  1351   Wednesday, September 14, 2016, 11:54 David WangConditioning StationRepairTM3 TM3 is disconnected at TCS. TM3 is disconnected at TCS and ready
to be moved to silo.
  
  1352   Wednesday, September 14, 2016, 13:53 Travis CaveConditioning StationStandard OperationTM3no targetModule moveTM#3, no target, has been moved from the
conditioning station to the north east silo.
  
  1412   Wednesday, November 30, 2016, 16:31 David WangConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.All water circuits are by passed on the
top of TM3. Water pumps and vacuum turbo-
pumps are started. Everything is ready for
  
  1414   Monday, December 05, 2016, 10:04 Aurelia LaxdalConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.


   
        
            
  
  1417   Friday, December 09, 2016, 18:05 Aurelia LaxdalConditioning StationRepairTM3 TM3 vacuum system have been connected at TCS.


   
        
            
  
  1490   Wednesday, April 12, 2017, 09:20 Travis CaveSouth Hot-CellRepairTM3no targetModule move TM#3 is now in the south hot cell.   
  1491   Wednesday, April 12, 2017, 12:51 David WangSouth Hot-CellRepairTM3 TM3 Ram readings @ SHC We have a ram installed on SHC pole
which is 0.5 meter to   module shielding
block surface. the readings we got today
  
  1492   Wednesday, April 12, 2017, 13:03 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical CheckElectrical check of TM#3 with no target
at the south hot cell
 TM3_elec_chk_no_tgt.PDF 
  1493   Wednesday, April 12, 2017, 16:39 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 Inspection at the South Hot CellFound spark signs on TM3's containment
on the side of the water blocks. They may
be OLD or/and NEW sparking signs, but this
 DSC_0886.JPGDSC_0883.JPG 
  1494   Thursday, April 13, 2017, 10:32 chad fisherSouth Hot-CellRepairTM3 TM3 Lower Service Tray Video InspectionA video inspection of the lower service
tray was performed this morning. Camera was
inserted upwards into the service tray/service
  
  1504   Wednesday, April 26, 2017, 08:28 chad fisherSouth Hot-CellRepairTM3 TM3 progress and manipulatorscontainment box was re-installed onto TM3
on Monday, Left manipulator may be showing
signs of eminent handle or tong cable failure.
  
  1506   Wednesday, April 26, 2017, 10:40 Travis CaveSouth Hot-CellStandard OperationTM3no targetModule move TM#3 has been moved from the north
east silo to the south hot cell.
  
  1507   Wednesday, April 26, 2017, 13:35 chad fisherSouth Hot-CellRepairTM3 TM3 containment box removedthe containment box has been removed from
TM3.
  
  1508   Wednesday, April 26, 2017, 16:52 Aurelia LaxdalSouth Hot-CellRepairTM3 TM3 Lower Service Tray Video Inspection


   
        
            
 FiberGlassInST.tiff 
  1509   Wednesday, April 26, 2017, 17:37 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 HV tests at atmosphere Pictures from April 19-21, 2017
Please see the first two pictures
of the HV test at atmosphere done on April
 DSC_0950.JPGDSC_0899.JPGSparkMarkEETM3.jpg 
  1510   Wednesday, April 26, 2017, 17:55 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 Schedule updates at the South Hot Cell and CSPlease see TM3's Updated Schedule (the
current schedule) at the SHC and TCS.
For the record I am uploading TM3's
 April_–_May_2107_TM3_Updated_Schedule_at_the_SHC_and_TCS.docxApril_–_May_2107_TM3_Initial_Schedule_at_the_SHC_and_TCS.docx 
  1512   Thursday, April 27, 2017, 19:59 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 HV tests at atmosphere for Each Line(s) April 27, 2017Today a HV test at atmosphere was performed
for Each Line(s), while floating the other
lines.
  
  1514   Sunday, April 30, 2017, 20:57 Aurelia LaxdalSouth Hot-CellRepairTM3no targetTM3 May 1-15, 2017 Tentative Schedule at the SHC and TCSPlease see attachment for TM3 May 1-15,
2017 Tentative Schedule at the SHC and TCS.
 May_2107_TM3_Schedule_at_the_South_Hot_Cell_and_TCS.docx 
  1515   Monday, May 01, 2017, 08:53 chad fisherSouth Hot-CellRepairTM3 Fiberglass removalFiberglass, capton tape and tie straps
have been removed from TM3.
  
  1517   Monday, May 01, 2017, 13:11 David WangSouth Hot-CellRepairTM3 Electrical Check on TM3 after fibergalss is moved in SHC. RU( coil 1), F (anode), and 60kv bias(HS,
Gasline, and MSP)  are shorted together.