam Newsome, Waste Package/Ship, Development, , SiC#44, Failed waste emplacement at CNL: Flask #22, Pail 275 (SiC#44) Report_on_Inspection_of_Pail_275_on_2024-10-03.pdf
On 2024-09-12, CNL reported difficulty with lowering Pail 275 from F-308 flask #22 into their tile hole. The four other pails associated with this shipment
were successfully emplaced. It is suspected that the issue was related to a kink in the lowering cable, causing a jam during lowering. This was observed
approximately 1 year ago.
Entry  Wednesday, September 11, 2024, 13:38, Adam Newsome, North Hot-Cell, Repair, , , Spare Manipulator - Y-axis motion not functioning 
Update 2024-09-12: C. Fisher confirms this is actually normal behaviour. The Y-axis motion is inhibited when X and Z
are in a certain configuration, which was true when the manipulator was mounted on the wall in storage position. Non-issue. A note about this has been
made in the operator manual.
Entry  Wednesday, September 11, 2024, 07:59, David Wang, Conditioning Station, Standard Operation, TM4, TiC#9, TM4 has been moved from SHC to TCS. 
TM4 has been moved from SHC to TCS. The move is smooth. 
Entry  Tuesday, September 10, 2024, 12:41, Frank Song, South Hot-Cell, Standard Operation, TM4, TiC#9 , electrical check/leak check TM4_with_TiC#9_Surface_electric(leak)_cheak_on_SHC_2024-09-10.pdf
 TM4 with new target TiC#9 Surface installed in SHC was leak/electric checked before moving to TCS. See attached pic pls.
Entry  Tuesday, September 10, 2024, 12:41, Aaron Tam, South Hot-Cell, Standard Operation, TM4, TiC#9, Target TiC#9 HP-SIS installed onto TM4 089c5872-091d-484b-9b9c-dda8444b217b.jfif566cae27-5562-4934-b23a-5c99af810900.jfifcc853ae8-5896-46f3-9f21-f6ede8c82626.jfifffdf443c-2656-499a-9d0a-01ddef2f954a.jfif
September 9, 2024 - Aaron Tam 

    Water from waterline found puddled on source-tray and containment box. 
    Water was wiped up as much as possible, but
likely still in containment box 
    leaving to dry overnight
    Target inserted into Hotcell with nuts for the parasitic target.
Entry  Friday, September 06, 2024, 14:28, Aaron Tam, South Hot-Cell, Standard Operation, , Ta#68(Spare), Ta#68(Spare) removed from TM4 and into Anteroom  
September 5, 2024 -AT

    Plastic and clean target tray added to SHC 
    TM4 moved to SHC 
    TM4 containment box cover removed

September
6, 2024 - AT
Entry  Friday, September 06, 2024, 10:01, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#67 back up. , TM4 has been moved from SMP to SHC. 
TM4 has been moved from SMP to SHC. The move is smooth. 
Entry  Thursday, September 05, 2024, 12:50, Adam Newsome, Crane, Maintenance, , , Overhead crane: up/down hoist delayed start issue 
D. Wang reports that recently the overhead crane has been exhibiting a delayed start (approx. 1 min) when operating in local mode. This issue applies
to the main hoist's up/down functionality only and does not seem to apply to other motion axes. T. Kauss briefly investigated but did not find any obvious
cause.
Entry  Tuesday, September 03, 2024, 11:40, David Wang, ITW, Standard Operation, TM3, TiC#8, TM3 has been moved from ITW to S-W silo. 
TM3 has been moved from ITW to S-W silo. The move is smooth. 
Entry  Tuesday, August 27, 2024, 13:30, Frank Song, ITW, Maintenance, TM3, TiC#8, module disconnection TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf
 TM3 is disconnected and all water lines are purged/refilled with 50psi Nitrogen. Pls see pics attached with.
Entry  Monday, August 26, 2024, 09:57, Travis Cave, Spent Target Vault, Standard Operation, , Nb#10, Spent Target Move Target_Index_2024-08-26.pdf
 Nb#10 was placed in pail#295 and moved from the south hot cell to the spent target vault, spot 4A, it was 230uSv/hr when removed from the SHC.
See attached PDF for vault details.
Entry  Wednesday, August 21, 2024, 10:53, Travis Cave, Spent Target Vault, Standard Operation, , TiC#7, Spent Target Move Target_Index_2024-08-21.pdf
 TIC#7 was placed in pail #294 and then moved from the south hot cell to the spent target vault spot 4B. It was 82.3mSv/hr when removed from the
SHC. See attached PDF for details.